HomeMy WebLinkAboutNew Signed Energy CodeFORM R405-2020
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the
Residential Simulated Performance Alternative shall include:
❑ This checklist
❑ Form R405-2020 report
❑ Input summary checklist that can be used for field verification (usually fourpages/maybe greater)
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO:
❑ Air Barrier and Insulation
Inspection Component Criteria checklist
(Table
R402.4.1,1 - one page)
❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4
allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to
comply with Section C402.5
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
2020 Duct Leakage Test Report -Performance Method (usually one page)
11/11/2021 1:46:13 PM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
FORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 5116 Silver Oaks Dr PSL Prop
Street: 5116 Silver Oaks Dr.
City, State, Zip: Fort Pierce , FL , 34983
Owner: Collins Residence
Design Location: FL, ST_LUCIE_CO_INTL
1. New construction or existing New (From Plans)
2. Single family or multiple family Detached
3. Number of units, if multiple family 1
4.
Number of Bedrooms
Glass/Floor Area: 0.157
3
Yes
1854
0
Area
144.00 ft2
96.72 ft2
43.50 ft2
8.612 ft.
0.235
Area
ft2
Builder Name: PSL Prop
Permit Office:
Permit Number:
Jurisdiction: St. Lucie
County: St. Lucie (Florida Climate Zone 2 )
10. Wall Type�2077.3 sgft.)
a. Concrete Block - Ext Insul, Exterior
b. Frame - Wood, Adjacent
c. N/A
d. N/A
11. Calling Types (1855.0 sgft.)
a. Under Attic (Vented)
b. N/A
c. N/A
12. Ducts
a. Sup: Attic, Ret Attic, AH: Attic
13. Gaoling systems
a. Central Unit
14. Healing systems
a. Electric Strip Heat
15. Hot water systems
a. Electric
Insulation Area
R=0.0 1854.30 ft2 b. Conservation features
R= ft2 None
R= - ft2 16. Credits
Total Proposed Modified Loads: 62.69
Total Baseline Loads: 63.07
I hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Code.
PREPARED BY: a�
DATE: 11/ 1/202
I hereby certify that this building,
with the Florida Energy Code.
OWNER/AG
DATE:
Review of the plans and
specifications covered by this
calculation indicates compliance
with the Florida Energy Code.
Before construction is completed
this building will be inspected for
compliance with Section 553.908
Florida Statutes.
BUILDING OFFICIAL:
DATE:
R
Insulation
R=4.1
R=11.0
R=
R=
In
R=30.0
R=
=
Area
1765.30 ft2
312.00 ft2
ft2
ft2
Area
1855.00 ft2
ft2
ft2
R ft2
6 740
kBlu/hr Efficiency
34.6 SEER:16.00
kBtulhr Efficiency
29.4 COP:1.00
Cap: 50 gallons
EF: 0.960
PASS
Pstal
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 6
Builder Name: PSL Prop
Permit Office:
Permit Number:
Jurisdiction: St. Lucie
County: St. Lucie (Florida Climate Zone 2 )
10. Wall Type�2077.3 sgft.)
a. Concrete Block - Ext Insul, Exterior
b. Frame - Wood, Adjacent
c. N/A
d. N/A
11. Calling Types (1855.0 sgft.)
a. Under Attic (Vented)
b. N/A
c. N/A
12. Ducts
a. Sup: Attic, Ret Attic, AH: Attic
13. Gaoling systems
a. Central Unit
14. Healing systems
a. Electric Strip Heat
15. Hot water systems
a. Electric
Insulation Area
R=0.0 1854.30 ft2 b. Conservation features
R= ft2 None
R= - ft2 16. Credits
Total Proposed Modified Loads: 62.69
Total Baseline Loads: 63.07
I hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Code.
PREPARED BY: a�
DATE: 11/ 1/202
I hereby certify that this building,
with the Florida Energy Code.
OWNER/AG
DATE:
Review of the plans and
specifications covered by this
calculation indicates compliance
with the Florida Energy Code.
Before construction is completed
this building will be inspected for
compliance with Section 553.908
Florida Statutes.
