HomeMy WebLinkAboutSigned Energy CodesFORM R405-2017
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the
2017 Florida
Building
Code,
Energy Conservation via the residential
Simulated Performance method shall
include:
❑ This Checklist
❑ A FORM 405 repo t that documents that the Proposed Design complies with Section R405.3 of the Flor da
Energy Code. This form shall include a summary page indicating home address, a -ratio and the pass or fail
status along with summary areas and types of components, whether the home was simulated as a worst -case
orientation, name and version of the compliance software tool, name of individual completing the compliance
report (one page).
❑ An input summary checklist that can be used for field verification (usually 4 pages/may be greater).
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO for the Performance method:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table 402.4.1.1 -one page)
❑ A completed Form 2017 Envelope Leakage Test Report (usually one page). Section R402.4 or R402.4.1.2
exceptions may apply.
❑ If FORM R405 duct leakage type indicates anything other than "default leakage" then a completed FORM R405
Duct Leakage Test Report (usually one page).
,J,
2021-Nov-17
13:37:72
-!\ri^Wn h�`Qf�
�
Rlg hl-Suite®Unit/ ersa1202121 .0.00 RSU27054
Rig hl-Energy®Floflda 2017
Sec11on 405.4.i Complianl5ollware
pages
^Y�r ���
...oft HVAC\5313 S 25th St Thomas Ras PSL Prop.rup
Calc = MJO Front Door faces: N
FORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: Thomas Residence Builder Name: PSL Prop
Street: 5313 S 25th St Permit Office:
City, State, Zip: Fort Pierce, FL 34981 Permit Number:
Owner: Thomas Residence Jurisdiction: St Lucie
Design Location: FL, St Lucie Co Intl County: St Lucie (Florida Climate Zone 2)
1. New construction or existing New (From Plans) 9. Wall types (1851 ft') Insulation (R) Area (ft')
2. Single family or multiple family Single -Family a. Blk Wall, Stucco Ext, R-4.1 Ext 4A 1611.21
b. Frm Wall, 1/2" Gyp.Bd Ext, R-11 11.0 239.95
3. Number of units, if multiple family 1 c. N/A
4. Number of bedrooms 3 d. N/A
10. Ceiling types (1766 W) Insulation (R) Area (ft2)
5. Is this a worst case? Yes a. Attic, Shngl Roof, R-30 Cell Ins 30.0 1765.75
6. Conditioned floor area above grade (ft2) 1765.75 b. NIA
Conditioned floor area below grade (H2) 0 c. N/A
7. Windows 336 ft?) Description Area ft' 11. Ducts
3up: House AXic, Rel: House Attic, AH: Uncontl Garage R Area (ft2)
( ) P ( ) a. 6.0 450.25
a. U-Factor: Slit Impact, 0.580 217.97 b.
SHGC: 0.24
b. U-Factor: Slit Impact, 0.650 117.81 12. Cooling systems kBtu/hr Efficiency
SHGC: 0.21 a.Split air conditioner 42.0 SEER: 16.0
C. U-Factor: b.
SHGC: 13. Healing systems kBtu/hr Efficiency
d.U-Factor: a.Electric strip 27.6 AFUE: 100.0
SHGC: b'
Area Weighted Average Overhang Depth: 6.339 ft 14. Hot water systems
Area Weighted Average SHGC: 0.229 a.Electric conventional (40 gal) Cap: 40 gal
EF: 0.96
8. Floor types (1765.76 ft2) Insulation (R) Area (ft2) b.Conservation features
a. On Grade Depth, Tile Flr Fnsh 0.0 1765,75 (None)
b. N/A
c. NIA 1 15. Credits None
Glass/Floor area: 0.190 Total Proposed Modified Loads: 56.37 PASS
Total Baseline Loads: 57.47
I hereby certify that the plans and specifications covered by Review of the plans and specifications
this calculation are in compliance with the Florida Energy covered by this calculation indicates
Code. � / compliance with the Florida Energy
'/ / ��_ �' _ Code. Before construction is completed,
PREPARED BY:y� Nz¢� this building will be inspected for
DATE: 11 /11/2021'40compliance with Section 553.908
Florida Statutes.
I hereby certify that this building, as de ' ne In
compliance with the Florida ode ��
BUILDING OFFICIAL:
DATE:
Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50 (R402.4.1.2).
2021-Nov-1113:37:12
w
Wn htLaO�
4
Rlghl-Suile®Unlversal 2021 21.0.08 RSU27054
Right -Energy® Flodda 2077
Section 405.4.1 Compliant Software
page 2
rw•� .yawn,.
