Loading...
HomeMy WebLinkAboutAPPROVED WHITE roof infoST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2024) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Required Sections of Attachments Required Roof System the Permit Application See List Below j Form Low Slope Application A, B, C Prescriptive BUR-RAS 150 A, B, C 24,56,7 Asphaltic Shingles A, B, D 1,2,4,5,6,7 Concrete or Clay Tile A, B, D, E 1�2,5,4,5,6,7 Metal Roofs A, B p 12,3,4,5,F7 IA4,5,6,7 Wood Shingles and A, 8, ❑ Shakes Other As Applicable 1,2A4,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE VORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': _ Zone 1: Zone 2: _Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows_ ® _oo Zone 1:—." oc @ Lap, # Rows _ ® _" ao Zone 2:_" oc @ Lap, If Rows _ ®_' on Zone 3:_" oc @ Lap, If Rows_ ®_" oa Number of Fasteners Per Insulation Board: Zone 1':_Zone 1—Zone 2:_Zone 3:— Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing orsubmit Manufacturers Detailsthat Comply with RAS 111 and Chapter 16., ST. LUCIE WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: dA TAYLOR ROOFING EDGE-LOC 1" STANDING SEAM Notice of Acceptance Number: NOA:18-1023.17 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:-57 Zone 2e:-51—Zone 2n.--91 one2r:-91 7one3e:-91 7one3r:-128 Deck TyM: PLYWOOD Type Underlayment ELF ADHERED UNDERtAYMENT TO POLYGLSS Mrs FLM2591 Roof Slope 4 12 Insulation: Fire Barrier: RitlgeUeMilation? Fastener Type & Spacing; 8"FIELD /4" PERIMETER, BD RINGS NK NAILS Adhesive Type: Type Cap Sheet—_� Mean Rod Height: 15 FT Roof Coveting: METAL Type&Size Drip z^x 21Y2" =Ana• ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. If the Mr values are greater than or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RA512T (Zone 1: _x)r_= _)- Mg: _=fdn- Product ApprovalM (Zone 2e: _x)..= _ )-Mg:_=M._ Product ApprovalM (Zone 2n: x3L= I-Mg:_=M®_ Product ApprovalM (Zone 2r. _x 1_= _)- Mg: _=Mqr_ Product Approval Mr (Zone 3e: -xl_= __I-Mg:_=Film _ Product Approval Mr (Zone 3r: _x )L_=-_)-Mgi_=Me- Product Approval Mr Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below- Product Approval Mf_ M, required Moment Resistance - Mean Roof Height Roof Slope 15, 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 -Must be used in conjunction with a list of moment based the systems For Uplift based tile systems use Method 3. Compare the values for P with the values for Fr If the F'values are greater than or equal to the F, values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: _xL xW:=___j-W: Cos r=Fn Product Approval F' (Zone 2e:x L=xW:=__)-W cos r=Fa. Product Approval F' (Zone 2n: _x L= x W:=__, -W: Cos r =Fan_ Product Approval F' (Zone 2r: x L= x W:=_J -W: cos r Fa, Product Approval F' (Zone 3e: _x L=xW:=�-W: C05 r=Fri. Product Approval F (Zone 3r: _x L =1r W:=-W: Cos r= F,3, Product Approval P Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, Ze, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope B Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Ma Product Approval Attachment Resistance Mr Product Approval Required Moment Resistance Mc Calculated Minimum Attachment Resistance P Prod=Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.