BUILDING OFFICIAL:
DATE:
R
Insulation
R=4.1
R=11.0
R=
R=
In
R=30.0
R=
=
Area
1765.30 ft2
312.00 ft2
ft2
ft2
Area
1855.00 ft2
ft2
ft2
R ft2
6 740
kBlu/hr Efficiency
34.6 SEER:16.00
kBtulhr Efficiency
29.4 COP:1.00
Cap: 50 gallons
EF: 0.960
PASS
Pstal
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 6
PROJECT
Title:
5116 Silver Oaks Dr PSL Pro
Bedrooms:
3
Address Type:
Street Address
Building Type:
User
Conditioned Area:
1854
Lot #
Owner Name:
Collins Residence
Total Stories:
i
Block/Subdivision:
If of Units:
1
Worst Case:
Yes
PlalBook:
Builder Name:
PSL Prop
Rotate Angle:
180
Street:
5116 Silver Oaks Dr.
Permit Office:
Cross Ventilation:
No
County:
St, Lucie
Jurisdiction:
St. Lucie
Whole House Fan:
No
City, State, Zip:
Fort Pierce ,
FL 34983
Family Type:
Detached
New/Existing:
New (From Plans)
Comment:
CLIMATE
Design Temp Int Design Temp Heating Design Daily Temp I
Design Location TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range
FL, ST_LUCIE_CO_INTL FL_VERO_BEACH_MUNI 39 90 70 75 299 58 Medium
BLOCKS
Number Name Area Volume
1 Entire House 1854 18018.5
SPACES
Number Name Area Volume Kitchen Occupants Bedrooms Infll ID Finished Cooled Heated
1 Laundry 72 669.6 No 0 1 Yes Yes Yes
2 Bed 2 165 1534.5 No 0 1 1 Yes Yes Yes
3 Kitchen 219 2190 Yes 2 1 Yes Yes Yes
4 Hall 58 539.4 No 0 1 Yes Yes Yes
5 Bed 3 157 1460.1 No 0 1 1 Yes Yes Yes
6 Great Room 282 2820 No 2 1 Yes Yes Yes
7 Dining Room 150 1500 No 0 1 Yes Yes Yes
8 Foyer 85 850 No 0 1 Yes Yes Yes
9 Wtr Gist 27 251.1 No 0 1 Yes Yes Yes
10 WIC 1 29 269.7 No 0 1 Yes Yes Yes
11 WIC 2 29 269.7 No 0 1 Yes Yes Yes
12 M. Bath 145 1348.5 No 0 1 Yes Yes Yes
13 Master Bed 279 2790 No 0 1 1 Yes Yes Yes
14 Nook 94 940 No 0 1 Yes Yes Yes
15 Bath 63 585.9 No 0 1 Yes Yes Yes
FLOORS
# Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet
1 Slab -On -Grade Edge Insulatio Laundry 18 ft 0 72 ft' ____ 1 0 0
2 Slab -On -Grade Edge Insulatio Bed 2 15 ft 0 166 ft' ____ 1 0 0
3 Slab -On -Grade Edge Insulatio Kitchen 7 ft 0 218.8 ft' ____ 1 0 0
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 2 of 6
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
FLOORS
# Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet
4 Slab -On -Grade Edge Insulatio Hall 1 it 0 57.8 ft2 ____ 1 0 0
5 Slab -On -Grade Edge Insulatio Bed 3 24 ft 0 156.8 112 ____ 1 0 0
6 Slab -On -Grade Edge Insulatio Great Room 9.5 it 0 281.5 ft2 __-- 1 0 0
7 Slab -On -Grade Edge Insulatio Dining Room 28.5 ft 0 149.5 112 ---- 1 0 0
8 Slab -On -Grade Edge Insulatio Foyer 9 ft 0 85 ft2 ____ 1 0 0
9 Slab -On -Grade Edge Insulatio Wtr Clst lift 0 27.3 ft2 ____ 1 0 0
10SIab-On-Grade Edge Insulatio WIC 1 1 ft 0 29.4 ft2 1 0 0
11SIab-On-Grade Edge Insulatio WIC 2 6.5 it 0 29.4 ft2 ____ 1 0 0
12SIab-On-Grade Edge Insulatio M. Bath 22.4 it 0 145 ft2 ---- 1 0 0
13SIab-On-Grade Edge Insulatio Master Bed 34.5 ft 0 279 ft2 ____ 1 0 0
14SIab-On-Grade Edge Insulatio Nook 13.5 it 0 93.5 ft2 ____ 1 0 0
15SIab-On-Grade Edge Insulatio Bath 17 it 0 63.3 112 ---- 1 0 0
ROOF
Roof Gable Roof Red Solar SA Emitt Emitt Deck Pitch
# Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg)
1 Gable or shed Metal 2073 ft2 464 ft2 Unfinishe N 0.3 No 0.7 No 0 26.57
