Loading...
HomeMy WebLinkAbout219062-1d compaction signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #:219062-1d/MH/jam NUC #630 Nuc Model:MC-1DR-P Nuc Serial #:30630 21 Florida Way Port St. Lucie, Florida Compacted Foundation Fill DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1 S.W.0" - 12"50 111.1 113.1 98.2% 2 N.W.""110.7 "97.9% 3 Center ""112.3 "99.3% 4 S.E.""111.9 "98.9% 5 N.E.""111.7 "98.8% Proctor Optimum Moisture: Proctor Max. Dry Density: P.C.F. @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets 11/4/2021 Email to: dotty@wynnebc.com PE # 68366 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Soil Description: JOB LOCATION: PERMIT #: CONTRACTOR:Wynne Development 21090435 Julie E. Keller, P.E. President Respectfully Submitted: ITEM TESTED: 113.1 TEST LOCATION OF SAMPLE Proudly Serving Florida since 1990 Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test.KSM is not responsible if the tested area has been altered from the approved inspected condition. SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 November 3, 2021DATE TESTED: 8.9% 10.0% Brown/Gray Clayed Sand Certified Women Owned Business - WBE Minimum Requirement for Staked Foundation In Place Moisture: Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting 108.0 109.0 110.0 111.0 112.0 113.0 114.0 115.0 5 6 7 8 9 10 11 12 13 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight