HomeMy WebLinkAboutAPPROVED Signed Energy Code 9-16-21(1)FORM R405-2020
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the
Residential Simulated Performance Alternative shall include:
❑ This checklist
❑ Form R405-2020 report
❑ Input summary checklist that can be used for field verification (usually four pages/may be greater)
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page)
❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4
allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to
comply with Section C402.5
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
2020 Duct Leakage Test Report - Performance Method (usually one page)
9/13/2021 8:09:22 AM EnergyGauga@ USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
FORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 7702 Hibiscus Rd PSL Prop Builder Name: PSL Prop
Street: 7702 Hibiscus Rd Permit Office:
City, State, Zip: Ft. Pierce , FL , 34951 Permit Number:
Owner: Cooper Residence Jurisdiction: St. Lucie
Design Location: FL, ST_LUCIE_CO_INTL County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing New (From Plans) W. Wall Type41731.8 sqft.) Insulation Area
2. Single family or multiple family Detached a. Concrete Block - Ext Insul, Exterior R=4.1 1453.30 ft2
b. Frame - Wood, Adjacent R=11.0 278.50 ft2
3. Number of units, if multiple family 1 c. N/A R= ft2
4. Number of Bedrooms 4 d. N/A R= ff2
5. Is this a worst case? No 11. Ceiling Types (1801.0 sqft.) Insulation Area
a. Under Attic (Vented) R=30.0 1801.00 ft2
6. Conditioned floor area above grade (ft2) 1801 b. N/A R= ft2
Conditioned floor area below grade (ft2) 0 c. N/A R= ft2
7. Windows(214.9 sqft.) Description Area 12. Ducts R ft2
q ) escra. Sup: Attic, Ret: Attic, AH: Garage 6 718
a. U-Factor: Dbl, U=0.58 128.44 ft2
SHGC: SHGC=0.24
b. U-Factor: Dbl, U=0.62 46.50 ft2 13. Cooling systems kBtu/hr Efficiency
SHGC: SHGC=0.22 a. Central Unit 40.0 SEER:15.00
c. U-Factor: Dbl, U=0.65 40.00 ft2
SHGC: SHGC=0.21 14. Heating systems kBtu/hr Efficiency
Area Weighted Average Overhang Depth: 3.490 ft. a. Electric Strip Heat 27.0 COP:1.00
Area Weighted Average SHGC: 0.230
8. Skylights Area
c. U-Factor:(AVG) N/A ft2 15, Hot water systems
. SHGC(AVG): N/A a. Electric Cap: 50 gallons
9. Floor Types (1801.0 sqft.) Insulation Area EF: 0.960
a. Slab -On -Grade Edge Insulation R=0.0 1801.00 ft2 b. Conservation features
b. N/A R= ft2 None
c. N/A R= ft2 16. Credits Pstat
Glass/Floor Area: 0.119 Total Proposed Modified Loads: 57.97 PASS
Total Baseline Loads: 58.33
I hereby certify that the plans and specifications covered by Review of the plans and O4THE S7ph g
this calculation are in compliance with the Florida Energy specifications covered by this ti
Code. calculation indicates compliance_;,'' o`
� � ,w with the Florida Energy Code. roar. of.."t: it q;AN °„ O
`" t PREPARED BY: a� Before construction is completed tttG r I O
DATE: 9/1312 221 this building will be inspected for O ,a
compliance with Section 553.908
I hereby certify that this building, as d ne in corn nce Florida Statutes.
with the Florida Energy Code. COD {yF'
OWNER/AGENT: BUILDING OFFICIAL:
DATE: DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7ih Edition (2020) Compliant Software Page 1 of 6
FORMR405-2020
INYUI
bUMMAKYUNtUKLIJI KtVUKI
PROJECT
Title:
7702 Hibiscus Rd PSL Prop
Bedrooms: 4
Address Type: Street Address
Building Type:
User
Conditioned Area: 1801
Lot #
Owner Name:
Cooper Residence
Total Stories: 1
Block/Subdivision:
# of Units:
1
Worst Case: No
PlatBook:
Builder Name:
PSL Prop
Rotate Angle: 315
Street:
7702 Hibiscus Rd
Permit Office:
Cross Ventilation: No
County:
St.
Lucie
Jurisdiction:
St. Lucie
Whole House Fan: No
City, State,
Zip: Ft.
