HomeMy WebLinkAboutLot 7 page 2.pdfUNIVERSAL'
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: l I ) I Permit No
Project: 01
Address:
Check one:
Regular Inspection:
11�7
3/c1-bQ 33
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floorgh-In
Rough -In
Steam Piping & Test
Masonry
h-In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
ugh -In
Water Piping & Test
CHW Piping & Test
Framing
der
:MS
Gas Piping & Test
Cond. Piping & Test
Structural
round
Storm Piping & Test
InsulationSheet
Rock
/Equipment
FixturesRoofing
rotection
Equipment
Equipment
Re -inspection
Re-intion
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: /
Inspection Results: AP -Approved ❑ AE-Approved with Excepti s
61DIP-Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: G Lic.#: /L2- 5 y
❑ DA-Disallowed
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com