HomeMy WebLinkAboutAPPROVED TRUSSCUT(1)Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 1:
Customer: Central Florida Truss, Inc.Job Number: 21-0651
Job Description: /GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Address: TBD PINETREE DRIVE, FORT PIERCE, FL
Job Engineering Criteria:
Design Code: FBC 7th Ed. 2020 Res IntelliVIEW Version: 20.02.00A through 20.02.01A
JRef #: 1X707610001
Wind Standard: ASCE 7-16 Wind Speed (mph): 170 Design Loading (psf): 37.00
Building Type: Closed
This package contains general notes pages, 73 truss drawing(s) and 2 detail(s).
Item Drawing Number Truss Item Drawing Number Truss
1 193.21.0723.01937 T1 2 193.21.0911.47210 T2
3 193.21.0723.05859 T3 4 193.21.0723.06719 T4
5 193.21.0723.05547 T5 6 193.21.0723.05718 T6
7 193.21.0723.05079 T7 8 193.21.0723.05001 T8
9 193.21.0723.06391 T9 10 193.21.0723.05937 T10
11 193.21.0723.05750 T11 12 193.21.0723.05531 T12
13 193.21.0911.59990 T13 14 193.21.0723.05329 T14
15 193.21.0723.05015 T15 16 193.21.0723.05984 T16
17 193.21.0723.06703 T17 18 193.21.0723.05298 T18
19 193.21.0723.06126 T19 20 193.21.0723.05704 T20
21 193.21.0723.05921 T21 22 193.21.0723.06328 T22
23 193.21.0723.06390 T23 24 193.21.0723.06125 T24
25 193.21.0723.06406 T25 26 193.21.0723.05360 T26
27 193.21.0723.05018 T27 28 193.21.0723.05593 T28
29 193.21.0723.05017 T29 30 193.21.0723.05657 T29A
31 193.21.0723.05437 T30 32 193.21.0723.05954 T31
33 193.21.0723.06031 T32 34 193.21.0723.06609 T33
35 193.21.0723.05002 T34 36 193.21.0723.05546 T35
37 193.21.0723.05406 T36 38 193.21.0723.05078 T37
39 193.21.0723.06218 T38 40 193.21.0912.30177 T38TR
41 193.21.0723.05485 T39 42 193.21.0912.36510 T39TR
43 193.21.0723.06501 T40 44 193.21.0723.06360 T41
45 193.21.0723.06516 T42 46 193.21.0723.01610 T43
47 193.21.0723.06625 T44 48 193.21.0723.06563 T45
49 193.21.0723.06187 J1 50 193.21.0723.06593 J1HA
51 193.21.0723.06313 J1HB 52 193.21.0723.01627 J2
Florida Certificate of Product Approval #FL1999 Printed 7/12/2021 9:48:47 AM
07/12/2021
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 2:
Customer: Central Florida Truss, Inc.Job Number: 21-0651
Job Description: /GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Address: TBD PINETREE DRIVE, FORT PIERCE, FL
Item Drawing Number Truss Item Drawing Number Truss
53 193.21.0723.01985 J3 54 193.21.0723.01657 J3A
55 193.21.0723.01687 J4 56 193.21.0723.01922 J5
57 193.21.0723.01626 J6 58 193.21.0723.05359 J7
59 193.21.0723.05860 K1 60 193.21.0723.06532 K2
61 193.21.0723.06203 K3 62 193.21.0723.06330 K4
63 193.21.0723.05671 K5 64 193.21.0723.05579 K6
65 193.21.0723.05843 K7 66 193.21.0723.06140 C1
67 193.21.0723.05812 C1C 68 193.21.0723.01954 C2
69 193.21.0723.01671 C3 70 193.21.0723.05297 C4
71 193.21.0723.06578 C5 72 193.21.0723.06093 C5A
73 193.21.0723.01703 C6 74 A18015ENC160118
75 BRCLBSUB0119
Florida Certificate of Product Approval #FL1999 Printed 7/12/2021 9:48:47 AM
07/12/2021
COA #0 278
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases.
NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non-hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1.
Page 2 of 3
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org.
2. ICC: International Code Council; www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO
63045; www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com.
Page 3 of 3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.59
TC: From 28 plf at 2.59 to 28 plf at 9.87
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.62
BC: From 10 plf at 2.62 to 10 plf at 9.87
TC: 97 lb Conc. Load at 2.62
TC: 51 lb Conc. Load at 4.65, 6.65
TC: 63 lb Conc. Load at 8.65
BC: 63 lb Conc. Load at 2.62
BC: 42 lb Conc. Load at 4.65, 6.65
BC: 47 lb Conc. Load at 8.65
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 417 /-/-/-/265 /-
H 679 /-/-/-/404 /-
G -/-128 /-/63 /-/-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
G Brg Width = 1.5 Min Req =-
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 346 -582
C - D 223 -384
Chords Tens.Comp.
D - E 223 -384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 514 -297
Chords Tens.Comp.
J - I 525 -293
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - E 607 -343
Webs Tens.Comp.