Pierce ,
Family Type:
Detached
FL
, 34951
New/Existing:
New (From Plans)
Comment:
CLIMATE
/
Design Temp
Int Design Temp
Healing
Design Daily Temp
V Design Location
TMY Site 97.5 %
2.5 %
Winter
Summer Degree Days
Moisture
Range
FL, ST_LUCIE_CO_INTL
FL_VERO_BEACH_MUNI 39
90
70
75
299
58
Medium
BLOCKS
Number
Name
Area
Volume
1
Entire House
1801
15773.5
SPACES
Number
Name
Area
Volume Kitchen Occupants
Bedrooms
Infil ID
Finished
Cooled
Heated
1
Laundry
39
312 No
0
1
Yes
Yes
Yes
2
Bed
137
1096 No
0
1
Yes
Yes
Yes
3
Bath
39
312 No
0
1
Yes
Yes
Yes
4
Bath 2
51
408 No
0
1
1
Yes
Yes
Yes
5
Hall
30
240 No
0
1
Yes
Yes
Yes
6
Bed 3
153
1224 No
0
1
1
Yes
Yes
Yes
7
Bed 4
157
1256 No
0
1
1
Yes
Yes
Yes
8
Foyer GR
426
4047 No
3
1
Yes
Yes
Yes
9
Pantry
14
112 No
0
1
Yes
Yes
Yes
10
Kitchen DR
411
3904.5 Yes
2
1
Yes
Yes
Yes
11
Master Bath
95
760 No
0
1
Yes
Yes
Yes
12
Hers
20
160 No
0
1
Yes
Yes
Yes
13
His
9
72 No
0
1
Yes
Yes
Yes
14
Master Bed
220
1870 No
0
1
1
Yes
Yes
Yes
FLOORS
It
Floor Type
Space Perimeter Perimeter
R-Value
Area
Joist R-Value
Tile Wood
Carpet
1 Slab -On -Grade Edge
Insulatio
Laundry 5.5 ft 0
38.5 ft'
____
1 0
0
2 Slab -On -Grade Edge
Insulatio
Bed 2 24 ft 0
136.5 ft'
____
1 0
0
3 Slab
-On -Grade Edge
Insulatio
Bath 1 ft 0
38.5 ft'
____
1 0
0
4 Slab
-On -Grade Edge
Insulatio
Bath 2 6 ft 0
51 ft'
____
1 0
0
9/13/2021 8:09 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 2 of 6
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
FLOORS
# Floor Type
Space Perimeter Perimeter R-Value Area
Joist R-Value
Tile
Wood Carpet
5SIab-On-Grade Edge Insulatio
Hall 1 ft
0
29.8 ft2
----
1
0
0
6 Slab -On -Grade Edge Insulatio
Bed 3 25.5 It
0
153.3 ft2
----
1
0
0
7 Slab -On -Grade Edge Insulatio
Bed 4 21 ft
0
157 112
____
1
0
0
8 Slab -On -Grade Edge Insulatio
Foyer GR 34.5 ft
0
426.3 ft2
____
1
0
0
9Slab-On-Grade Edge Insulatio
Pantry 1 ft
0
13.8 ft2
____
1
0
0
10SIab-On-Grade Edge Insulatio
Kitchen DR 28 ft
0
410.5 112
____
1
0
0
11Slab-On-Grade Edge Insulatio
Master Bath 19.5 ft
0
94.5 ft2
____
1
0
0
12SIab-On-Grade Edge Insulatio
Hers 4 ft
0
20 ft2
_---
1
0
0
13SIab-On-Grade Edge Insulatio
His 1 ft
0
8.9 ft2
-___
1
0
0
14SIab-On-Grade Edge Insulatio
Master Bed 31.9 ft
0
222.4 ft2
____
1
0
0
ROOF
/
Roof
Gable
Roof Red
Solar
SA Emitt
Emitt Deck
Pitch
V
# Type Materials
Area
Area
Color Barr
Absor.
Tested
Tested Insul.
