Loading...
HomeMy WebLinkAboutSt Lucie Works, 7z File COPY Section A (General Information) Master Permit No. REVIEWED FOR BODE COMPLIANCE ST: LUCiE COUNTY BOCG Process No. Contractors Name: 424-,Cyv� Mv/L7 License # G G G / Z 07,F 7 Job Address �� O Ct 120%�' L 1-4 ROOF CATEGORY E9 Slope ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles Z19'Asphaltic Shingles ❑ Metal Panel/Shingles Mood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. _,_/ ❑ New roof ❑ Repair ❑ Maintenance & Reroofing ❑ Recovering ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) Total (SF)Z/ Z� Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. WORKS K Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: r/ Z4-6% Ate/ Design Wind Pressures, From RAS 128 Or Calculations Zone 1': Zone 1: Zone 2: Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: (A,/ 494P 7 Gauge Thickness: 7/1 k Slope: P-L/7'7- Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows ® "oo Zone 1:—" oc @ Lap, # Rows ® "Qo Zone 2:—" oc @ Lap, # Rows ® moo Zone 3:—" oc @ Lap, # Rows ®. "oo Number of Fasteners Per Insulation Board: /V A . Zone 1': Zone 1: Zone 2: Zone 3: Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc.. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. FT. Base Insultation Size and Thickness: Parapet Base Insulation Fastener/Bonding Material: I?tb F SN'EF-F Cl 11IGy sF��-fig Height Top Insulation Layer: CA pfH E:V-r Of 0 Top Insulation Size and Thickness: FT. Top Insulation Fastener/Bonding Material: Mean Base Sheet(s) & No. of Ply(s): (°1 G/y P) #I Roof Base Sheet Fastener/Bonding Material: Height S ELF A--q /+er?,p7 Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: / 8Gep 1!5wlgr Top Ply Fastener/Bonding Material: 1 -2FT 9 Section D (Steep Slope Roof System) Roof System Manufacturer: 7J Notice of Acceptance Number: Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: Zone 2e: Zone 2n: Zone 2r: Zone 3e: Zone 3r: Deck Type: Gv� 3 Roof Slope; Type Underiayment /J�� 2 Insulation: Fire Barrier: iv A Ridge Ventilation? Fastener Type & Spacing: Adhesive Type: �v \Ty�ep Sheet: Mean Roof Height: _ �D v T f Covering: Type & Size Drip 3 x Edge: G"NY- VI*Z v dr-1