E - H 314 -432
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.009 J 999 360
VERT(CL):0.016 J 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.167
Max BC CSI:0.168
Max Web CSI:0.137
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T1
Ply: 1
Qty:1
SEQN:176029 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T31 /
DrwNo:193.21.0723.01937
JB /WHK 07/12/2021
7'9"6
2'7"1
2'7"1
5'3"1
2'8"
7'7"10
2'4"8
9'10"8
2'2"14
2'8"13
2'8"13
5'3"1
2'6"4
7'11"2
2'8"
9'10"8
1'11"61'
4"1 1'5"1'9"128'1"A
B
C D E F
GHIJ
5
12
2X4(A1)
4X7
1.5X4
1.5X4
3X8
3X4
3X4
3X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.59
TC: From 28 plf at 2.59 to 28 plf at 9.87
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.62
BC: From 10 plf at 2.62 to 10 plf at 9.87
TC: 97 lb Conc. Load at 2.62
TC: 51 lb Conc. Load at 4.65, 6.65
TC: 63 lb Conc. Load at 8.65
BC: 63 lb Conc. Load at 2.62
BC: 42 lb Conc. Load at 4.65, 6.65
BC: 47 lb Conc. Load at 8.65
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 417 /-/-/-/265 /-
H 679 /-/-/-/404 /-
G -/-128 /-/63 /-/-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
G Brg Width = 1.5 Min Req =-
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 346 -582
C - D 223 -384
Chords Tens.Comp.
D - E 223 -384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 514 -297
Chords Tens.Comp.
J - I 525 -293
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - E 607 -343
Webs Tens.Comp.
E - H 314 -432
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.009 J 999 360
VERT(CL):0.016 J 999 240
HORZ(LL):0.002 C - -
HORZ(TL):0.004 C - -
Creep Factor: 2.0
Max TC CSI:0.167
Max BC CSI:0.168
Max Web CSI:0.137
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T1
Ply: 1
Qty:1
SEQN:176029 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T31 /
DrwNo:193.21.0723.01937
JB /WHK 07/12/2021
7'9"6
2'7"1
2'7"1
5'3"1
2'8"
7'7"10
2'4"8
9'10"8
2'2"14
2'8"13
2'8"13
5'3"1
2'6"4
7'11"2
2'8"
9'10"8
1'11"61'
4"1 1'5"1'9"128'1"A
B
C D E F
GHIJ
5
12
2X4(A1)
4X7
1.5X4
1.5X4
3X8
3X4
3X4
3X3
1.5X4
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/263 /194 /135
F 418 /-/-/213 /346 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 G 999 360
VERT(CL):0.011 G 999 240
HORZ(LL):-0.004 G - -
HORZ(TL):0.006 G - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.200
Max Web CSI:0.071
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T2
Ply: 1
Qty:1
SEQN:179619 HIPM
FROM:
Cust: R 761 JRef:1X707610001 T6
DrwNo:193.21.0911.47210
JB /WHK 07/12/2021
7'11"2
4'7"1
4'7"1
7'11"2
3'4"1
4'8"13
4'8"13
7'11"2
3'2"51'1'11"6
4"1 2'3"2'7"128'1"A
B
C D E
FG
5
12
2X4(A1)
4X7
1.5X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 353 /-/-/263 /194 /135
F 418 /-/-/213 /346 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.008 G 999 360
VERT(CL):0.011 G 999 240
HORZ(LL):-0.004 G - -
HORZ(TL):0.006 G - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.200
Max Web CSI:0.071
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T2
Ply: 1
Qty:1
SEQN:179619 HIPM
FROM:
Cust: R 761 JRef:1X707610001 T6
DrwNo:193.21.0911.47210
JB /WHK 07/12/2021
7'11"2
4'7"1
4'7"1
7'11"2
3'4"1
4'8"13
4'8"13
7'11"2
3'2"51'1'11"6
4"1 2'3"2'7"128'1"A
B
C D E
FG
5
12
2X4(A1)
4X7
1.5X4
1.5X4
6X6
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 9.87
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 9.87
BC: 1156 lb Conc. Load at 8.65
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 384 /-/-/-/246 /-
G 1019 /-/-/-/436 /-
F 557 /-/-/-/251 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.5 Min Req =1.5
F Brg Width = -Min Req =-
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.020 H 999 360
VERT(CL):0.037 H 999 240
HORZ(LL):-0.010 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.620
Max BC CSI:0.483
Max Web CSI:0.066
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T3
Ply: 1
Qty:1
SEQN:176193 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T16 /
DrwNo:193.21.0723.05859
SSB /WHK 07/12/2021
B2
7'9"6 2'1"2
6'7"1
6'7"1
7'9"6
1'2"5
9'10"8
2'1"2
6'8"13
6'8"13
7'11"2
1'2"5
9'10"8
1'11"61'
4"1 3'1"3'5"128'1"A
B
C D E
FGH
5 12
2X4(A1)
4X7
1.5X4
1.5X4
7X10
3X3
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 9.87
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 9.87
