Loading...
HomeMy WebLinkAboutLot 126 code 118.pdfg3UNIVERSALC ENGINEERING SCIENCES INSPECTION RESULTS Z,t /a�, inspection Date: ((��/ 1- _ _Q Permit No. Project: (/LD1,MA.(.r& Address:. Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: / - ( a Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Structural Servi-e/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection I Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: /� Area Inspected/Code: t cp_,P� ,vim 1n Inspection Results: I(AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: "fx [J_Qai /�tA Lic.#: A/0 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com