Loading...
HomeMy WebLinkAboutLot 7 page 2.pdfUNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: l I ) I Permit No Project: 01 Address: Check one: Regular Inspection: 11�7 3/c1-bQ 33 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floorgh-In Rough -In Steam Piping & Test Masonry h-In Stack Piping & Test HW Piping & Test Wall/Ceiling ugh -In Water Piping & Test CHW Piping & Test Framing der :MS Gas Piping & Test Cond. Piping & Test Structural round Storm Piping & Test InsulationSheet Rock /Equipment FixturesRoofing rotection Equipment Equipment Re -inspection Re-intion Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: / Inspection Results: AP -Approved ❑ AE-Approved with Excepti s 61DIP-Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: G Lic.#: /L2- 5 y ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com