BC: 1156 lb Conc. Load at 8.65
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 384 /-/-/-/246 /-
G 1019 /-/-/-/436 /-
F 557 /-/-/-/251 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.5 Min Req =1.5
F Brg Width = -Min Req =-
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.020 H 999 360
VERT(CL):0.037 H 999 240
HORZ(LL):-0.010 H - -
HORZ(TL):0.019 H - -
Creep Factor: 2.0
Max TC CSI:0.620
Max BC CSI:0.483
Max Web CSI:0.066
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T3
Ply: 1
Qty:1
SEQN:176193 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T16 /
DrwNo:193.21.0723.05859
SSB /WHK 07/12/2021
B2
7'9"6 2'1"2
6'7"1
6'7"1
7'9"6
1'2"5
9'10"8
2'1"2
6'8"13
6'8"13
7'11"2
1'2"5
9'10"8
1'11"61'
4"1 3'1"3'5"128'1"A
B
C D E
FGH
5 12
2X4(A1)
4X7
1.5X4
1.5X4
7X10
3X3
1.5X6
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2700f-2.2E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 4.67
BC: From 10 plf at 0.00 to 10 plf at 4.67
BC: 811 lb Conc. Load at 1.94
BC: 113 lb Conc. Load at 3.64
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C 633 /-/-/-/393 /-
B 595 /-/-/-/359 /-
Wind reactions based on MWFRS
C Brg Width = -Min Req =-
B Brg Width = 7.6 Min Req =1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.034 C 999 360
VERT(CL):0.061 C 894 240
HORZ(LL):0.018 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.911
Max Web CSI:0.158
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:176020 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T55 /
DrwNo:193.21.0723.06719
SSB /WHK 07/12/2021
4'8"
4'8"
4'8"2'3"64"1 8'1"
A
B
C
5
121.5X4
1.5X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2700f-2.2E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 4.67
BC: From 10 plf at 0.00 to 10 plf at 4.67
BC: 811 lb Conc. Load at 1.94
BC: 113 lb Conc. Load at 3.64
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
C 633 /-/-/-/393 /-
B 595 /-/-/-/359 /-
Wind reactions based on MWFRS
C Brg Width = -Min Req =-
B Brg Width = 7.6 Min Req =1.5
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.034 C 999 360
VERT(CL):0.061 C 894 240
HORZ(LL):0.018 C - -
HORZ(TL):0.032 C - -
Creep Factor: 2.0
Max TC CSI:0.747
Max BC CSI:0.911
Max Web CSI:0.158
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:176020 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T55 /
DrwNo:193.21.0723.06719
SSB /WHK 07/12/2021
4'8"
4'8"
4'8"2'3"64"1 8'1"
A
B
C
5
121.5X4
1.5X4
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.67
TC: From 28 plf at 4.67 to 28 plf at 6.00
TC: From 55 plf at 6.00 to 55 plf at 10.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.70
BC: From 10 plf at 4.70 to 10 plf at 5.97
BC: From 20 plf at 5.97 to 20 plf at 10.67
TC: 280 lb Conc. Load at 4.70, 5.97
BC: 161 lb Conc. Load at 4.70, 5.97
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 881 /-/-/-/541 /-
E 811 /-/-/-/479 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 976 -1607
C - D 851 -1509
Chords Tens.Comp.
D - E 980 -1611
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1440 -858
Chords Tens.Comp.
F - E 1446 -864
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.034 F 999 360
VERT(CL):0.063 F 999 240
HORZ(LL):0.013 F - -
HORZ(TL):0.023 F - -
Creep Factor: 2.0
Max TC CSI:0.304
Max BC CSI:0.529
Max Web CSI:0.049
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:176017 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T45 /
DrwNo:193.21.0723.05547
SSB /WHK 07/12/2021
10'8"
4'8"
4'8"
6'
1'4"
10'8"
4'8"
5'4"
5'4"
10'8"
5'4"1'
4"12'3"62'8"28'1"A
B
C D
E
F
5
12
3X4(A1)
5X5
5X5
5X5
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.67
TC: From 28 plf at 4.67 to 28 plf at 6.00
TC: From 55 plf at 6.00 to 55 plf at 10.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.70
BC: From 10 plf at 4.70 to 10 plf at 5.97
BC: From 20 plf at 5.97 to 20 plf at 10.67
TC: 280 lb Conc. Load at 4.70, 5.97
BC: 161 lb Conc. Load at 4.70, 5.97
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 881 /-/-/-/541 /-
E 811 /-/-/-/479 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 976 -1607
C - D 851 -1509
Chords Tens.Comp.
D - E 980 -1611
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1440 -858
Chords Tens.Comp.