/ ATTIC
V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC
1 Full attic Vented 150 1854 ft2 N N
CEILING
# Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type
1 Under Attic (Vented) Laundry 30 Blown 72 ft' 0.1 Wood
2 Under Attic (Vented) Bed 2 30 Blown 166 ft' 0.1 Wood
3 Under Attic (Vented) Kitchen 30 Blown 219 fl' 0.1 Wood
4 Under Attic (Vented) Hall 30 Blown 58 ft' 0.1 Wood
5 Under Attic (Vented) Bed 3 30 Blown 157 ft' 0.1 Wood
6 Under Attic (Vented) Great Room 30 Blown 282 ft2 0.1 Wood
7 Under Attic (Vented) Dining Room 30 Blown 150 W 0.1 Wood
_ 8 Under Attic (Vented) Foyer 30 Blown 85 ft' 0.1 Wood
9 Under Attic (Vented) Wtr Clst 30 Blown 27 ft' 0.1 Wood
10 Under Attic (Vented) WIC1 30 Blown 29 ft2 0.1 Wood
11 Under Attic (Vented) WIC 2 30 Blown 29 ft' 0.1 Wood
12 Under Attic (Vented) M. Bath 30 Blown 145 ft2 0.1 Wood
13 Under Attic (Vented) Master Bed 30 Blown 279 ft' 0.1 Wood
14 Under Attic (Vented) Nook 30 Blown 94 ft2 0.1 Wood
15 Under Attic (Vented) Bath 30 Blown 63 ft2 0.1 Wood
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 6
WALLS
Adjacent Cavity Width Height Sheathing Framing Solar Below
V e Ornf To MIMI T Space R Value Ft i Fr nrPa a-uai P-Eracllor-Absor_ Grade.`G
1 E=>W Exterior Concrete Block - Ext Insul Laundry 4.1 6 0 9 4 56.0 ft2 0 0 0.3 0
_ 2 N=>S Garage Frame - Wood Laundry 11 12 0 9 4 112.0 ft2 0 0.25 0.8 0
_ 3 E=>W Exterior Concrete Block - Ext Insul Bed 2 4.1 15 0 9 4 140.0 W 0 0 0.3 0
_ 4 N=>S Garage Frame - Wood Kitchen 11 7 0 10 0 70.0 ft2 0 0.25 0.8 0
_ 5 E=>W Exterior Concrete Block - Ext Insul Bed 3 4.1 11 0 9 4 102.7 ft2 0 0 0.3 0
_ 6 S=>N Exterior Concrete Block - Ext Insul Bed 3 4.1 13 0 9 4 121.3 ft2 0 0 0.3 0
_ 7 S=>N Exterior Concrete Block - Ext InsCdreat Room 4.1 8 10 10 0 88.3 ft2 0 0 0.3 0
8 N=>S Exterior Concrete Block - Ext InEDining Room 4.1 11 6 10 0 115.0 ft2 0 0 0.3 0
_ 9 W=>E Exterior Concrete Block - Ext Indilining Room 4.1 4 0 10 0 40.0 ft2 0 0 0.3 0
10 E=>W Garage Frame - Wood Dining Room 11 13 0 10 0 130.0 ft2 0 0.25 0.8 0
_ 11 N=>S Exterior Concrete Block - Ext Insul Foyer 4.1 9 0 10 0 90.0 ft2 0 0 0.3 0
12 N=>S Exterior Concrete Block - Ext Insul Wtr Clst 4.1 4 6 9 4 42.0 ft2 0 0 0.3 0
13 W=>E Exterior Concrete Block - Ext Insul Wlr Cat 4.1 6 6 9 4 60.7 W 0 0 0.3 0
14 W=>E Exterior Concrete Block- Ext Insul WIC 2 4.1 6 6 9 4 60.7 ft2 0 0 0.3 0
_ 15 N=>S Exterior Concrete Block - Ext Insul M. Bath 4.1 9 6 9 4 88.7 ft2 0 0 0.3 0
16 E=>W Exterior Concrete Block - Ext Insul M. Bath 4.1 9 6 9 4 88.7 ft2 0 0 0.3 0
17 W=>E Exterior Concrete Block - Ext Insul M. Bath 4.1 3 6 9 4 32.7 ft2 0 0 0.3 0
_ 18 S=>N Exterior Concrete Block - Ext InsMaster Bed 4.1 14 0 10 0 140.0 ft2 0 0 0.3 0
_ 19 W=>E Exterior Concrete Block - Ext InsUaster Bed 4.1 20 6 10 0 205.0 ft2 0 0 0.3 0
20 S=>N Exterior Concrete Block - Ext Insul Nook 4.1 5 6 10 0 55.0 ft2 0 0 0.3 0
21 W=>E Exterior Concrete Block - Ext Insul Nook 4.1 8 0 10 0 80.0 ft2 0 0 0.3 0
22 S=>N Exterior Concrete Block - Ext Insul Bath 4.1 11 6 9 4 107.3 ft2 0 0 0.3 0
23 W=>E Exterior Concrete Block- Ext Insul Bath 4.1 5 6 9 4 51.3 ft2 0 0 0.3 0
WINDOWS
Orientation shown is the entered orientation (=>) changed to Worst Case.
