Loading...
HomeMy WebLinkAboutLot 7 page 5.pdf[BUNIVERSAL" ENGINEERING SCIENCES INSPECTION RESULTS 7 Inspection Date: — r — Permit No.j j :2 :2 Project: nn r Address: d /D, Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING L Footing Underground Underground In Slab Floor Rough -In Rough -In g &Test Masonry Wall Rough -In Stack Piping &Test Test Mpiping&Test Wall/Ceiling Ceiling Rough In Water Piping &Test &TestFraming Panel/Feeder Gas Pipin&Test &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area lnspected/Code: —, Inspection Results:)1P-Approved ❑ AE-Appr�hExcePtions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: o"yj 1. 2. 3. 4. S. 6. 7. Inspector's Name: Y� j %%//—y Lic.fl: _ �%y 71 Uy OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com