F - E 1446 -864
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.034 F 999 360
VERT(CL):0.063 F 999 240
HORZ(LL):0.013 F - -
HORZ(TL):0.023 F - -
Creep Factor: 2.0
Max TC CSI:0.304
Max BC CSI:0.529
Max Web CSI:0.049
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:176017 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T45 /
DrwNo:193.21.0723.05547
SSB /WHK 07/12/2021
10'8"
4'8"
4'8"
6'
1'4"
10'8"
4'8"
5'4"
5'4"
10'8"
5'4"1'
4"12'3"62'8"28'1"A
B
C D
E
F
5
12
3X4(A1)
5X5
5X5
5X5
2X5(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 5.06
TC: From 73 plf at 5.06 to 73 plf at 18.94
TC: From 100 plf at 18.94 to 100 plf at 24.24
TC: From 55 plf at 24.24 to 55 plf at 30.67
BC: From 10 plf at 0.00 to 10 plf at 18.94
BC: From 20 plf at 18.94 to 20 plf at 29.67
BC: From 4 plf at 29.67 to 4 plf at 30.67
TC: 99 lb Conc. Load at 1.06
TC: 70 lb Conc. Load at 3.06
TC: 109 lb Conc. Load at 5.06
PLT: 109 lb Conc. Load at ( 7.06,10.33), (9.06,10.33)
(11.06,10.33), (13.06,10.33), (15.06,10.33), (17.06,10.33)
BC: 80 lb Conc. Load at 1.06
BC: 91 lb Conc. Load at 3.06
BC: 82 lb Conc. Load at 5.06, 7.06, 9.06,11.06
13.06,15.06,17.06
BC: 633 lb Conc. Load at 18.94
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2452 /-/-/-/1460 /-
Q 2299 /-/-/-/1448 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =2.0
Q Brg Width = 7.6 Min Req =1.9
Bearings A & Q are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 3042 -5042
B - C 2182 -3535
C - D 2107 -3464
D - E 2066 -3414
E - F 2125 -3483
F - G 2131 -3490
G - H 2100 -3456
H - I 2066 -3408
Chords Tens.Comp.
I - J 2067 -3409
J - K 2099 -3455
K - L 2128 -3487
L - M 2128 -3486
M - N 2087 -3444
N - O 2121 -3480
O - P 2166 -3521
P - Q 3189 -5075
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - W 4552 -2736
W -V 4557 -2729
V - U 5132 -3067
Chords Tens.Comp.
U - T 5497 -3476
T - S 4630 -2890
S - Q 4634 -2900
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 1103 -1942
B - V 621 -338
X - Y 1107 -1945
Y - Z 1106 -1944
Z -AA 1114 -1952
AA- U 1111 -1880
I -AE 2252 -1294
U -AI 1552 -2273
Webs Tens.Comp.
AE- U 1974 -1071
AI- T 504 -179
AI-AJ 1558 -2364
T - P 985 -643
AJ-AK 1551 -2357
AK-AL 1549 -2355
AL- P 1544 -2349
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.313 N 999 360
VERT(CL):0.543 N 649 240
HORZ(LL):0.101 S - -
HORZ(TL):0.175 S - -
Creep Factor: 2.0
Max TC CSI:0.773
Max BC CSI:0.943
Max Web CSI:0.955
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:176100 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T7 /
DrwNo:193.21.0723.05718
SSB /WHK 07/12/2021
T1
1'8"63"8
4'9"10
1'11"1410'3"5
29'8"
6'8"1'4"
(TYP)
4'4"11
4'4"11
14'8"
10'3"5
24'11"5
10'3"5
29'8"
4'8"11
4'5"12
4'5"12
9'5"2
4'11"6
14'8"
5'2"14
19'10"14
5'2"14
24'10"4
4'11"6
29'8"
4'9"12 1'
5"12 4"1
14'9"12 9'10"12 4'11"86'7"16'11"13(a)
8'1"
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O P
Q
R
STUVW
X Y Z AA AE
AI
AJ
AK AL
5
12
5X8(B3)
5X10
H05104X4
5X5
8X85X8 4X5H0510
6X10
4X8(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 28 plf at 0.00 to 28 plf at 5.06
TC: From 73 plf at 5.06 to 73 plf at 18.94
TC: From 100 plf at 18.94 to 100 plf at 24.24
TC: From 55 plf at 24.24 to 55 plf at 30.67
BC: From 10 plf at 0.00 to 10 plf at 18.94
BC: From 20 plf at 18.94 to 20 plf at 29.67
BC: From 4 plf at 29.67 to 4 plf at 30.67
TC: 99 lb Conc. Load at 1.06
TC: 70 lb Conc. Load at 3.06
TC: 109 lb Conc. Load at 5.06
PLT: 109 lb Conc. Load at ( 7.06,10.33), (9.06,10.33)
(11.06,10.33), (13.06,10.33), (15.06,10.33), (17.06,10.33)
BC: 80 lb Conc. Load at 1.06
BC: 91 lb Conc. Load at 3.06
BC: 82 lb Conc. Load at 5.06, 7.06, 9.06,11.06
13.06,15.06,17.06
BC: 633 lb Conc. Load at 18.94
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 2452 /-/-/-/1460 /-
Q 2299 /-/-/-/1448 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =2.0
Q Brg Width = 7.6 Min Req =1.9
Bearings A & Q are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 3042 -5042
B - C 2182 -3535
C - D 2107 -3464
D - E 2066 -3414
E - F 2125 -3483
F - G 2131 -3490
G - H 2100 -3456
H - I 2066 -3408
Chords Tens.Comp.
I - J 2067 -3409
J - K 2099 -3455
K - L 2128 -3487
L - M 2128 -3486
M - N 2087 -3444
N - O 2121 -3480
O - P 2166 -3521
P - Q 3189 -5075
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - W 4552 -2736
W -V 4557 -2729
V - U 5132 -3067
Chords Tens.Comp.