...orI HVAC15313525Ih St Thomas Res PSL Prop.Np
CaIc=MJB Front Door races: N
FORM R405-2017
Building Input Summary Report
PROJECT
Title:
Thomas Residence
Bedrooms: 3
Address type:
Street
address
Building Type: FLAsBuilt
Owner:Thomas Residence
Bathrooms: 2
Conditioned Area: 1766
Lot#:
Block/Subdivision:
# of Units: 1
Total Stories: 1
Worst Case: Yes
Platbook:
Street:
5313 S 25th St
Builder Name: PSL Prop
Permit Office:
Rotate
Anpis. 0
County:
St Lucie
FL
34981
Jurisdiction:
St Lucie
Cross
Ventilation: No
City, State, Zip:
Fort Pierce,
Family Type: Single -Family
Whole
House Fan: No
New/
New (From
Plans)
Terrain:
3 can/Lake
Year
Construct:
g
Comment:
CLIMATE
IECC Design Temp
Int Design Temp
Heating
Design
Daily Temp
✓
Design Location
TMY Site
Zone 97.5 % 2.5
%
Winter Summer Degree Days
Moisture
Range
FL, St Lucie Co Intl
FL -Fort -Pierce
2 41 90
70 75
486
57
Low
BLOCKS
dP
Name
Area
Volume
- ---
1
House
1765.75 ft2
16274.03 fP
SPACES
#_
Area
Volume
Kitchen Occupants
Bedrooms InfI ID Finished
Cooled
Heated
i
Bed 2
161.25 ft2
1306.13 fP
No 0
1 1
1
Yes
Yes
Yes
Yes
Yes
Yes
2
Bath 2
54.00 ft2
437.40 fP
No 0
0
0 1
Yes
Yes
Yes
3
Lin
Hall
6.25 ft2
29.75 ft2
50,63 its
240.98 fP
No 0
No 0
0 1
Yes
Yes
Yes
4
5
Bed 3
172.50 fP
1397.25 fP
No 0
1 1
1
Yes
Yes
Yes
Yes
Yes
Yes
6
7
Family Room
Kitchen/Nook
185.00 ft21868.50
214.50 ft2
fP
2166.45 fP
No 1
Yes 2
0
0 1
Yes
Yes
Yes
8
Living Room
265.60 ft2
2681.55 fP
No 1
0 1
0 1
Yes
Yes
Yes
Yes
Yes
Yes
9
10
Laundry
Dining Room
77.00 IF
108.00 fP
623.70 ft'
1090.80 fP
No 0
No 0
0 1
Yes
Yes
Yes
11
Foyer
72.00 fie
727.20 fP
No 0
0 1
0 1
Yes
Yes
Yes
Yes
Yes
Yes
12
Wtr Clst
28.00 ft2
226,80 fP
No 0
0
0 1
Yes
Yes
Yes
13
14
Linen
WIC
5,25 ft2
41.50 ft2
42.53 fP
336.15 fP
No
No 0
0 1
Yes
Yes
Yes
15
Master Bath
128.75 iP
1042.88 fP
No 0
0 1
1 1
Yes
Yes
Yes
Yes
Yes
Yes
16
Master Bedroom
216.50 IF
2035.10 fP
No 0
FLOORS
(Total Exposed Area = 1766
sq.ft.)
# Floor Type
Space Perimeter
R-Value Area
U-Factor
Tile Wood Carpet
1 On Grade Depth, Tile
Fir Fnsh
Bed 2 29
ft
0 161.25 ft'
fP
0.989
0.989
1.0
1.0
0
0
0
0
2 On Grade Depth, Tile
Fir Fnsh
Bath 2 6
It
0 54.00
0 6.25 ft2
0.989
1.0
0
0
3 On Grade Depfh, Tile
Fir Fnsh
Lin 0
Hall 0
ft
ft
0 29.75 ft2
0.989
1.0
0
0
4 On Grade Depth, Tile
Flr Fnsh
Bed 3 28
ft
0 172.50 ft2
0.989
1.0
0
0
5 On Grade Depth, Tile
6 On Grade Depth, Tile
Fir Fnsh
Fir Fnsh
Family Room 25
ft
0 185.00 ft2
0.989
1.0
0
0
7 On Grade Depth, Tile
Fir Fnsh
Kitchen/Nook 11
it
0 214.50 IF
0.989
1.0
0
0
0
0
8 On Grade Depth, Tile
Fir Fnsh
Living Room 8
ft
0 265.50 fP
ft2
0.989
0.989
1.0
1.0
0
0
9 On Grade Depth, Tile
Fir Fnsh
Laundry 14
ft
0 77.00
108.00 ft2
0.989
1.0
0
0
10 On Grade Depth, Tile
Fir Fnsh
Dining Room 13
8
ft
ft
0
0 72.00 ft'
0.989
1.0
0
0
11 On Grade Depth, Tile
Fir Fnsh
Foyer
Wir Clst 12
ft
0 28.00 ft'
0.989
1.0
0
0
12 On Grade Depth, Tile
Fir Fnsh
2
it
0 5.25 fP
0.989
1.0
0
0
13 On Grade Depth, Tile
Fir Fnsh
Linen
WIC 7
it
0 41.50 ft2
0.989
1.0
0
0
14 On Grade Depth, Tile
Fir Fnsh
Fir
33
ft
0 216.50 ft2
0 989
1.0
0
0
16 On Grade Depth, Tile
Fnsh
Master Bedrroom
ROOF
Roof Gable
Roof Solar SA
Emitt
Emilt
Deck Pitch
# Type
Materials
Area Area
Color Absor. Tested
Tested
Insul. (deg)
1 Hip
RoofAsph
1974ft2
fP
Medium 0.75 No
Medium 0.75 No
0.90
0.90
No
No
0 27
0 27
2 Hip
RoofAsph
471
2021-Nov-11 13:37:12
-liil- wirighisoft" RiOht-Suited Unlversa12021 21.0.08 RSU27054 RiOht-Energy® Florida 2017 Section 405.4.1 Compiianl Software pa0e 3
��r.�,y ...oH HVAC\5313 S 25ih SI Thomas Res PSL Prop.rvp Calc = MJ8 Front Door faces: N
FORM R405-2017
ATTIC
✓ #
Type
Ventilation
Vent Ratio
(1 in)
Area
RBS
IRCC
1
Full attic
Vented
150
150
1765.75 ft' N
421.00 ft' N
N
N
2
Full attic
Vented
CEILING
(Total Exposed Area
= 1766 sq.ft.)
