Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 88 Code 650.pdf
ESAE ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: _ Permit No Project: Address: 3-3 3� Check one: Regular Inspection: «<❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): 9&v -6789 BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping &Test Framing Panel/Feeder Gas Piping & Test Cond.Piping &Test StWctural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: c 2 5-0 - ��a tc Inspection Results -Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: �P1 ��� Lic.#d: ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com