U - T 5497 -3476
T - S 4630 -2890
S - Q 4634 -2900
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - X 1103 -1942
B - V 621 -338
X - Y 1107 -1945
Y - Z 1106 -1944
Z -AA 1114 -1952
AA- U 1111 -1880
I -AE 2252 -1294
U -AI 1552 -2273
Webs Tens.Comp.
AE- U 1974 -1071
AI- T 504 -179
AI-AJ 1558 -2364
T - P 985 -643
AJ-AK 1551 -2357
AK-AL 1549 -2355
AL- P 1544 -2349
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.313 N 999 360
VERT(CL):0.543 N 649 240
HORZ(LL):0.101 S - -
HORZ(TL):0.175 S - -
Creep Factor: 2.0
Max TC CSI:0.773
Max BC CSI:0.943
Max Web CSI:0.955
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:176100 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T7 /
DrwNo:193.21.0723.05718
SSB /WHK 07/12/2021
T1
1'8"63"8
4'9"10
1'11"1410'3"5
29'8"
6'8"1'4"
(TYP)
4'4"11
4'4"11
14'8"
10'3"5
24'11"5
10'3"5
29'8"
4'8"11
4'5"12
4'5"12
9'5"2
4'11"6
14'8"
5'2"14
19'10"14
5'2"14
24'10"4
4'11"6
29'8"
4'9"12 1'
5"12 4"1
14'9"12 9'10"12 4'11"86'7"16'11"13(a)
8'1"
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O P
Q
R
STUVW
X Y Z AA AE
AI
AJ
AK AL
5
12
5X8(B3)
5X10
H05104X4
5X5
8X85X8 4X5H0510
6X10
4X8(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1114 /-/-/610 /647 /249
H 1176 /-/-/682 /689 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
H Brg Width = 7.6 Min Req =1.5
Bearings A & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1264 -2171
B - C 1164 -1853
C - D 979 -1459
D - E 963 -1338
Chords Tens.Comp.
E - F 979 -1459
F - G 1179 -1880
G - H 1323 -2273
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 1934 -1043
N - M 1933 -1045
M - L 1655 -818
Chords Tens.Comp.
L - K 1672 -827
K - J 2036 -1104
J - H 2039 -1103
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - L 374 -503
D - L 425 -258
L - E 415 -253
Webs Tens.Comp.
L - F 387 -526
K - G 334 -432
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.127 L 999 360
VERT(CL):0.237 L 999 240
HORZ(LL):0.049 J - -
HORZ(TL):0.091 J - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.828
Max Web CSI:0.340
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:176206 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T5 /
DrwNo:193.21.0723.05079
SSB /WHK 07/12/2021
29'8"
6'4"12
6'4"12
10'4"12
4'
14'2"8
3'9"12
15'1"8
11"
18'11"4
3'9"12
22'11"4
4'
29'8"
6'8"12
6'3"
6'3"
10'1"4
3'10"4
14'8"
4'6"12
19'2"12
4'6"12
23'1"
3'10"4
29'8"
6'7"1'
5"12 4"16'4"126'9"88'1"
A
B
C
D E
F
G
H
I
JKLMN
5 12
3X5(B1)1.5X4
3X4
3X4
3X4
4X4
5X10
4X4
3X4
3X4
3X4
1.5X4 3X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1114 /-/-/610 /647 /249
H 1176 /-/-/682 /689 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
H Brg Width = 7.6 Min Req =1.5
Bearings A & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1264 -2171
B - C 1164 -1853
C - D 979 -1459
D - E 963 -1338
Chords Tens.Comp.
E - F 979 -1459
F - G 1179 -1880
G - H 1323 -2273
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 1934 -1043
N - M 1933 -1045
M - L 1655 -818
Chords Tens.Comp.
L - K 1672 -827
K - J 2036 -1104
J - H 2039 -1103
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - L 374 -503
D - L 425 -258
L - E 415 -253
Webs Tens.Comp.
L - F 387 -526
K - G 334 -432
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.127 L 999 360
VERT(CL):0.237 L 999 240
HORZ(LL):0.049 J - -
HORZ(TL):0.091 J - -
Creep Factor: 2.0
Max TC CSI:0.520
Max BC CSI:0.828
Max Web CSI:0.340
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:176206 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T5 /
DrwNo:193.21.0723.05079
SSB /WHK 07/12/2021
29'8"
6'4"12
6'4"12
10'4"12
4'
14'2"8
3'9"12
15'1"8
11"
18'11"4
3'9"12
22'11"4
4'
29'8"
6'8"12
6'3"
6'3"
10'1"4
3'10"4
14'8"
4'6"12
19'2"12
4'6"12
23'1"
3'10"4
29'8"
6'7"1'
5"12 4"16'4"126'9"88'1"
A
B
C
D E
F
G
H
I
JKLMN
5 12
3X5(B1)1.5X4
3X4
3X4
3X4
4X4
5X10
4X4
3X4
3X4
3X4
1.5X4 3X5(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/613 /635 /234
N 1430 /-/-/684 /679 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
N Brg Width = 7.6 Min Req =1.5
Bearings A & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1272 -2929
B - C 1104 -2603
C - D 1045 -2227
D - E 399 -113
E - F 484 -53
F - G 978 -2014
Chords Tens.Comp.
