HomeMy WebLinkAbouttermite (2)Planning & Development Services
T Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: alC_7 fg l JOB ADDRESS: 6 1
BUILDER/CONTRACTOR:. Ldro * Cyr n _
PEST CONTROL CONTRACTOR: Procontrol Management Services Inc
PEST CONTROL LICENSE #:JB267390
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: 4�^
Percentage of solution: P
Date of Treatment: I 11 C l r I
Footing
i" Treatment
Re -Treat
Driveway
1't Treatment
�Re-Treat
Other
Chemicals used; In,,� n�
Total gallons used: +0
Time of Treatment:
Slab
Is'Treatment
Re -Treat
Pools
1't Treatment
Re -Treat
J Perimeter for Final Inspection
1'� Treatment
Re -Treat ' i �_ //a4
Signature of Exterminator Date
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the r'nspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A wea ther resistantjobske posting board
shall be pmvided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
CerhAtcate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a veriftable record of
protecive treatment If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014