(deg)
1 Hip Composition shingles 2014 ft2
0 ft2
Medium N
0.8
No 0.9
No 0
26.57
ATTIC
/
V
# Type
Ventilation Vent Ratio (1
in)
Area
RBS
IRCC
1 Full attic
Vented
300
1801 ft2
N
N
CEILING
# Ceiling Type
Space
R-Value
Ins Type
Area
Framing Frac
Truss Type
1 Under Attic (Vented)
Laundry
30
Blown
39 ft2
0.1
Wood
2 Under Attic (Vented)
Bed 2
30
Blown
137 ft'
0.1
Wood
3 Under Attic (Vented)
Bath
30
Blown
39ft'
0.1
Woad
4 Under Attic (Vented)
Bath 2
30
Blown
51 ft'
0.1
Wood
5 Under Attic (Vented)
Hall
30
Blown
30ft'
0.1
Wood
6 Under Attic (Vented)
Bed 3
30
Blown
153 ft'
0.1
Wood
7 Under Attic (Vented)
Bed 4
30
Blown
157 ft'
0.1
Wood
8 Under Attic(Vented)
Foyer GR
30
Blown
426 ft2
0.1
Wood
9 Under Attic (Vented)
Pantry
30
Blown
14 fl'
0.1
Wood
10 Under Attic (Vented)
Kitchen DR
30
Blown
411 ft2
0.1
Wood
11 Under Attic (Vented)
Master Bath
30
Blown
95 ft2
0.1
Wood
12 Under Attic (Vented)
Hers
30
Blown
20 ft2
0.1
Wood
13 Under Attic (Vented)
His
30
Blown
9 ft2
0.1
Wood
14 Under Attic (Vented)
Master Bed
30
Blown
220 ft2
0.1
Wood
9/13/2021 8:09 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 3 of 6
FnannI'll RAnF-2mn INPIIT SUMMARY CHECKLIST REPORT
WALLS
Adjacent
Cavity
Width
Height
Sheathing
Framing Solar
Below
n__„
Space
R-Valuw
Fr In
Fr
In
Area
R-tfalue-�bs
_ 1
SW=>S Garage
Frame - Wood
Laundry
11
5
6
8
0
44.0 ft'
0
0.25 0.8
0
2
NW=>W Exterior
Concrete Block - Ext
Insul Bed 2
4.1
10
6
8
0
84.0 ft2
0
0 0.3
0
3
SW=>S Garage
Frame - Wood
Bed 2
11
13
6
8
0
108.0 ft2
0
0.25 0.8
0
4
NW=>W Exterior
Concrete Block - Ext
Insul Bath 2
4.1
6
0
8
0
48.0 ft2
0
0 0.3
0
5
NE=>N Exterior
Concrete Block -Ext
Insul Bed 3
4.1
12
0
8
0
96.O f12
0
0 0.3
0
_ 6
NW=>W Exterior
Concrete Block - Ext
Insul Bed 3
4.1
13
6
8
0
108.0 ft2
0
0 0.3
0
7
NE=>N Exterior
Concrete Block - Ext
Insul Bed 4
4.1
13
0
8
0
104.0 ft2
0
0 0.3
0
_ 8
SE=>E Exterior
Concrete Block - Ext
Insul Bed 4
4,1
8
0
8
0
64.0 ft2
0
0 0.3
0
9
SW=>S Exterior
Concrete Block -Ext
lnsuFoyer GR
4.1
23
6
9
6
223.3 ft2
0
0 0.3
0
_10
NW=>W Garage
Frame - Wood
Foyer GR
11
11
0
9
6
104.5 ft2
0
0.25 0.8
0
11
NE=>N Exterior
Concrete Block - Ext
InsLifitchen DR
4.1
20
6
9
6
194.8 ft2
0
0 0.3
0
12
SE=>E Exterior
Concrete Block - Ext
Insdiitchen DR
4.1
7
6
9
6
71.3 ft2
0
0 0.3
0
_ 13
NE=>N Exterior
Concrete Block - Ext
InsWaster Bath
4.1
10
6
8
0
84.0 ft2
0
0 0.3
0
14
SE=>E Exterior
Concrete Block - Ext
Inshdaster Bath
4.1
9
0
8
0
72.0 ft2
0
0 0.3
0
_ 15
SE=>E Exterior
Concrete Block - Ext
Insul Hers
4.1
4
0
8
0
32.0 ft2
0
0 0.3
0
16
SE=>E Exterior
Concrete Block - Ext
InsMasler Bed
4.1
15
6
8
6
131.8 ft2
0
0 0.3
0
_ 17
SW=>S Exterior
Concrete Block - Ext
InsMaster Bed
4A
13
6
8
6
114.8 ft2
0
0 0.3
0
18
NW=>W Exterior
Concrete Block - Ext
InsdMasler Bed
4.1
3
0
8
6
25.5 ft2
0
0 0.3
0
19
NW=>W Garage
Frame - Wood
Foyer GR
11
11
0
2
0
22.0 112
0.23 0.75
0
WINDOWS
Orientation shown is the entered orientation
=> changed to
As
Built rotated 315 degrees),
/
Wall
Overhang
# Ornt ID
Frame Panes
NFRC
U-Factor
SHGC
Imp
Area
Depth
Separation
Int Shade
Screening
1 NW=>W 2
Metal Low-E Double
Yes
0.58
0.24
Y
15.5 ft2
1 It 0 in
1 ft 0 in
Drapes/blinds
Exterior 5