G - H 460 -294
G - I 1271 -2560
H - J 622 -319
I - L 1235 -2576
L - M 1193 -2665
M - N 1380 -2931
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2641 -1059
U - T 2645 -1059
T - S 2645 -1058
S - R 2232 -738
Chords Tens.Comp.
R - Q 2472 -950
Q - P 2471 -950
P - N 2665 -1181
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 420 -607
S - C 800 -178
D - F 1117 -2674
Webs Tens.Comp.
H - I 991 -384
J - R 827 -199
R - K 294 -408
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.332 S 999 360
VERT(CL):0.551 S 640 240
HORZ(LL):0.110 C - -
HORZ(TL):0.188 C - -
Creep Factor: 2.0
Max TC CSI:0.643
Max BC CSI:0.569
Max Web CSI:0.312
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:176187 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T29 /
DrwNo:193.21.0723.05001
SSB /WHK 07/12/2021
T2
T3
B2
B3
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'5"8
1'1"8
17'1"8
2'8"
20'11"12
3'10"4
25'0"14
4'1"2
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 5'6"123'4"126'0"66'5"28'1"
A
B
C
D E F G
H I J
K L
M
N
O
PQRSTU
5
12
4X5(B1)1.5X4
7X6
4X43X4
3X6
3X5
SS0712(**)
3X54X4 3X85X5
3X6
3X4H0510
4X61.5X4
3X4
1.5X4
4X5(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E; B3 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/613 /635 /234
N 1430 /-/-/684 /679 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
N Brg Width = 7.6 Min Req =1.5
Bearings A & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1272 -2929
B - C 1104 -2603
C - D 1045 -2227
D - E 399 -113
E - F 484 -53
F - G 978 -2014
Chords Tens.Comp.
G - H 460 -294
G - I 1271 -2560
H - J 622 -319
I - L 1235 -2576
L - M 1193 -2665
M - N 1380 -2931
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2641 -1059
U - T 2645 -1059
T - S 2645 -1058
S - R 2232 -738
Chords Tens.Comp.
R - Q 2472 -950
Q - P 2471 -950
P - N 2665 -1181
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 420 -607
S - C 800 -178
D - F 1117 -2674
Webs Tens.Comp.
H - I 991 -384
J - R 827 -199
R - K 294 -408
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, 18SS, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.332 S 999 360
VERT(CL):0.551 S 640 240
HORZ(LL):0.110 C - -
HORZ(TL):0.188 C - -
Creep Factor: 2.0
Max TC CSI:0.643
Max BC CSI:0.569
Max Web CSI:0.312
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:176187 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T29 /
DrwNo:193.21.0723.05001
SSB /WHK 07/12/2021
T2
T3
B2
B3
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'5"8
1'1"8
17'1"8
2'8"
20'11"12
3'10"4
25'0"14
4'1"2
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 5'6"123'4"126'0"66'5"28'1"
A
B
C
D E F G
H I J
K L
M
N
O
PQRSTU
5
12
4X5(B1)1.5X4
7X6
4X43X4
3X6
3X5
SS0712(**)
3X54X4 3X85X5
3X6
3X4H0510
4X61.5X4
3X4
1.5X4
4X5(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/609 /636 /234
N 1430 /-/-/681 /677 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
N Brg Width = 7.6 Min Req =1.7
Bearings A & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1266 -2912
B - C 1153 -2696
C - D 1081 -2290
D - E 1141 -367
E - F 1239 -412
Chords Tens.Comp.
F - G 1036 -2173
G - J 1285 -2663
J - L 1256 -2642
L - M 1197 -2683
M - N 1385 -2945
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2625 -1054
U - T 2634 -1056
T - S 2634 -1056
S - R 2330 -789
Chords Tens.Comp.
R - Q 2443 -922
Q - P 2443 -922
P - N 2676 -1184
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 360 -534
S - C 871 -209
D - F 1568 -3618
Webs Tens.Comp.
H - R 584 -65
I - J 1100 -467
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.320 R 999 360
VERT(CL):0.551 R 639 240
HORZ(LL):0.092 C - -
HORZ(TL):0.166 C - -
Creep Factor: 2.0
Max TC CSI:0.627
Max BC CSI:0.905
Max Web CSI:0.248
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:176183 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T52 /
DrwNo:193.21.0723.06391
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'6"14
1'2"14
16'5"8
1'10"10
17'6"4
1'0"12
19'1"8
1'7"4
20'11"12
1'10"4
25'0"14
4'1"2
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 4'8"123'4"126'0"66'5"28'1"
A
B
C
D E F
G H
I J
K L
M
N
O
PQRSTU
5 12
4X5(B1)1.5X4
7X6
H05104X5
3X6
H0310
SS0508
H0310
4X42X5
3X4H0510
3X85X5
6X61.5X4
3X4
1.5X4
4X5(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/609 /636 /234
N 1430 /-/-/681 /677 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
N Brg Width = 7.6 Min Req =1.7
Bearings A & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1266 -2912
B - C 1153 -2696
C - D 1081 -2290
D - E 1141 -367
E - F 1239 -412
Chords Tens.Comp.