✓ #
Ceiling Type
Space
R-Value
U-Factor
Area
Framing Fraction Truss Type
1
Attic, Shngl Roof
R-30 Cell Ins, 1/
Bed 2
30
0.034
0.034
161.25
54,00
IF
fF
0.10
0.10
Wood
Wood
2
Attic, Shngl Roof,,
R-30 Cell Ins, 1/
Bath 2
30
0.034
6.25
fl=
0.10
Wood
3
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Lin
30
30
0.034
fF
0.10
Wood
4
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Hall
30
0.034
.
172.50
IF
0.10
Wood
5
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Bed 3
30
0.034
185.00
fF
0.10
Wood
6
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Family Room
Kitchen/Nook
30
0.034
214.50
fF
0.10
Wood
7
8
Attic, Shngl Roof,
Attic, Shngl Roof,
R-30 Cell Ins, 1/
R-30 Cell Ins, 1/
Living Room
30
0.034
265.50
fP
0.10
Wood
Wood
9
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Laundry
30
0.034
0,034
77,00
108.00
IF
fi=
0.10
0.10
Wood
10
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Dining Room
30
0.034
72.00
fl'
0.10
Wood
11
12
Attic, Shngl Roof
Attic, Shngl Roof;
R-30 Cell Ins, 1/
R-30 Cell Ins, 1/
Foyer
Wtr Clst
30
30
0.034
28.00
IF
0.10
Wood
Wood
13
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Linen
30
0,034
0.034
5.25
41.50
fl'
fF
0.10
0.10
Wood
14
Attic, Shngl Roof,
R-30 Cell Ins, 1/
WIC
30
30
0.034
128.75
fP
0.10
Wood
15
Attic, Shngl Roof,
R-30 Cell Ins, 1/
Master Bath
0.034
216.50
fF
0.10
Wood
16
Attic, Shngl Roof,
R-30 Cell Ins, 1/Master Bedroom
30
WALLS
(Total Exposed Area =1851 sq.ft.)
Adjacent
Cavity Width
Height
Sheathing
U- Frm.
Solar Below
#
Ornt
Wall Type
Space R-Value
Ft
In
Ft
In
Area
R-Value
Factor Frac.
Absor. Grade%
To
1
NE Exterior
Bilk Wall, Stucco
Bed 2
0 14
0
8
1
113.4
fF
4
0
0.109 0.22
0,101 0.25
0,60 0
0.60 0
2
Partition
Frm Wall, 1/2" Gy
Bed 2
11 15
0
8
8
1
1
121.5
48.6
fF
fF
4
0.109 0.22
0.60 0
3
NE Exterior
Blk Wall, Stucco
Bath 2
0 6
15
0
0
8
1
121.5
fF
4
0.109 0.22
0.60 0
4
NE Exterior
Elk Wall, Stucco
Bed 3
Bed 3
0
0 12
6
8
1
101.3
fF
4
0.109 0.22
0.60 0
5
NW Exterior
Bilk Wall, Stucco
10
0
10
1
101.0
fF
4
0.109 0.22
0.60 0
6
SW Exterior
Blk Wall, Stucco
Family Room
0
14
12
10
1
151.5
fP
4
0.109 0.22
0.60 0
7
NW Exterior
Blk Wall, Stucco
Family Room
0
1
60.6
fF
4
0.109 0.22
0.60 0
8
SW Exterior
Bilk Wall, Stucco
Kitchen/Nook
0 6
0
10
1
45.5
fi'
4
0.109 6.22
0.60 0
9
NW Exterior
Blk Wall, Stucco
Kitchen/Nook
0 4
6
6
10
10
1
75.8
fF
4
0.109 0.22
6.60 0
10
NW Exterior
Blk Wall, Stucco
Living Room
0 7
8
1
113.4
fF
0
0.101 0.25
0.60 0
11
Partition
Frm Wall, 1/2" Gy
Laundry
11 14
0
0
10
1
121.2
fi'
4
0.109 0.22
0.60 0
12
BE Exterior
Bilk Wall Stucco
Dining Room
0 12
10
1
5.1
fi'
0
0.101 0.25
0,60 0
13
Partition
Frm Walt, 1/2" Gy
Dining Room
11 0
6
1
80.8
fF
4
0.109 0.22
0.60 0
14
SE Exterior
BIk Wall, Stucco
Foyer
0 7
3
12
6
10
8
1
28.4
IF
4
0.109 0.22
0.60 0
15
SE Exterior
Bilk Wall, Stucco
Wir Clst
0
8
0
8
1
64.8
fF
4
0.109 0.22
0.60 0
16
SW Exterior
Bilk Wall, Stucco
Wir Clst
0
1
6
8
1
12.2
fF
4
0.109 0.22
0,60 0
17
SW Exterior
Blk Wall, Stucco
Linen
0
0
8
1
56.7
fF
4
0,109 0.22
0.60 0
18
SW Exterior
Blk Wall, Stucco
WIC
0 7
4
6
8
1
36.5
fF
4
0.109 0.22
0.60 0
ANE
Exterior
Bilk Wall, Stucco
Master Bath
0
9
6
8
1
77.0
fF
4
0.109 0.22
0.60 0
20
SE Exterior
Blk Wall, Stucco
Master Bath
0
9
5
79.8
fl'
4
0.109 0.22
0.60 0
21
N Exterior
Blk Wall, Stucco
Master Bedroom
0 8
6
165.8
P
4
09 22
Exterior
Stucco
Master
0 17
0
9
5
ft'
4
0.109 022
0.60 0
23
NW
Blk Wall,
Bedroom
DOORS
(Total
Exposed Area = 40 sq.ft.)
