Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
lot 87 code 135.pdf
@UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection //Date: (�l l — f nD — a / Permit No. Project: Address: 3 Aia 3 Check one: Regular Inspection: s ,�/bJ �nV6 ❑ Reinspection Date of Initial Inspection: /% /D - 9 Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Sttuctural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 3 Dwga S Inspection Results:XAP-Approved ❑ AE-Approved with Exceptio ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: e ) �- 5 g OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com