Wall
Overhang
#
Ornl
ID
Frame
Panes
NFRC
U-Factor
SHGC
Imp
Area
Depth
Separation
Inl Shade
Screening
1
E=>W
1
Metal
Low-E
Double
Yes
0.58
0.24
Y
6.6 ft2
1 ft 0 in
1 ft 0
in
Drapes/blinds
Exterior 5
2
E=>W
3
Metal
Low-E
Double
Yes
0.58
0.24
Y
15.5 ft2
1 fl 0 in
1 ft 0
in
Drapes/blinds
Exterior 5
_
3
S=>N
6
Metal
Low-E
Double
Yes
0.58
0.24
Y
15.5 ft2
1 ft 0 in
1 ft 0
in
Drapes/blinds
Exterior 5
4
S=>N
7
Metal
Low-E
Double
Yes
0.65
0.24
Y
48.0 ft2
12 It 0 in
1 ft 0
in
Drapes blinds
Exterior 5
_
5
N=>S
8
Metal
Low-E
Double
Yes
0.49
0.16
Y
7.5 ft2
9 it 10 in
i ft 0
in
Drapes/blinds
Exterior 5
6
N=>S
8
Metal
Low-E
Double
Yes
0.62
0.22
Y
31.0 ft2
9 it 10 in
1 ft 0
in
Drapes/blinds
Exterior 5
7
N=>S
11
Metal
Low-E
Double
Yes
0.65
0.24
Y
48.0 ft2
15 ft 11 in
1 It 0
in
Drapes/blinds
Exterior 5
8
W=>E
13
Metal
Low-E
Double
Yes
0.58
0.24
Y
6.6 ft2
1 ft 0 in
1 ft 0
in
Drapes/blinds
Exterior 5
9
N=>S
15
Metal
Low-E
Double
Yes
0.62
0.22
Y
12.5 ft2
1 it 0 in
1 it 0
in
Drapes/blinds
Exterior 5
10
S=>N
18
Metal
Low-E
Double
Yes
0.65
0.24
Y
48.0 ft2
12 ft 0 in
1 it 0
In
Drapes/blinds
Exterior 5
11
W=>E
19
Metal
Low-E
Double
Yes
0.58
0.24
Y
21.5 ft2
1 ft 0 in
1 it 0
in
Drapes/blinds
Exterior 5
12
S=>N
20
Metal
Low-E
Double
Yes
0.58
0.24
Y
16.5 ft2
4 ft 0 in
1 ft 0
in
Drapes/blinds
Exterior 5
13
W=>E
21
Metal
Low-E
Double
Yes
0.58
0.24
Y
15.5 ft2
5 it 0 in
1 ft 0
In
Drapes/blinds
Exterior 5
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 4 of 6
r Kim Ir cI lnn nn AMV rNFrKI IRT REPORT
t-UKIVI K4uo-zuzu
— '— — -
GARAGE
#
Floor Area
Ceiling Area
Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation
1
382.8 ft'
382.8 8'
64 It 8 fl 1
INFILTRATION
# Scope
Method
SLA
CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse
Proposed ACH(50)
.000309
1501.5 82.38 154.66 .0975 5
HEATING SYSTEM
#
1
System Type
Electric Strip Heat/
Subtype
None
Speed Efficiency Capacity Block
COPA 29.39 kBtu/hr 1
Ducts
sys#1
COOLING SYSTEM
#
1
System Type
Central Unit/
Subtype
Split
Subtype Efficiency Capacity Air Flow SHR Block
Singl SEER: 16 34.6 kBtu/hr 1038 cfm 0.85 1
Ducts
sys#1
HOT WATER SYSTEM
#
1
System Type SubType
Electric None
Location
Garage
EF Cap Use SelPnt Conservation
0.96 50 gal 60.9 gal 120 deg None
SOLAR HOT WATER SYSTEM
FSEC
Carl # Company Name
Collector Storage
System Model # Collector Model # Area Volume
FEF
None None
ft'
DUCTS
#
---- Supply ---- ---- Return ---- Air CFM 25 CFM25
Location R-Value Area Location Area Leakage Type Handler TOT OUT ON RLF
HVAj
Heat1Attic
6 740
ft' Attic
740 ft' Default Leakage Attic (Default) (Default)
1
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7fh Edition (2020) Compliant Software Page 5 of 6