Width
Height
✓ #
Ornt
Door Type
Space
Storms
U-Value
Ft In
Ft In
Area
1
SE
Fbrgls Door
Foyer
None
0.127
6 0
6 8
40.2 fF
WINDOWS
(Total Exposed Area = 336 sq.ft.)
Overhang
Interior
✓ #
Wall
Ornt ID Frame
Panes
NFRC
U-Factor SHGC
Impact Area
Depth
Separation
Shade Screening
1
NE 1 Metal Single Clear
Yes
0.580
0.24
Yes
15.6fF
1 ft 0 in
1 ft 0 in
1 ft 0 in
Blinds 450 outdoor
None None
2
NE 3 Metal Single Clear
Yes
0.580
0.24
0.24
Yes
Yes
4,02
15.6fi'
1 ft 0 in
1 ft 0 in
3 f10 in
Blinds 450 outdoor
3
NW 5 Metal Single Clear
Yes
0.580
0.650
0.21
Yes
39.6fF
1 ft 0 in
3It 0 in
Blinds 450 outdoor
4
SW 6 Metal Single Clear
Yes
Yes
0.580
0.24
Yes
31.2ft2
1 ft 0 in
3 ft 0 in
Blinds 450 outdoor
5
NW 7 Metal Single Clear
8 Metal Single Clear
Yes
0.580
0.24
Yes
15.6fF
20 ft 0 in 3 ft 0 in
Blinds 45° outdoor
6
7
SW
NW 9 Metal Single Clear
Yes
0,580
0.24
Yes
15.6fF
10 ft 0 In 3 ft 0 in
3 ff 0 in
Blinds 45° outdoor
Blinds 45° outdoor
8
NW 10 Metal Single Clear
Yes
0.650
0.21
Yes
Yes
39.6f1'
40.Sft
16 it 0 in
1 ft 0 in
1 ft 0 in
Blinds 45° outdoor
9
BE 12 Metal Single Clear
Yes
Yes
0.580
0.580
0,24
0.24
Yes
9.6fF
6 ft 7 in
1 fi 0 in
None None
10
BE 14 Metal Single Clear
Metal Singe( tote)
Yes
0.580
0.24
Yes
6.OfF
1 ft 0 in
1 ft 0 in
None None
11
12
SW 16
BE 20 Metal Single (Clear)
Yes
0.580
0.24
Yes
9.OfF
2
1 ft 0 in
1 ft 0 in
in
Blinds 450 outdoor
Blinds 45° outdoor
13
N 21 Metal Single Clear
Yes
0.650
0.21
Yes
Yes
38.5f
31.2fi2
14 ft 0 in
1 ft 0 in
3 ft 0
1 ft0 in
Blinds 45° outdoor
14
SW 22 Metal Single Clear
Yes
Yes
0.580
0,580
0.24
0.24
Yes
23.OW
10 ft 0 in
3 ft 0 in
Blinds 45° outdoor
15
NW 23 Metal
Single Clear
#i- YV1'�g�itb`Oft' Right-Sulle®Unlversa12021 21.0.06 RSU27054 Right -Energy® Florida 2017 Section 405.4.1 Compliant Sopviare� ���� � � upage 4
--- rrr r�°r �y�r� ...ofl HVACt5313 S 251h Sl Thomas Res PSL Prop.iup Celc= MJB Front Door faces: N
GARAGE
✓ #
Floor Area Ceiling Area Exposed Wall Perimeter
Avg. Wall
Height
Exposed Wall Insulation
1
421 fie
421 fP 60 ft
81t
5
INFILTRATION
#
o et tl
LA C 50 A
H 50
7
Wholehouse Simplified
0.000411 1899 104.4
196.1
0.53
7.00
HEATING SYSTEM
✓ #
System Type
Subtype Effcienc
Capacity
Block Ducts
1
Electric slri3
AFUE: 100.0
27.6
kBlu/hr
1 s
s#1
COOLING SYSTEM
✓
System Type
Subtype Efficiency
Capacity Air
Flow
SHR
Block Ducts
#
SEER: 16.0
42.0 kBtu/hr
1400 chin
0.70
1 s
s#1
1
S lit air conditioner
HOT WATER SYSTEM
✓ #
system !Yee Subtype Location EF Ca
Use
SelPnt
Conservation
_
7
Electric conventional
0.11 40 al
60 al
1 ?0 OF
None
DUCTS
- Supply ---------
--------- Return--------- Air
Area Leakage Type Handler
CFM 25 Percent
Out Leakage ON
HVAC#
RLF Heat Cool
✓ #
Location R-Value Area
Location
1
House Attic 6.0 450 fP
House Attic 227 fta Default Leakage Uneond canage
(Default)
6.00
1
1
TEMPERATURES
Programmable Thermostat: Y
Ceiling Fans:
X ]Jan [ X] Feb [ X] Mar
[ X] Apr [ X] May [ X] Jun [ X] Jul [
X] Aug
[ X] Sep
[ X]
Oct [
X] Nov [ X]
X]
Dec
Dec
Cooling
[
X] Feb [ X) Mar
[ X] Apr [ X] May [ X] Jun [ X] Jul [
X] Aug
[ X] Sep
[ X)
Oct [
X] Nov [
X
Dec
Heating
[ X )Jan [
Mar
X Apr [ X May [ X Jun X Jul
X AugX
Se
X
Oct
X Nov
Venting[
X Jan [ X Feb [ X
[
Thermostat Schedule: Florida Building Cade, Dun Edition Hours
8
9
10
11
12
Schedule Type 20 1
2 3 4 5 6
7
Cooling
IWO) AM 75
75 75 75 75 75
75
75
75
75
75
75
75
75
75
75
75
75
PM 75
75 76 75 75 75
Cooling
(WEH) AM 75
75 75 75 75 75
75
75
75
75
75
75
75
75
75
75
75
75
PM 75
75 75 75 75 75
Heating
(WD) AM 72
72 72 72 72 72
72
72
72
72
72
72
72
72
72
72
72
72
PM 72
72 72 72 72 72
Heating
(WEH) AM 72
72 72 72 72 72
72
72
72
72
72
72
72
72
72
72
72
72
PM 72
72 72 72 72 72
�ngh�0}� Right-Suile®Unlversa1202121 .0.08 RSU27054 Right-Energy®Flodda2017 Section 405.4.1 Compliant SOMiare����page5
�,ry,q ...oft HVAC\5373 S 251h Sl Thames Res PSL Prop.mp Calc= MJB Front Door faces: N
FORM R405-2017
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX = 98
The lower the EnergyPerformance Index, the more efficient the home.
