Loading...
HomeMy WebLinkAboutJB-349367-00_API_Calcs_RevC_ENP_FL_1 Version#93.7-1 RU November 4,2021 RE: CERTIFICATION LETTER Project/Job#349367 Project Address: Oliveir Residence 7924 Saddlebrook Dr Port St.Lucie,FL 34986 Digitally signed by Jim Childs AHJ St.Lucie County J i m Childs Date:2021.11.04 17:36:44 SC Office Orlando -07'00' Design Criteria: -Applicable Codes=2020 FBC(7th Edition)/FBC-EB,ASCE 7-16,and 2018 NDS -Risk Category=II -Wind Speed=160 mph(3-s Gust-Vult),Exposure Category C,Partially/Fully Enclosed Method -Ground/Roof Snow Load=0 psf -MP1:Roof DL=14 psf,Roof LL=19 psf Note: Per IBC 1613.1; Seismic check is not required because Ss=0.049<0.4g and Seismic Design Category(SDC)=A<D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Tesla.Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system,with upgrades specified in the plans,meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally,I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Tesla,Inc. T = 5 L n Version#93.7-1 RU HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 24" 12" 52" 24" Not-Staggered 63.7% Portrait Hardware-Portrait Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 24" 12" 52" 24" Not-Staggered 63.7% Mounting Plane Roof Pitch Qualification Results (Degrees) Member Evaluation Results MP1 23° Member Impact Check OK Tesla,Inc. T = 5 L In