F - G 1036 -2173
G - J 1285 -2663
J - L 1256 -2642
L - M 1197 -2683
M - N 1385 -2945
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2625 -1054
U - T 2634 -1056
T - S 2634 -1056
S - R 2330 -789
Chords Tens.Comp.
R - Q 2443 -922
Q - P 2443 -922
P - N 2676 -1184
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - S 360 -534
S - C 871 -209
D - F 1568 -3618
Webs Tens.Comp.
H - R 584 -65
I - J 1100 -467
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.320 R 999 360
VERT(CL):0.551 R 639 240
HORZ(LL):0.092 C - -
HORZ(TL):0.166 C - -
Creep Factor: 2.0
Max TC CSI:0.627
Max BC CSI:0.905
Max Web CSI:0.248
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:176183 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T52 /
DrwNo:193.21.0723.06391
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'6"14
1'2"14
16'5"8
1'10"10
17'6"4
1'0"12
19'1"8
1'7"4
20'11"12
1'10"4
25'0"14
4'1"2
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 4'8"123'4"126'0"66'5"28'1"
A
B
C
D E F
G H
I J
K L
M
N
O
PQRSTU
5 12
4X5(B1)1.5X4
7X6
H05104X5
3X6
H0310
SS0508
H0310
4X42X5
3X4H0510
3X85X5
6X61.5X4
3X4
1.5X4
4X5(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/605 /638 /234
L 1430 /-/-/678 /676 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings A & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1263 -2897
B - C 1189 -2766
C - D 1103 -2331
D - E 1680 -617
E - F 1736 -643
F - G 1077 -2275
Chords Tens.Comp.
G - H 1065 -2473
H - I 154 -523
H - J 1116 -2367
J - K 1204 -2703
K - L 1379 -2939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 2612 -1051
S - R 2625 -1055
R - Q 2625 -1054
Q - P 2397 -823
Chords Tens.Comp.
P - O 2524 -949
O - N 2523 -950
N - L 2667 -1177
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 360 -461
Q - C 944 -244
D - F 1864 -4247
Webs Tens.Comp.
G - P 491 0
I - J 979 -348
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.607 H 580 360
VERT(CL):1.003 H 351 240
HORZ(LL):-0.117 J - -
HORZ(TL):0.210 J - -
Creep Factor: 2.0
Max TC CSI:0.785
Max BC CSI:0.779
Max Web CSI:0.577
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:176176 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T8 /
DrwNo:193.21.0723.05937
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'6"14
1'2"14
18'5"8
3'10"10
21'1"8
2'8"
25'0"14
3'11"6
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 3'10"123'4"126'0"66'5"28'1"
A
B
C
D E F
G
H
I J
K
L
M
NOPQRS
5 12
4X5(B1)1.5X4
7X6
H05104X5
3X6
H0310
SS0508
H0310
1.5X6
3X4H0510
4X4
7X64X4
3X4
1.5X4
4X5(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-8 to 17-4-8: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1425 /-/-/605 /638 /234
L 1430 /-/-/678 /676 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings A & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1263 -2897
B - C 1189 -2766
C - D 1103 -2331
D - E 1680 -617
E - F 1736 -643
F - G 1077 -2275
Chords Tens.Comp.
G - H 1065 -2473
H - I 154 -523
H - J 1116 -2367
J - K 1204 -2703
K - L 1379 -2939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 2612 -1051
S - R 2625 -1055
R - Q 2625 -1054
Q - P 2397 -823
Chords Tens.Comp.
P - O 2524 -949
O - N 2523 -950
N - L 2667 -1177
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 360 -461
Q - C 944 -244
D - F 1864 -4247
Webs Tens.Comp.
G - P 491 0
I - J 979 -348
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.607 H 580 360
VERT(CL):1.003 H 351 240
HORZ(LL):-0.117 J - -
HORZ(TL):0.210 J - -
Creep Factor: 2.0
Max TC CSI:0.785
Max BC CSI:0.779
Max Web CSI:0.577
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:176176 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T8 /
DrwNo:193.21.0723.05937
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"
6'0"12
6'0"12
9'1"12
3'1"
12'5"6
3'3"10
13'4"
10"10
14'6"14
1'2"14
18'5"8
3'10"10
21'1"8
2'8"
25'0"14
3'11"6
29'8"
4'7"2
5'11"12
5'11"12
8'4"
2'4"4
9'
8"
14'6"14
5'6"14
18'4"
3'9"2
21'1"8
2'9"8
29'8"
8'6"8 1'
5"12 4"1 3'10"123'4"126'0"66'5"28'1"
A
B
C
D E F
G
H
I J
K
L
M
NOPQRS
5 12
4X5(B1)1.5X4
7X6
H05104X5
3X6
H0310
SS0508
H0310
1.5X6
3X4H0510
4X4
7X64X4
3X4
1.5X4
4X5(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-14 to 17-4-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1426 /-/-/602 /644 /235
J 1431 /-/-/675 /687 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
J Brg Width = 7.6 Min Req =1.7
Bearings A & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1287 -2921
B - C 1199 -2753
C - D 1113 -2323
D - E 1518 -558
E - F 1586 -590
Chords Tens.Comp.
