HomeMy WebLinkAbout3103 Kingsley Contract 3921 S.US Hwy 1 Licensed & Insured
Fort Pierce, FL 34982
Phone: (772) 464-6800 All AI' a ioo ng CCC1330649
and n rucUon,m
Fax: (772)464-6600 . E www.AIIAReaRoofingFTP.com
PROPOSAL SUBMITTED T0: PHONE: DATE:
GRAPE LEAF PARK LLC 954-554-8525 110/16/21
STREET: OTHER:
PO BOX 8 NABILKISKHK@AOL.COM
CITY,STATE AND ZIP CODE: JOB LOCATION:
FT PIERCE FL 34946 3103 KINGSLEY DR. FTP 34946
SALES PERSON: DATE OF PLANS: JOB NAME: i JOB NUMBER
KENDALL GOGARTY
SCOPE OF WORK FOR RE-ROOF: VSTORld 1 PITCH 4:12
#LAYERS 1 MANSARD
Provide permit from local building dept if required HIP GABLE XXX
` Remove existing (1)one layer roof down to decking (add1 layers extra)
`Replace rotten decking at$900 per sheet (7)sheets included
`Any additional wood replacement will be billed at time and material`Re-nail wood deck using 2 1/2"8d R/S fasteners 6"o.c. and 4"o.c. at perimeter 1 WD
"Install self-adhered underlayment over entire roof deck ' ,A A
` Install 3"x 3"roof edge (WHITE) (/'� (�,L
`Install new plumbing boots, galvalume roof vents and valley metal if needed yO (]
' Install 130mph Architectural/Dimensional Shingles using 1 1/4"IRS Nails at 6 nails per shingle: (Standard Color
`Install 30(lf)Ridge ventilation
`Remove all roof related debris from project site
'Provide a Manufacturer Material Warranty and a (3)three year workmanship warranty
Disclaimer Unpredictable and Other Billable Conditions Include But Not Limited To:
1. Fascia that is covered by aluminum or vinyl, sub fascia, and rotten beams where replacement is required
2. Soffit work that is integral to fascia
3. Structural gutters that must be removed to facilitate replacement of drip edge, rotten fascia or sub fascia
4. Roof decking not sufficient to code
5. Any work not included in Proposal/Contract will require a change order to be paid at that time
6. Additional work due to unpredictable and unforeseen conditions will be invoiced as follows:
Material plus 25%and Labor at$75 per man hour for carpentry work
7. Not responsible for reinstalling satellite dish
8. Credit Card Convenience Fee 3.5%charge
We propose hereby to furnish material and/or labor-- complete in accordance with above specifications, for the sum of:
NINE THOUSAND SIX HUNDRED dollars $ 9,600.00
Payment to be made as follows: 40% DEPOSIT AND BALANCE DUE UPON COMPLETION
All material is guaranteed to be as specified.All work to be completed in a workmanlike Authorized
manner according to standard practices.Any alteration or deviation from above specifi- Signature KENDALL GOGARTY
cation involving extra costs will be executed only upon written orders,and will become
an extra charge over and above the estimate.All agreements contingent upon strikes,
accidents or delays beyond our control.Owner to carry fire,tornado and other necessary Note:This proposal may be
insurance.Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us If not accepted within 15 days.
Acceptance of Proposal —The above prices,specification
and conditions are satisfactory and are hereby accepted.You are fly G--
authorized to do the work as specified. Payment will be made as Signature
outlined above.
Date of Acceptance Signature