1. New home or addition 1. New (From Plans) 12. Ducts, location & insulation level
a. Supply ducts: R 6.0
2. Single-family or multiple -family 2. Single -Family b. Return ducts: R 6.0
c. AHU location: Uncond Garage
3.
Number of units, ifmultiple-family
3.
1
4.
Number of bedrooms
4.
3
5.
Is this a worst case? (yes/no)
5.
Yes
6.
Conditioned floor area (ft�
6.
1765.75
7.
Windows, type and area*
a. U-Factor:
SgT�mpact(Avg)
0.605
b. Solar Heat Gain Coefficient (SHGC):
7b.
0.23
c. Area (fl
7c.
336
6. Skylights
a. U-Factor:
b. Solar Heat Gain Coefficient (SHGC):
9. Floor type, insulation level
a. Slab -on -grade (R-value):
b. Wood, raised (R-value):
c. Concrete, raised (R-value)
10 Wall type and insulation:
a. Exterior:
1. Wood frame (Insulation R-value):
2. Masonry (Insulation R-value):
b. Adjacent:
1. Wood frame (Insulation R-value):
2. Masonry (Insulation R-value):
11. Ceiling type and insulation level
a. Under attic (R-value):
b. Single assembly (R-value):
c. Knee walls/skylight walls (R-value)
d. Radiant barrier installed
13. Cooling systems Capacity 42.0
a. Split system: SEER 16.00
b. Single package: SEER
c. Ground/water source: SEER/COP
d. Room unit/PTAC: EER
e. Other:
14. Heating systems Capacity 27.6
a. Split system heat pump: HSPF
b. Single package heat pump: HSPF
c. Electric resistance: COP 100.00
d. Gas furnace, natural gas: AFUE
e. Gas furnace, LPG: AFUE
f. Other:
15. Water heating systems
a.
Electric resistance:
EF 0.960
9a.
0.0
b.
Gas fired, natrual gas:
EF
9b.
c.
Gas fired, LPG:
EF
9c.
d.
Solar system with tank:
EF
e.
Dedicated heat pump with tank:
EF
f.
Heat recovery unit: HeatRec%
g.
Other:
10al.
10a2.
4
16. HVAC
credits claimed (Performance
Method)
a.
Ceiling fans:
10b1.
11
b.
Cross ventilation:
U.
c.
Whole house fan:
d.
Multizone cooling credit:
e.
Multizone heating credit:
11a.
30.0
f.
Programmable thermostat:
Yes
11 b.
11 c.
11 d.
*Label required by Section 303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features
which will be installed (or exceeded) in this hom before fi I inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant 7e�
Builder Signature:Date: /Wy� ZJ
Address of New Home:. 5313 s 25th St
City/FL Zip: Fart Pierce, FL 34981
�j • 2021-Nov-11 13:37:12
J WI'IgfltS�ft" Right-Suile®UOiv ersa1202121.0.08 RSU27054 Right-Energy®Flodda 2017 Sec11on 405.4.1 Compliant Sollware page6
r ��r.ry ...ofl HVAQ5313 S 251h Sl Thomas Res PSL Pfop.rup Calc = MJB Front Door faces: N
FORM R405-2017
Florida Building Code, Energy Conservation, 6th Edition (2017)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 5313 S 25th St PERMIT #:
Fort Pierce FL 34981
MANDATORY REQUIREMENTS -See individual code sections for full details.
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory). The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
(Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the plans
and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD.
R402.4 Air leakage (Mandatory). The
building
thermal envelope
shall be constructed to limit air leakage in accordance with
the requirements of
Sections R402.4.1
through R402.4.5.
Exception:
Dwelling units of R-2
Occupancies and
multiple
attached single
family dwellings shall
he permitted to
comply with
Section C402.5.
R402.4.1
Building thermal
envelope.
The building thermal envelope shall comply with Sections
R402.4.1.1 and R402.4.1.2.
The sealing
methods
between dissimilar
materials
shall allow for differential expansion and contraction.
R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
w ith the manufacturer's instructions and the criteria listed in Table 402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per our in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3lhrough 8. Testing shall be conducted in
accordance with ANSI/RESET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or
an approved third party. A written report of the results of the lest shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing
is not required for additions, alterations, renovations, or repairs,
of the building
thermal envelope of existing
buildings
in which the
new construction is less than 85 percent of the building thermal
envelope.
