Loading...
HomeMy WebLinkAbout4912 Wartesong Way Pile LogsB3 MATERIAL TESTING ENGINEERING 31ll E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 October 26, 2021. Bodax Foundations, Inc. 1101 NW 55th Street Ft Lauderdale, FL 33309 Re.: Auger Cast Pile monitoring for Private Residence S.F.H. 4912 Waterson Way Fort Pierce, 34949. Dear Sir, Project No. 21-0538 Pursuant to your request, BIII MATERIAL TESTING ENGINEERING, LLC. conducted Auger Cast Pile monitoring for the above -referenced location on October 25th, 2021. The work involved the installation of twenty-three (23) 16" diameter cast in place piles installed. The approximate grout volume used was 899.85 c.f. (33.33) yards) and load capacity of 35 tons as per Alterra Engineering report. Attached are the monitoring logs, as well as the sketch showing the location of piles, enclosed with this letter. We appreciate the opportunity to have been of service to your company. Please feel free to contact us if there are any question and or concerns pertaining to this letter. 'yyY9YtlYilO./Y07 Respectfully su Dario A. e ; oz `t 1 i Florida Reg. #f7796.'a°i �`; BIII Material Te'sjiri °F.-gineerira P aAAAAAA Page114 B3 MATERIAL TESTING ENGINEERING 3111 E s s e n c e o -f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786,773-5871/5889 - Fax. 786.615-5801 nr- ) fr"I i 0 �*- AUGE"'Er", CA,ze"iT IL" L Jv 61--) - - Car U If --1 M, %, a - il Page 214 E33 MATERIAL TESTING ENGINEERING f r' ri 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES 133 PROJECT NO. 21-0538 DATE 25-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 10:00 AM TIME JOB FINISHED 2:45 PM PROJECT ADDRESS Kabler Residence (House) 4912 Waterson Way Fortpierce, 34949 AUGERCAST PII FS I nc, 1 Columns No. 1 2 3 4 5 6 7 8 9 10 2 Pile No. 2 1 5 13 18 17 12 11 10 15 3 Augered 0 (inches) 16 16 16 16 16 16 16 16 16 16 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 37 35 37 42 39 39 31 42 35 32 7 Volume per Pump Strokes (co 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 38.9 36.8 38.9 44.1 41.0 41.0 32.6 44.1 36.8 33.6 9 Volume Ratio (co, (815) 1.7 1.6 1.7 1.9 1.7 1.7 1.4 1.9 1.6 1.4 10 1 TOReinforci Reinforcing Size n g Size 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 8004 8004 8004 8004 8004 8004 8001 1. 8001 8001 1 8001 rump calibration date: Pump calibration strokes: 1.05 Id. per strokes) * House; 23 piles in total ; 5#6 with #4 ties @ 16" o.c. For 15 ft cage, and 1#6 full. Her Y'P, Field Rep. Fy MM �J r D rio As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of t conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reprodu Material Testing Engineering, LLC. David Correal specttully Submitted, «3 W i r r r "r% , .E,<f r #t�7796'tif',t on at�rafgnpublication of statements, �1:- X ill„vyi Riot the prior written approval for 83 Diu B3 MATERIAL TESTING ENGINEERING t- c n C '.. C> f f" - r f c c t. i c) r-, 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.61S.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0538 DATE 25-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street: Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 10:00 AM TIME JOB FINISHED 2:45 PM PROJECT ADDRESS Kabler Residence (House) 4912 Waterson Way Fortpierce, 34949 AUGERCAST PILFS I nr, 1 Columns No, 11 12 13 14 15 16 11 18 1 19 20 2 Pile No. 14 16 3 19 21 20 23 22 9 7 3 Augered 0 (inches) 16 16 16 16 16 16 16 16 16 16 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 32 32 26 37 37 42 35 41 35 41 7 Volume per Pump Strokes (co 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1,05 1.05 8 Actual Grout Volume (cf), (6*7) 33.6 33.6 27.3 38.9 38.9 44.1 36.8 43.1 36.8 43.1 9 Volume Ratio (cf), (815) 1.4 1.4 1.2 1.7 1.7 1.9 1.6 1.8 1.6 1.8 10 Reinforcing Size 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 5#6 1#6 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 8001 8001 8001 8004 8004 8004 8004 8004 8004 8001 Nump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) * House; 23 piles in total ; 5#6 with #4 ties @ 16" o.c. For 15 ft cage, and 1#6 full Field Rep As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential pror conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be Material Testing Engineering, L-C. Respectfully Submitted; 0 ��t David Correal Fla. eg`:�#��=��(a zpents,.any,dUtnonzptron for publication of statements, ii�jUtl�withobt the prior written approval for B3 �'�,II dl A�1M1n65 B3 MATERIAL TESTING ENGINEERING r= r� c . c� I P c• r 1 e c t i c� n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES 63 PROJECT NO. 21-0538 DATE 25-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 10:00 AM TIME 10B FINISHED 2:45 PM PROJECT ADDRESS Kabler Residence (House) 4912 Waterson Way Fortpierce, 34949 AUGERCAST PILES LOG 1 Columns No. 21 22 23 2 Pile No. 6 4 8 3 Augered 0 (inches) 16 16 16 4 Pile Length (feet) 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23,5 6 Number of pump strokes 43 45 42 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 45.2 47.3 44.1 9 Volume Ratio (co, (815) 1.9 2.0 1.9 10 Reinforcing Size 516 1#6 5#6 146 5#6 146 11 Reinforcing Length (ft) 22 22 22 12 Grout Truck Number 8001 8001 8001 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) * House; 23 piles in total ; 5#6 with #4 ties @ 16" o.c. For 15 ft cage, and 1#6 full. Gd��Vkfl4GDcri spectfully Su Field Rep.: David Correal As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential prop conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be Material Testing Engineering, LLC. �: =_ (11311Uyt rlba' HbrreFcq'l 4E. Fla. Reg.,#t'6,� 96 gh ""PR3"�hYi" tln(Viastlpr for publication of statements, �R�//�t� i 'cd}�(C►$Qeptrriull..eLithout the prior written approval for B3 B3 MATERIAL TESTING ENGINEERING E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 StT'r S;�', UArI Page 314 wou to'lnlamuosaa�ew : 45) (VA% ayt uo sn IMA - - — - LZZ8-£Z WL) WK -WuoniS 'and opaJOIOD ZIb "]d `H:)2[q[d • Jq NOISEIQ "Id2IfI I Of12I LS rHfLLOS,LIHD-gV - ONOSNZLVM 9S#,LOl 'D `SSZVIDOm v NosxoD 'v-w ���I�QTS�2i 2I�Z�Vx