2 NW=>W 4
Metal Low-E Double
Yes
0,58
0.24
Y
6.3 ft2
1 ft 0 in
1 It 0In
Drapes/blinds
Exterior 5
3 NE=>N 5
Metal Low-E Double
Yes
0.58
0.24
Y
15.5 ft2
1 ft 0 in
1 It 0 in
Drapes/blinds
Exterior 5
4 NW=>W 6
Metal Low-E Double
Yes
0.58
0.24
Y
15.5 ft2
1 ft 0 in
1 ft 0 in
Drapes/blinds
Exterior 5
5 NE=>N 7
Metal Low-E Double
Yes
0.58
0,24
Y
15.5 ft2
1 It 0 in
1 ft 0 in
Drapes/blinds
Exterior 5
6 SW=>S 9
Metal Low-E Double
Yes
0.62
0.22
Y
31.0 ft2
1 ft O In
1 ft 0 in
Drapes/blinds
Exterior 5
7 SW=>S 9
Metal Low-E Double
Yes
0.58
0.24
Y
40.0 ft2
4 It 8 in
1 ft 0 in
Drapes/blinds
Exterior 5
8 NE=>N 11
Metal Low-E Double
Yes
0.58
0.24
Y
15.5 ft2
8 it 0 in
1 It 0 in
Drapes/blinds
Exterior 5
9 NE=>N 11
Metal Low-E Double
Yes
0.65
0.21
Y
40.0 ft2
8 ft 0 in
1 It 0 in
Drapes/blinds
Exterior 5
10 NE=>N 13
Metal Low-E Double
Yes
0.58
0.24
Y
4.7 ft2
1 It 0 in
1 ft 0 in
Drapes/blinds
Exterior 5
11 SW=>S 17
Metal Low-E Double
Yes
0.62
0.22
Y
15.5 ft2
1 ft 0 in
1 ft 0 in
Drapes/blinds
Exterior 5
GARAGE
# Floor Area Ceiling Area Exposed
Wall Perimeter
Avg. Wall Height
Exposed Wall Insulation
1 382.8112
382.8
ft2
64 ft
8
ft
1
9/13/2021 8:09 AM EnergyGauge®USA 7.0.00 - FlaRes2020 F8C 7ih Edition (2020) Compliant Software Page 4 of 6
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
INFILTRATION
# Scope
Method
SLA
CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse
Proposed ACH(50)
.000278
1314.5 72.12 135.39 .0936 5
HEATING SYSTEM
#
System Type
Subtype
Speed Efficiency Capacity
Block
Ducts
1
Electric Strip Heat/
None
COPA 27.04 kBlu/hr
1
sys#1
COOLING SYSTEM
#
System Type
Subtype
Subtype Efficiency Capacity Air Flow SHR
Block
Ducts
1
Central Unit/
Split
Singl SEER: 15 40 kBtu/hr 1200 cfm 0.85
1
sys#1
HOT WATER SYSTEM
#
System Type SubType
Location
EF Cap Use SeWnt Conservation
1
Electric None
Garage
0.96 50 gal 62.3 gal 120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Carl # Company Name
Collector Storage
System Model If Collector Model # Area Volume
FEF
None None
ft'
DUCTS
#
---- Supply ----
Location R-Value Area
---- Return ---- Air CFM 25 CFM25
Location Area Leakage Type Handler TOT OUT QN
RLF
HVAC #
Heat Cool
1
Attic 6 718 ft'
Attic
718 ft' Default Leakage Garage (Default) (Default)
1 1
TEMPERATURES
Programable[ ]ThermostaJan[[t:]]Y [[ ]]
Heating 4X] Jan [X] Feb [X] Mar
Venting 1 Jan [[ 11 Feb [IXII Mar
ANov
CApreiling Fans:Coolin[[ ]] j j [[[ ]]]
Jun ll 11 Jul ] Aug [ ]1 Sep
pr [ I May ri Jun [X] Jul EX] Aug lXl Sep Oct
((X�j
[X] Nov
Dec
Dec
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edifion (2020) Compliant Software Page 5 of 6
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
Thermostat Schedule: HERS 2006
Reference
Hours
Schedule Type
1
2
3
4
5
6
7
8
9
10
11
12
Cooling (WD)
AM
78
78
78
78
78
78
78
78
80
80
80
80
PM
80
80
78
78
78
78
78
78
78
78
78
78
Cooling (WEH)
AM
78
78
78
78
78
78
78
78
78
78
78
78
PM
78
78
78
78
78
78
78
78
78
78
78
78
Heating (WD)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
Heating (WEH)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
MASS
Mass Type
Area
Thickness
Furniture Fraction
Space
Default(8
lbs/sq.ft.