TEMPERATURES
Programablee ]Thermosta[[t:]]Y [r j Dec
Cfjeiling Fans: ov
jj ]] jj jj [[` ]]] r[Xj] (f
Heating [X] Jan [XI Feb [X] Mar Apr [ May LXl Jun [X] Jul [X] Aug lXl Sep Oct [X] Nov [ Dec
Venting [( J1 Jan ll 11 Feb [[[[X111) Mar Jun ll 11 Jul [[ 11 Aug [ 1 Sep
Thermostat Schedule: HERS 2006 Reference Hours
Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12
Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80
PM 80 80 78 78 78 78 78 78 78 78 78 78
Cooling (WEH) AM PM 78 78 78 78 78 78 78 778 8 78 78 78 78 78
8 78
Heating (WO) AM 66 66 66 66 66 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 66 66
Heating (WEH) PM 68 68 66 68 68 68 68 68 68 68 66 66
MASS
Mass Type Area Thickness Furniture Fraction Space
Default(8 Ibs/sq.ft. 0 ft' 0 It 0.3 Laundry
Default(8 Ibs/sq.ft. ft' it 0.3 Bed 2
Default(8 lbs/sq.ft. ft' It 0.3 Kitchen
Default(B lbs/sq.ft. 112 it 0.3 Hall
Default(8 Ibs/sq.ft. ft' ft 0.3 Bed 3
Default(B Ibs/sq.ft. ft' It 0.3 Great Room
Default(8 Ibs/sq.ft. ft' ft 0.3 Dining Room
Default(B lbs/sq.ft. ft' ft 0.3 Foyer
Default(8 Ibs/sq.ft. ft' ft 0.3 Wtr Gist
Default(8 lbs/sq.ft. ft' ft 0.3 WIC 1
Default(8 Ibs/sq.ft. ft' It 0.3 WIC 2
Default(8 Ibs/sq.ft. ft' ft 0.3 M. Bath
Default(8 Ibs/sq.ft. ft' It 0.3 Master Bed
Default(8 lbs/sq.ft. ft' ft 0.3 Nook
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 6 of 6
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 99
The lower the EnergyPerformance Index, the more efficient the home.
5116 Silver Oaks Dr., Fort Pierce, FL, 34983
1. New construction or existing New (From Plans) 10. Wall Type and Insulation Insulation Area
a. Concrete Block - Exl Insul, Exterior R=4A 1765.30 ft2
2. Single family or multiple family Detached b. Frame - Wood, Adjacent R=11.0 312.00 ft2
3. Number of units, if multiple family 1 c. N/A R= ft2
4. Number of Bedrooms 3
d. N/A R= ft2
11. Ceiling Type and insulation level Insulation Area
5. Is this a worst case? Yes a. Under Attic (Vented) R=30.0 1855.00 ft2
6. Conditioned Floor area (ft2) 1854 b. N/A R= ft2
c. N/A R= ft2
7. Windows" Description Area 12. Ducts, location & insulation level R ft2
a. U-Factor: Dbl, U=0.65 144.00 ft2 a. Sup: Attic, Ret Attic, AH: Attic 6 740
SHGC: SHGC=0.24
b. U-Factor: Dbl, U=0.58 96.72 112
SHGC: SHGC=0.24 13. Cooling systems kBtulhr Efficiency
c. U-Factor: Dbl, U=0.62 43.50 ft2 a. Central Unit 34.6 SEERA6.00
SHGC: SHGC=0.22
d. U-Factor: other (see details) 7.50 11:2 14. Heating systems kBtu/hr Efficiency
SHGC: other (see details) a. Electric Strip Heat 29.4 COP:1.00
Area Weighted Average Overhang Depth: 8.612 ft.