During testing:
1. Ezterior windows and doors, (replace and stove doors shall be closed, but not sealed, beyond the intended
weatherstripping or other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraff and flue dampers shall be closed, but not sealed beyond
intended infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
R402.4.2 Fireplaces.
New wood -burning fireplaces
shall have light-ftting flue dampers or doors, and
outdoor combustion
air. Where
using tight -fitting doors
on factory -built fireplaces listed
and labeledin accordance with UL 127, the doors
shall be tested and
listed for the
fireplace. Where using
tight -fagging doors on masonry
fireplaces,lhe doors shall he listed and labeled in
accordance with UL
907.
R402.4.3 Fenestration
air leakage.
Windows, skylights and sliding glass doors shall
have an air infltration
rate of no more than 0.3 cfm per
square foot (1.5 Us/m2),
and swinging
doors no more than 0.5 cfm per square
foot (2.6
Us/m2), when tested
according to NFRC 400 or
AAMAIWDMA/CSA 10
/I.S.2/A440 by
an accredited, independent laboratory
and listed
and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
2021-Nov-17
73:37:12
iitF wrightsofY
Ri ht-Suile®UniV ersa12021 21 .0.08 RSU27054
9
RI ht-Ener ®Flodtla 2017
g gy
Section 405.4.1 Compliant Sofhvare
page?
�yrxi �.tr„may.
...oil HVAC\5373525Ih 51 Thomas Res PSL Prop.iup
CaIc=MJB Front Doorfaces: N
FORM R405-2017
MANDATORY REQUIREMENTS - (Continued)
ElR402.4.4 Rooms containing fuel -burning appliances In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent apliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
R402.4.6 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403A Controls
R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate healing and cooling system.
R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
R403.3.2 Sealing (Mandatory). All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7),
Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
❑11403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design air flow rate when tested in accordance with ASHRAE 193.
R403.3.3 Duct testing. Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 Inch w.g. (25 Pa) across the system, including the
manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test.
2. Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the
entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test.
Exceptions:
1. Ad uct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
R403.3.5 Building Cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C)
or below 55"F 03°C) shall be insulated to a rrinlmum of R-3.
R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
ElR403.5A Heated water circulation and temperature maintenance systems (Mandatory). Heated water circulation systems shall be in
accordance with Section R403.5.1 A. Heat trace termperature maintenance systems shall be in accordance with Section R403.5.1.2.
Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
❑R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe
shall be dedicated return pipe or a cold water supply pipe. Gravity and lhermosiphon circulation systems shall be prohibited.
Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for how water within the
occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and
when there is no demand for hot water.
R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or Ul 515. Controls for such systems
shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance
with the times when heated water is used in the occupancy.
-,�rJ,�Ifr•-� 2021-Nov-11 13:3]:11
-r �r1gF1t'SOtt" Right-Suite®Universa1202121.0.0a RSU27054 Right -En efgy®Florida 2017 Secgon 405.4.1 Compliant Sofhvare pege8
_ r � W��.�.q ...oft HVAC\5313 S 251h Sl Thomas Res PSL Prop.mp Calc= MJa Front Door faces: N
FORM R405-2017
MANDATORY REQUIREMENTS - (Continued)
R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat
traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 1/2 inches (89 mm) in the hot water distribution line and cold water line located as close as
possible to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1 Storage water heater temperature controls.
ElR403.5.6.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be f rom 100°F to 140°F (38°C to 600C).
R403.5.6.1.2 shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied
to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s)
of combustion types of service water heating systems to be turned off.
R403.5.6.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment
installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the
appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water heating system. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TMA, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida
Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including:
Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the
ventilation system is not operating.
R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where mechanical ventilation fans
are integral to tested and
listed HVAC equipment,
they shall
be powered
by
an electronically commutated motor.
R403.6.2 Ventilation
air.
Residential buildings
designed to
be operated
ai a positive
Indoor pressure of for mechanical
ventilation shall meet
the
following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawispaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which au is drawn shall be
insulated to a minimum of R-11 and the ceiling shhall be insulated to a minimum or R-191 space permitting, or RAO otherwise.
R403.7 Heating and cooling equipment (Mandatory).
R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the
equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, healing and cooling calculation
based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and
indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions
described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that
affect equipment sizing. System sizing calculations shall not include loads created by local Intermittent mechanical ventilation such
as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency
rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
CFM
MINIMUM EFFICACY (a)
CFM/WATT
AIRFLOW RATE MAXIMUM
CFM
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
< 90
Bathroom, utility room
90
2.8 cfmlwatt
Any
For SI: 1 cfm - 28.3 L/min.
(a) When tested in accordance HVI Standard 916
2021-Nov-11
13:37:12
�W�flghisufr
Right-Suite®Universa1202121 .0.08 RSU27054
Right-Energy®Florida 2017
Secllon 405.4.1 Compliant Software
page9
y��d�r
...oft HVAC15313 S 25(h Sl Thomas Res PSL Prop.nrp
Caic= MJB Front Door faces: N
MANDATORY REQUIREMENTS -(Continued)
R403.7.1A Cooling equipment capacity. Cooling only equipment shall be selected so that Its total capacity is not less
in
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected
Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall betion( used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temfor the load
the design value for enterin01, g wet -bulb twater emperaturere s ndthe design value for enteblower CFM ring dry-bulb tempera urrovided e the expanded
Design values for entering wet -bulb and dry-bulb temperatures shall be forr the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is
less than the calculated total sensible load but not less than 80 percent of that load.
2. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the
capacity of equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
R403.7.1.2.1 Heat pumps Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 limes greater than the design cooling load even if
the design heating load is 1.15 limes greater than the design cooling load.