0 ft2
0 ft
0.3
Laundry
Default(8
lbs/sq.ft.
ft2
ft
0.3
Bed 2
Default(8
lbs/sq.ft.
ft2
ft
0.3
Bath
Default(8
Ibs/sq.ft.
ft2
it
0.3
Bath 2
Default(8
lbs/sq.ft.
ft2
it
0,3
Hall
Default(8
Ibs/sq.ft.
ft2
ft
0.3
Bed 3
Default(8
Ibs/sq.ft.
ft2
it
0.3
Bed 4
Default(8
lbs/sq.ft.
ft2
ft
0.3
Foyer GR
Default(8
lbs/sq.ft.
ft2
ft
0.3
Pantry
Default(8
Ibs/sq.ft.
ft2
ft
0.3
Kitchen DR
Default(8
Ibs/sq.ft.
ft2
ft
0.3
Master Bath
Default(8
lbs/sq.ft.
ft2
it
0.3
Hers
Default(8
lbs/sq.ft.
ft2
it
0.3
His
Default 8
Ibs/s .ft.
ft2
it
0.3
Master Bed
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 6 of 6
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 99
The lower the EnergyPerformance Index, the more efficient the home.
7702 Hibiscus Rd, Ft. Pierce, FL, 34951
i. New construction or existing New (From Plans) 10. Wall Type and Insulation Insulation Area
2. Single family or multiple family Detached a. Concrete Block - Ext Insul, Exterior R=4.1 1453.30 ft'
b. Frame - Wood, Adjacent R=11.0 278.50 ft'
3. Number of units, If multiple family 1 c. N/A R= ft'
4. Number of Bedrooms 4 d. N/A R= ft'
5. Is this a worst case? No 11, Ceiling Type and insulation level Insulation Area
a, Under Attic (Vented) R=30.0 1801.00 ft'
6. Conditioned floor area (ft') 1801 b. N/A R= ft'
7. Windows** Description Area c. N/A R= ft'
a. U-Factor: Dbl, U=0.58 128.44 ft' 12. Ducts, location & insulation level R ftz
a. Sup: Attic, Ret: Attic, AH: Garage 6 718
SHGC: SHGC=0.24
b. U-Factor: Dbl, U=0.62 46.50 ft'
SHGC: SHGC=0.22 13. Cooling systems kBtu/hr Efficiency
c. U-Factor: Dbl, U=0.65 40.00 ft' a. Central Unit 40.0 SEER:15.00
SHGC: SHGC=0.21
d. U-Factor: N/A ft° 14. Heating systems kBtu/hr Efficiency
SHGC: a. Electric Strip Heat 27.0 COP:1.00
Area Weighted Average Overhang Depth: 3.490 ft.
Area Weighted Average SHGC: 0.230
8. Skylights Description Area 15. Hot water systems Cap: 50 gallons
ft a. U-Factor(AVG): N/A ' a. Electric EF: 0.96
SHGC(AVG): N/A
b. Conservation features
9. Floor Types Insulation Area None
a. Slab -On -Grade Edge Insulation R=0.0 1801.00 ft' Credits (Performance method) Patel
b. N/A R= ft'
c. N/A R= ft'
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. erwi e, a new L D' play Card will be completed
based on installed Code complia �atur.