Area Weighted Average SHGC: 0.235
8. Skylights Description Area 15. Hot water systems Cap: 50 gallons
a. U-Factor(AVG): N/A ft2 a. Electric EF: 0.96
SHGC(AVG): N/A b. Conservation features
9. Floor Types .Insulation Area None
a. Slab -On -Grade Edge Insulation R=0.0 1854.30 ft2 Credits (Performance method) Pstat
b. N/A R= ft2
a N/A R= ft2
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. 9 he ise, a new L Display Card will be completed
based on installed Code complian a es.
Builder Signature: \ Date:
Address of New Ho
� (y 3111 Cityl L Zip:
'Nate: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1
Florida Building Code, Energy Conservation, 7th Edition (2020)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS:
5116 Silver
Oaks Dr.
Permit
Number:
Fort Pierce
, FL , 34983
MANDATORY REQUIREMENTS = See individual code sections for full details.
V
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory)The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
❑ (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOPE
❑ R402A Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
R402.4.1
Building thermal envelopeThe building thermal envelope shall comply with Sections R402.4.1.1 and
❑
R402.4.1.2.
The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
❑ R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 Inch w.g. (50 pascals). Testing shall be conducted by either
Individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdrafl and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heal recovery ventilators shall be closed and sealed.
5. Healing and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight -fitting doors on masonry fireplaces, the doors she,, be listed and labeled in accordance with UL 907.
❑ R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air Infiltration rate of no more than 0.3 cfm
per square fool (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or
AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer.
Exception: Site -built windows, skylights and doors.
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 5
MANDATORY REQUIREMENTS = (Continued)
R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
i. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential.
R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
SECTION R403 SYSTEMS
R403.1 Controls.
R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed In accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or
(7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (1), Florida Statutes, to be "substantially as free" in
accordance with Section R403.3.3.
R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design airflow rate when tested in accordance with ASHRAE 193.
❑ R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system,
including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise
sealed during the test.
2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire
system, including the manufacturers air handler enclosure. Registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for Section
R405 compliance where credit is taken for leakage, and a duct air leakage on to the outside of less than 0.080 (where on =
duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is indicated in the
compliance report for the proposed design.
A written report of the results of the lest shall be signed by the party conducting the test and provided to the code official.
❑ R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
❑R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105OF (41 °C)
or below 550F (13°C) shall be insulated to a minimum of R-3.
❑ R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
❑ R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). If heated water circulation systems are
installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with
Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
❑ R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall
be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for
circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The
controls shall automatically turn off the pump when the water In the circulation loop is at the desired temperature and when there is no
demand for hot water.
❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall
automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the
times when heated water is used in the occupancy.
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 2 of 5
MANDATORY REQUIREMENTS - (Continued)
Ei R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 % inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
El of
Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be from 1000F to 140OF (380C to 600C).
R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of
combustion types of service water -heating systems to be turned off.
❑ R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed.
Equipment used to provide healing functions as part of a combination system shall satisfy all stated requirements for the appropriate
water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1.
❑ R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a till angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
El ventilation
Whole -house mechanical ventilation system fan efficacy.When Installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where an air handler that Is integral to tested and listed HVAC equipment is used to provide whole -house mechanical
ventilation, the air handler shall be powered by an electronically commutated motor.
❑ R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings In ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment.