R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1
R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or healing within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
C403 and C404 of the IE-CC—Commercial Provisions in lieu of Section R403.
❑R403.9 Snow melt and ice system controls (Mandatory). Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system hen the pavement temperature is above 50"F (100C), and no
precipitation is falling and an automatic or manual control that ill allow shutoff when the outdoor temperature is above 40OF (4.80C).
R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 min) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired healers shall not be equipped with continuously burning ignition pilots.
turn off and
to a
reset
shall be installed for403,10,2 Time th heaters and pumtches, Time p cmotors. Heaters hes or other and pump ol dmotors that have builts that can -in time switches nshallobelincompliance with this
e
section.
Exceptions:
1. Where public health standards require 24-hour pump operations.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
ElR403.10.3 Covers. Outdoor healed swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant cover on or at
the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
ool and
heaters shall have a minimum thermal
efficiency of 82 pet ent folredr heaters and manufactured ed on or afta heaters. er April 16, 2013, as- and oil-firedwhen tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
-Ir1�F Wr19t11750ft' Right-Suile®Universal 2021 21 .0.08 Rsu2705a Right -Energy® Flodda 2017 Section 405.4.1 Compllenl SofNiare��� page 10
-r ��ra,� ��� ...ofI HVAC153135251h S1 Thomas Res PSL Prop.Np CaIc=MJe Front Ooor faces: N
MANDATORY REQUIREMENTS - (Continued)
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be
high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps.
Exception: Low -voltage lighting.
❑ R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
-,��J,�ttr..� - zazt-rvov-n r srrz
-liF Wrl�i1t50ft' Rig M-Suile®Unlversa1202121.0.0a RSU27054 Right-Energy®Flodda 2017 Sec\ion 405.4.7 Compliant Software page It
- r ryy.� �,rr�,q ...oft HVAC\5373 S 25th Sl Thomas Res PSL Prop.nip Calc= MJB Front Door faces: N
FORM R405-2017
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Thomas Residence Builder Name PSL Prop
Permit Office:
Street: 5313 S 251h St
City, Stale, Zip: Fort Pierce, FL 34981 Permit Number:
Jurisdiction: St Lucie
Owner: Thomas Residence
Design Location: FL, St Lucie Co Intl
r
COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA Y
General
A continuous air barrier shall be installed in the
thermal
Air -permeable insulation shall not be used as a
❑
building envelope. The exterior envelope
sealing material.
requirements
4
contains a continuous barrier. Breaks or joints in the
air barrier shall be sealed.
Ceilinglattic
The air barrier in any dropped calling/soffit
The insulation in any dropped ceiling/soffit
shall be aligned with the insulation and any
shall be aligned with the air barrier.
❑
gaps In the air barrier shall be sealed.
Access openings, drop down stairs or knee wall doors
to unconditioned attics paces shall be sealed.
Walls
The junction of the foundation and sill plate
Cavities with corners and headers of frame walls
shall be insulated by completely filling the cavity
shall be sealed.The junction of the top plate
with a material having a thermal resistance of R3
and the top of exterior walls shall be sealed,
❑
Knee walls shall be sealed.
per Inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed In substantial contact and
continuous alignment with the air barrier
Windows,
pp
framing shall beasealebs d, framing,
❑
doorsskylights
and skyl ghts and
Rim joists are insulated and include an air
Rim joists shall be insulated.
❑
ists
barrier.
(including
The air barrier shall be Installed at any exposed
Floor framing cavity Insulation shall be Installed
maintain permanent contact with the underside
-garage and
r
edge of insulation.to
of subfloor decking, or floor framing cavity
vered floors)
insulation shall be permitted to be in contact
❑
with the top sideof sheathing, or continuous
Insulation installed on the underside of floor
framing and extends from the bottom to the top of
all perimeter floor framing members.
Crawl space
Exposed earth In unvented crawl spaces shall be
Where provided In lieu of floor insulation,
be attached
❑
walls
covered with a Class I vapor retarder with
insulation shall permanently
to the crawlspace walls.
overlapping joints taped,
Shafts, penetrations
Duct shafts, and flue shaft
El
exteriororunconons
openings ditioned ndit oned space shall
be sealed.
Batts in narrow cavities shall be cut to fit, or
Narrow cavities
narrow cavities shall be filled by insulation that
❑
on installation readily conforms to the available
cavity spaces.
Garage
Air sealing shall be provided between the garage
❑
separation
and conditioned spaces.
Recessed
Recessed light fixtures installed in the building
Recessed light fixtures Installed in the
di envelope shall be airtight
❑
lighting
thermal envelope shall be sealed to the drywall.
andgathermal
Batt insulation shall be cut neatly to fit around
Plumbingand
wiring and plumbing in exterior walls, or
❑
wiring
insulation that on installation readily conforms
to available space shall extend behind piping
and wiring.
Shower/tub on
The air barrier shall be installed behind
Exterior walls adjacent to showers and tubs
El
wall
electrical or communication boxes or air -sealed
shall be insulated.
boxes shall be installed.
Electrical'phone
The air barrier shall be installed behind
Elbox
on exterior
electrical or communication boxes or air -sealed
walls
boxes shall be installed.
HVAC register
HVAC register boots that penetrate building
❑
boots
thermal envelope shall be sealed to the subfloor
or drywall.
Concealed
When required to be sealed, concealed fire
sprinklers
sprinklers shall only be sealed in a manner that
❑
is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be
used to fill voids between fire sprinkler cover
plates and walls or ceilings.
a. In addition, Inspection of log walls shall be in accordance with the provisions of ICC-400.