Builder Signature: Date:
Address of New Home: p City/FL Zip:
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
9/13/2021 8:09 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
Florida Building Code, Energy Conservation, 7th Edition (2020)
atory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS:
7702 Hibiscus
Rd
Permit
Number:
Ft. Pierce , FL
, 34951
MANDATORY REQUIREMENTS -See individual code sections for full details.
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory)The building official shall require that an energy performance level (EPL) display
card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section
❑ 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold
residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a
dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and
specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOPE
❑ R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1 Building thermal envelopeThe building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1. as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour In Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Extedor windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the Intended weatherstripping or
other infiltration control measures.
2, Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
❑ R402.4.2 Fireplaces. New wood -burning
fireplaces
shall have
tight -fitting flue dampers
or doors, and outdoor combustion air. Where using
tight -fitting doors on factory -built fireplaces
listed and
labeled in
accordance with UL 127,
the doors shall be tested and listed for the
fireplace. Where using tight -fitting doors on
masonry
fireplaces,
the doors shall be listed and labeled in accordance with UL 907.
R402.4.3 Fenestration air leakage.
Windows, skylights and sliding glass doors shall have
an air infiltration rate
of no more than 0.3 cfm
❑ per square foot (1.5
Us/m2), and swinging doors no more than 0.5 cfm per square
foot (2.6
Us/m2),
when tested
according to NFRC 400 or
AAMA/ WDMA/CSA
101/I.S.2/A440
by an accredited, independent laboratory and
listed and labeled
by the manufacturer.
Exception: Site -built windows, skylights and doors.
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 5
MANDATORY REQUIREMENTS - (Continued)
❑R40204.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open
combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a
room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table
R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully
gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1.
Direct vent appliances
with both intake and exhaust
pipes installed continuous to the outside.
2.
Fireplaces and stoves
complying with Section R402.4.2
and Section R1006 of the Florida Building Code, Residential.
❑ R402.4.5 Recessed lighting. Recessed luminaires installed In the building thermal envelope shall be sealed to limit air leakage between
conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than
2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be
sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403.1 Controls.
❑ R403.1.1 Thermostat provision (Mandatory). Al least one thermostat shall be provided for each separate heating and cooling system.
❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heal shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
❑ R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verifed by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or
(7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes, to be "substantially as free" in
accordance with Section R403.3.3.
R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of
the design airflow rate when tested in accordance with ASHRAE 193.
❑ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system,
including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise
sealed during the test.
2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire
system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct air leakage lest shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for Section
R405 compliance where credit is taken for leakage, and a duct air leakage on to the outside of less than 0.080 (where on =
duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is indicated in the
compliance report for the proposed design.
A written report of the results of the test shall be signed by the party conducting the lest and provided to the code official.
❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
❑R403.4 Mechanical system piping Insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C) or
below 55OF (13°C) shall be insulated to a minimum of R-3.
El by
Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused
by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause degradation of the
material. Adhesive tape shall not be permitted.
El installed,
Heated water circulation and temperature maintenance systems (Mandatory). If heated water circulation systems are
installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with
Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
R403.5.1.1 Circulation systems. Healed water circulation systems shall be provided with a circulation pump. The system return pipe shall be
❑ a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating
hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall
automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there Is no demand for hot water.
El automatically
Heat trace systems. Electric heal trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall
automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times
when heated water is used in the occupancy.
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heal traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 % inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting
range shall be from 100'F to 140OF (380C to 600C).
R403.5.6.1.2 Shut down.Li A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burners) of
combustion types of service water -heating systems to be turned off.
R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of Table
C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment Installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate
water -heating category. Solar water healers shall meet the criteria of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
❑ R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical ventilation
system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where an air handler that is integral to tested and listed HVAC equipment is used to provide whole -house mechanical
ventilation, the air handler shall be powered by an electronically commutated motor.
❑ R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment.
❑ R403.7.1 Equipment sizing (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on
the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies,
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor
units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in
Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that affect
equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as
standard kitchen and bathroom exhaust systems. New or replacement healing and cooling equipment shall have an efficiency rating
equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
(CFM)
MINIMUM EFFICACY a
(CFMANATT)
AIRFLOW RATE MAXIMU
(CFM)
HRV or ERV
Any
1.2 cfm/watt
Any
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
<90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm
= 28.3 Llmin.
a.
