Loading...
HomeMy WebLinkAbout3 Concrete Placement - North Building (11-3-21)607 NW Commodity Cove, Port St. Lucie, Florida 34986 H 1 U N I V t R b A L Phone: (772) 924-3575 ENGINEERING SCIENCES GFA PROJECT# 3310.2100348.0000 PROJECT Cristelle Cay Condos 4804 N. At LOCATION Fort Pierce, FL 34949 PERMIT NO. North Building - 19OM214 OWNER Cardinal Ocean Development LLC WEATHER CONTRACTOR Cardinal Ocean Development, LLC TEMPERATURE ARCHITECT Frank C Snedaker WIND ENGINEER Stirling & Wilbur Engineering HUMIDITY CONCRETE PLACEMENT INSPECTION REPORT DATE Wednesday November 3, 2021 S M T W TH F S DAY x BRIGHT SUN CLEAR OVERCAST RAIN x BELOW 60 60-75 7590 ABOVE 90 x LOW MODERATE HIGH Report No x LOW MODERATE HIGH 3 x MEMBERS/AREA INSPECTED: C.I.P. North Bldg. 9 Units Pile Caps & Grade Beams. Concrete Pour. THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND ACCEPTED PRACTICES. COMPLIES YES NO N/A x 1 SPARE VIBRATOR ON HAND x 2 FORMS WETTED/OILED x 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW) x 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW) x 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAYS POUR x 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME x 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET x 8 SUFFICIENT VIBRATION PERFORMED x 9 STEEL REMAINED IN PLACE DURING POUR x 10 P/T CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS Disposition of Inspection BSection / Area Observed Re -Inspection Work In Progress BRe-Inspection Required COMMENTS/ACTION REQUIRED: Geo-Tech Report Required If Inspection Performed By: Inspection Certified By: Registered Professional Ni Certified Special Inspector No:^SI 1103 -Y FBPE Certificate Environmental a GeMechnicai a Constriction Matariala Testing a Special & Threi Inspections a Plan Review &Copp Cpmpireits O Florida's Leading Engineering Scorce • j,t�S, ° 7F, iJ/61�A� i'llmiigt9,0