HomeMy WebLinkAbout3 Concrete Placement - North Building (11-3-21)607 NW Commodity Cove, Port St. Lucie, Florida 34986 H 1 U N I V t R b A L Phone: (772) 924-3575
ENGINEERING SCIENCES
GFA PROJECT#
3310.2100348.0000
PROJECT
Cristelle Cay Condos
4804 N. At
LOCATION
Fort Pierce, FL 34949
PERMIT NO.
North Building - 19OM214
OWNER
Cardinal Ocean Development LLC
WEATHER
CONTRACTOR
Cardinal Ocean Development, LLC
TEMPERATURE
ARCHITECT
Frank C Snedaker
WIND
ENGINEER
Stirling & Wilbur Engineering
HUMIDITY
CONCRETE PLACEMENT
INSPECTION REPORT
DATE Wednesday November 3, 2021
S M T W TH F S
DAY x
BRIGHT SUN
CLEAR
OVERCAST
RAIN
x
BELOW 60
60-75
7590
ABOVE 90
x
LOW
MODERATE
HIGH
Report No
x
LOW
MODERATE
HIGH
3
x
MEMBERS/AREA INSPECTED: C.I.P. North Bldg. 9 Units Pile Caps & Grade Beams. Concrete Pour.
THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED
CONTRACT DOCUMENTS AND ACCEPTED PRACTICES.
COMPLIES
YES NO N/A
x 1 SPARE VIBRATOR ON HAND
x 2 FORMS WETTED/OILED
x 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW)
x 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW)
x 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAYS POUR
x 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME
x 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET
x 8 SUFFICIENT VIBRATION PERFORMED
x 9 STEEL REMAINED IN PLACE DURING POUR
x 10 P/T CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS
Disposition of Inspection
BSection / Area Observed Re -Inspection
Work In Progress BRe-Inspection Required
COMMENTS/ACTION REQUIRED: Geo-Tech Report Required
If
Inspection Performed By:
Inspection Certified By:
Registered Professional Ni
Certified Special Inspector No:^SI 1103 -Y
FBPE Certificate
Environmental a GeMechnicai a Constriction Matariala Testing a Special & Threi Inspections a Plan Review &Copp Cpmpireits O
Florida's Leading Engineering Scorce • j,t�S, °
7F, iJ/61�A