IflghRight-SuileW Universal 202121.0.08 RSU27054 Right-Energy®Flanda 2017 Secgon405.4.7 Compliant SofNiare�����page l2
�i��
...an HVAC75313 S 251h St Thomas Res PSL Prop.rup Calc = MJa Front Door faces: N
FORM R405-2017
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: St Lucie
Job Information
Permit Number:
Builder: PSL Prop
Community: Lot:
Address: 5313 S 25th St Unit:
City: Fort Pierce State: FL Zip: 34981
Air Leakage Test Results
Passing results must meet either the Performance, Prescriptive, or ERI Method.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
❑
PRESCRIPTIVE METHOD 7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) In Climate Zones 1 and 2.
The building or dwelling unit shall be tested and verified as having an air leakage rate of not
❑
PERFORMANCE or ERI METHOD exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or
R406-2017 (ERI), section labeled as Infiltration, sub -section ACH50.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): 7,000
x60 + 16274 = Method for calculating building volume:
61FM(50) Building Volume ACH(50) ❑ Retrieved from architectural plans
❑ PASS 0 Code software calculated
❑ Field measured and calculated
When ACH(50) is less than 3, Mechanical Ventilation installation
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure or u.2 Incn w.y.
(50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals
licensed as set forth in Section 489.105(3)(f), (g), or (i) or and approved third party. A written report of the results of the test shall be
signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all
penetrations of the building thermal envelope.
During testing:
1. other or window scontrol
n d doors, and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
s.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the lest, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned on.
6. Supply and return registers, if Installed at the time of the test, shall be fully open.
Testing Company
Company Name:
Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester:
Printed Name of Tester:
License/Certification #:
Date of Test:
Issuing Authority:
y�'r�. � .��y� 2021-Nov-1113:37:12
1 I�ryg �1�� RI ft HVAC4®313 S 25th 151 Thomas Res PSL PropSrup nCalc= MJeY®rornit Door faces: N Section 405.4.1 Compliant Software pa0e 13
FORM R405-2017
Residential Perscriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: St Lucie
Job Information
Permit Number:
Builder: PSL Prop Community: Lot:
Address: 5313 S 25th St Unit:
City: Fort Pierce State: FL Zip: 34981
Duct Leakage Test Results
System 1
cfm25
System 2
cfm25
System 3
cfm25
Sum of any
additional systems
cfm25
Totalall
systems
cfm25
1766
e�
Total of all Total Conditioned
systems Square Footage
❑ PASS ❑ FAIL
❑ Prescriptive Method cfm25 (Total)
To qualify as "substantially leak free" Qn Total must be less
than or equal to 0.04 if air handler unit is installed. If air handler
unit is not installed, Qn Total must be less than or equal to
0.03, This testing method meets the requirements in
accordance with Section R403.3.3.
Is the air handler unit installed Ej YES (<=0.04 00)
during testing? ❑ NO (<=0.0aQn)
❑ Performance /ERI Method cfm25 (Out or Total)
To qualify using this method, Qn must be not greater than the
proposed duct leakage Qn specified on Form R405-2017 or
R406-2017.
Leakage Type selected on Form on specified on Form R405-2017
R405-2017 (Energy Calc) or R406-2017 (Energy Calc) or R406-2017
Default Leakage
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set
forth.in Section 489.105(3)(f), (g) or (i), Florida Statues.
Testing Company
Company Name:
Phone:
I hereby verify that the above duct leakage test results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: _
Printed Name of Tester:
License/Certification #:
Date of Test:
Issuing Authority:
ram. 2021-Nov-11 1a:'s/:1[
"'� �flght��tf `' Right-Suite®Universal 202t 21.0.08 RSU27054 Right-Energy®Florida 2017 Section 405.4.1 Compliant Software page l4
r.u..W�mw ...atI HVAC45313525th Sl Thomas Res PSL Prop.Np CaIc=MJB Front Doer faces: N
Reference Home Characteristics
Thomas Residence Title: 5313 S 25th St Thomas Res PSL Prop
5313 S 25th St
Fort Pierce, FL 34981 FLBase2017
Above -grade Walls (Uo)
0.084
Above -grade Wall SolarAbsorptance
0.75
Above -grade Wall Infared Emitlance
0,90
Basement Walls (Uo)
n/a
Above -grade Floors (Uo)
n/a
Slab Insulation R-Value
0.0
Ceilings (Uo)
0.030
Roof Solar Absorptance
0,75
Roof Infared Emittance
0.90
Attic Vent Area (ftz)
5,89
Crawls pace Vent Area (ft)
n/a
Exposed MasonryFloorArea (ft)
437,35
Carpet & Pad R-Value
2.0
DoorArea (ft)
40.00
Door U-Factor
0,400
North Window Area (ft)
66,22
South Window Area (ft)
66.22
East Window Area (ft)
66.22
West W ndow Area (ft')
66.22
Window U-Factor
0.400
Window SHGC (Heating)
0.2169
Window SHGC (Cooling)
0.2169
ACH50
7,00
Internal Gains * (Btu/day)
72237
Water heater gallons per day
60,00
Water Heater set point temperature
120.00
Water heater efficiency rating
0.95
Labeled Heating System Rating and Efficiency
HSPF = 8.2
Labeled Cooling System Rating and Efficiency
SEER = 14.0
Air Distribution System Efficiency
0,88
Thermostat Type
Manual
Heating Thermostat Settings
72.0 (All hours)
TMY City: FL_Fort_Pierce