R403.7.1 Equipment sizing (Mandatory). Healing and cooling equipment shall be sized in accordance with ACCA Manual S based
❑ on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation
methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the
outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design
conditions described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other
factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical
ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have
an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is
installed. TABLE R403.6.1
WHOLE HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
For
AIRFLOW RATE MINIMUM
(CFM)
MINIMUM EFFICACY a
(CFMNJATT)
AIRFLOC M RATE MAXIMU
HRV or ERV
Any
1.2 cfm/wattMAnyy
Range hoods
In -line fan
Any
Any
2.8 cfm/watt
2.8 cfm/watt
Bathroom, utility room
10
1.4 cfm/watt
Bathroom, utility room
90
2.8 cfm/watt
SI: 1 cfm = 28.3 Llmin. a. When tested in accordance with HVI Standard 916
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 3 of 5
MANDATORY REQUIREMENTS - (Continued)
R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity Is not less
❑
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section R403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturers
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the
calculated total sensible load but not less than 80 percent of that load.
2.
When signed and sealed by aFlorida-registered engineer, in attached single- and multiple -family units, the capacity o
equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1.
LiR403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
Intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or healing system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
❑ R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
C403 and C404 of the Florida Building Code, Energy Conservation —Commercial Provisions in lieu of Section R403.
❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system when the pavement temperature is above 50`F (10°0), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40OF (4.80C).
❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
shall be in accordance with Sections R403.10.1 through R403.10.5.
❑ R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
11/11/2021 1:46 PM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7lh Edition (2020) Compliant Software Page 4 of 5
R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at
❑ the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for healing, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters Fred by natural or LP gas shall not have continuously burning pilot lights.
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
❑ with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A lest report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
❑R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
❑ R403.13 Dehumidifiers (Mandatory If installed, a dehumidifier shall conform to the following requirements:
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house
is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13,
conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft
damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct.
2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system,
a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the
central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
❑R404.1 Lighting equipment (Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an
efficacy of at least 45 lumen -per -watt or shall utilize lamps with an efficacy of not less than 65 lumens -per -watt.
R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
11/11/2021 1:46 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FeC 7lh Edition (2020) Compliant Software Page 5 of 5
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402A.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 5116 Silver Oaks Dr PSL Prop Builder Name: PSL Prop
Street: 5116 Silver Oaks Dr. Permit Office:
Y
City, Slate, Zip: Fort Pierce , FL , 34983 Permit Number:
w=
Owner: Collins Residence Jurisdiction: 5l. Lucie
Design Location: FL, ST_LUCIE_CO_INTL
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
Ceiling/attic
the insulation and any gaps in the air barrier shall be sealed
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
Walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/door jambs and framing, and
skylights and framing shall be sealed.
and doors
Rim joists
Rim joists shall include the air barrier.
Rim Joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
subfloor decking, or floor framing cavity insulation
above -garage
shall be permitted to be in contact with the top side
and cantilevered
of sheathing, or continuous insulation installed on
floors)
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
Crawl space walls
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace wall
.
Duct shafts, utility penetrations, and flue shafts opening to
Shafts, penetrations
exterior or unconditioned space shall be sealed.
Bails in narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
Narrow cavities
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be air tight and IC rated.
Batt insulation shall be cut neatly to fit around wiring
Plumbing and wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind pipiao @13d
Exterior walls adjacent to showers and tubs shall
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
on exterior wall
tubs shall separate them from the showers and tubs.
be Insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sealed in a manner that is recommended by the manufacturer.
sprinklers
Caulking or other adhesive sealants shall not be used to fill voids
beta f ICC 400
a. In addition, inspection of log walls shall be in accordance with the provisions o -
11/11/2021 1:46 PM EnergyGauge®USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of i
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Buildinq Code, Energy Conservation, 7th Edition
Jurisdiction: St. Lucie
Permit #:
Job Information
Builder: PSL Prop Community: Lot: NA
Address: 5116 Silver Oaks Dr,
City: Fort Pierce State: FL Zip: 34983
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
O PRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 Inch w.g. (50 Pascals) in Climate Zones 1 and 2.
O PERFORMANCE or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on Form R405-2020 (Performance) or R406-2020 (ERI), section labeled as infiltration, sub -section ACH50.
ACH(50) specified on Form R405-2020-Energy Cato (Performance) or R406-2020 (ERI): 5.000
x 60 =-2.780517E29 — Method for calculating building volume:
CFM(50) Building Volume ACH(50) O Retrieved from architectural plans
ElPASS • code software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if Installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: Phone:
I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above,
Signature of Tester: Date of Test:
Printed Name of Tester:
License/Certification #: Issuing Authority:
11/11/2021 1:46:54 PM EnergyCauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1