Loading...
HomeMy WebLinkAbout21-139A - Bryn Mawr Condos 2021 - Bldg A - Rep 3 - 11.03.21M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139A Report No. 3 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 2 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. A 5061 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0405 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. A DATE: November 3, 2021 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Limited access balconies – Units 102, 201, 206, 301, 302, 401, 506, 604, 701, 705 & 901. OBSERVATIONS: • We walked the balconies with the on-site property maintenance manager and the contractor to mark out the areas for repair according to the permitted documents. • The swing stage placed and secured at the 01 stack. • Chipping of spalling concrete to start next week. RECOMMENDATIONS: • Hurricane shutters to be removed at the following units: o Unit 102 at master bedroom sliding glass door, south door jamb. o Unit 201 top track at east edge. o Unit 301 at master bedroom sliding glass door. o Unit 901 at west facing kitchen nook sliding glass door. • Unit 604 – Sliding glass door panels and top track to be removed and a temporary wall placed at the living room sliding glass door to repair ceiling spall. • All areas of repair shall be verified by the Engineer of Record prior to new concrete placement. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139A Report No. 3 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 2 Pic 1 – Unit 604 Ceiling spall SGD to be removed and temporary wall placed. Pic 2 – Unit 701 Ceiling spall. Pic 3 – Unit 901 Column spall.