When tested in accordance with HVI Standard 916
9/13/2021 8:09 AM
EnergyGaugea0 USA
7.0.00
- FlaRes2020 FBC 7lh Edition 190201 Compliant Software
Page 3 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R403.7.1 A Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than
the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected In Section
R403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall
not be less than the calculated latent load.
The published value for AHRI total capacity Is a nominal, rating -lest value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2.
When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of
equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.19 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
R403.7.1.2.2 Electric resistance furnaces.
Electric resistance furnaces
shall
be sized within 4
kW of the
design
requirements
calculated according to the procedure selected
in Section R403.7.1.
R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
❑ R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections C403
and C404 of the Florida Building Code, Energy Conservation —Commercial Provisions in lieu of Section R403.
R403.9 Snow melt and ice system controls (Mandatory) Snow- and Ice -melting systems, supplied through energy service to the building,
shall Include automatic controls capable of shutting off the system when the pavement temperature is above 50`F (10°C), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40OF (4.8°C).
❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall
be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to healers shall be controlled by a readily accessible on -off switch that is an
El integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of
such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be Installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
9/13/2021 8:09 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 4 of 5
^ R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at
u the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for healing, computed over an operation season, Is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
R403.10A Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
❑ efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
healers fired by natural or LP gas shall not have continuously burning pilot lights.
❑R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with
AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to
verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
❑R403.11 Portable spas (Mandatory).The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
❑ R403.13 Dehumidifiers (Mandatory If installed, a dehumidifier shall conform to fhe following requirements:
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house
is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.73,
conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected Into the supply side of the cooling system, a backdraft
damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct.
2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system,
a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the
central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located In unconditioned space shall be insulated to a minimum of R-6.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment (Mandatory).
Not less than 90
percent of the lamps
in permanently installed luminaires shall have an
efficacy of at least 451umens-per-watt or shall
utilize lamps wifh an efficacy of not less
than 65tumens-per-wait.
R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
9/13/202t 8:09 AM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7fh Edition (2020) Compliant Software Page 5 of 5
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 7702 Hibiscus Rd PSL Prop Builder Name: PSL Prop
Street: 7702 Hibiscus Rd Permit Office:
City, State, Zip: Ft. Pierce , FL , 34951 Permit Number:
Y
U
Owner: Cooper Residence Jurisdiction: St. Lucie
W
x
Design Location: FL, ST_LUCIE_CO_INTL
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with the
The insulation in any dropped ceiling/soffit
Ceiling/attic
insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
Walls
The junction of the top plate and the lop of exterior walls shall be
shall be insulated by completely filling the cavity with
sealed.
a material having a thermal resistance of R-3 per
Knee walls shall be sealed.
inch minimum.
Exterior thermal envelope insulation for framed walls
shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall Include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous Insulation Installed on
the underside of floor framing and extends from the
bottom to the lop of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace wall
.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
Narrow cavities
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
is.
Recessed lighting
Recessed light fixtures Installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extendehind Opine and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs,
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be Installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire spr'nkler cover plates and walls or ceilin s.
a. In addition, inspection
of
log
walls
shall
be in accordance with
the
provisions
of IL'C-40U.
9/13/2021 8:09 AM
EnergyGauge® USA 7.0.00 - FlaRes2020 FBC
7th Edition
(2020)
Compliant Software
Page 1 of 1
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
Jurisdiction: St. Lucie
Permit #:
Job Information
Builder: PSL Prop Community: Lot: NA
Address: 7702 Hibiscus Rd
City: Ft. Pierce State: FL Zip: 34951
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
O PRESCRIPTIVE METHOD•The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g. (50 Pascals) in Climate Zones 1 and 2.
O PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on Farm R405-2020 (Performance) or R406-2020 (ERI), section labeled as Infiltration, sub -section ACH50.
ACH(50) specified on Form R405-2020-Energy Calc (Performance) or R406-2020 (ERI): El000
x 60-2.196037E24 — Method for calculating building volume:
CFM(50) Building Volume ACH(50)
0 Retrieved from architectural plans
ElPASS • Code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals).
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth In Section
489.105(3)(f), (g), or (I) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended Infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, If installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
9/13/2021 8:09:40 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1