Loading...
HomeMy WebLinkAboutCreekside Lot 120 Code 128.pdfENGINEERING SCIENCES g3UNIVERSAL' INSPECTION RESULTS Zeqva o Inspection Date: — ' A / Permit No. 5-- Project: hh ¢— Address: 25ry Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: / ( _ ) 3 -2A 9 Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Phimhino Other Inspection Type: / p Area Inspected/Code: L p JJS� ply Inspection Results:AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name OFFICES THROU�HOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com