F - G 1082 -2255
G - H 1237 -2859
H - I 1534 -3303
I - J 1312 -2900
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 2636 -1074
R - Q 2647 -1077
Q - P 2647 -1077
P - O 2382 -831
Chords Tens.Comp.
O - N 3396 -1379
N - M 3396 -1379
M - L 2620 -1090
L - J 2614 -1092
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 365 -495
P - C 929 -245
D - F 1810 -4063
G - O 1388 -423
Webs Tens.Comp.
O - H 747 -1388
H - M 288 -870
M - I 1046 -398
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.489 O 721 360
VERT(CL):0.816 O 432 240
HORZ(LL):0.093 C - -
HORZ(TL):0.165 C - -
Creep Factor: 2.0
Max TC CSI:0.667
Max BC CSI:0.841
Max Web CSI:0.359
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:176171 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T9 /
DrwNo:193.21.0723.05750
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"6
6'1"2
6'1"2
9'2"2
3'1"
12'5"12
3'3"10
13'4"6
10"10
14'7"4
1'2"14
17'6"10
2'11"6
20'5"14
2'11"4
23'1"14
2'8"
29'8"6
6'6"8
6'0"2
6'0"2
8'4"6
2'4"4
9'0"6
8"
14'7"4
5'6"14
18'4"6
3'9"2
20'9"6
2'5"
23'0"2
2'2"12
29'8"6
6'8"4 1'
5"9 4"1 3'0"123'4"126'0"66'5"28'1"
A
B
C
D E F
G
H I
J
K
LMNOPQR
5 12
4X5(B1)1.5X4
7X6
H05103X5
3X6
H0310
SS0508
H0310
3X8
4X5H0510
7X6
3X5 1.5X4
4X8
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T3 2x6 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Loading
Attic room loading from 9-3-14 to 17-4-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1426 /-/-/602 /644 /235
J 1431 /-/-/675 /687 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
J Brg Width = 7.6 Min Req =1.7
Bearings A & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1287 -2921
B - C 1199 -2753
C - D 1113 -2323
D - E 1518 -558
E - F 1586 -590
Chords Tens.Comp.
F - G 1082 -2255
G - H 1237 -2859
H - I 1534 -3303
I - J 1312 -2900
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 2636 -1074
R - Q 2647 -1077
Q - P 2647 -1077
P - O 2382 -831
Chords Tens.Comp.
O - N 3396 -1379
N - M 3396 -1379
M - L 2620 -1090
L - J 2614 -1092
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 365 -495
P - C 929 -245
D - F 1810 -4063
G - O 1388 -423
Webs Tens.Comp.
O - H 747 -1388
H - M 288 -870
M - I 1046 -398
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS, 18SS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.489 O 721 360
VERT(CL):0.816 O 432 240
HORZ(LL):0.093 C - -
HORZ(TL):0.165 C - -
Creep Factor: 2.0
Max TC CSI:0.667
Max BC CSI:0.841
Max Web CSI:0.359
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:176171 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T9 /
DrwNo:193.21.0723.05750
SSB /WHK 07/12/2021
T2
T3
B1 B2
8'1"4'6"1229'8"6
6'1"2
6'1"2
9'2"2
3'1"
12'5"12
3'3"10
13'4"6
10"10
14'7"4
1'2"14
17'6"10
2'11"6
20'5"14
2'11"4
23'1"14
2'8"
29'8"6
6'6"8
6'0"2
6'0"2
8'4"6
2'4"4
9'0"6
8"
14'7"4
5'6"14
18'4"6
3'9"2
20'9"6
2'5"
23'0"2
2'2"12
29'8"6
6'8"4 1'
5"9 4"1 3'0"123'4"126'0"66'5"28'1"
A
B
C
D E F
G
H I
J
K
LMNOPQR
5 12
4X5(B1)1.5X4
7X6
H05103X5
3X6
H0310
SS0508
H0310
3X8
4X5H0510
7X6
3X5 1.5X4
4X8
3X6(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T4 2x6 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 9-3-14 to 17-4-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1426 /-/-/605 /647 /206
L 1431 /-/-/679 /689 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings A & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1287 -2910
B - C 1270 -2909
C - D 1204 -2542
F - G 481 -668
G - H 1175 -2480
Chords Tens.Comp.
H - I 1318 -3037
I - J 1744 -3805
J - K 1793 -3887
K - L 1366 -2962
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2624 -1073
U - T 2637 -1077
T - S 2637 -1077
S - R 2622 -937
R - Q 3527 -1458
Chords Tens.Comp.
Q - P 3526 -1458
P - O 4030 -1727
O - N 2687 -1165
N - L 2685 -1167
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - C 762 -176
D - V 1062 -2673
E - V 550 -203
V - W 787 -2056
V - F 292 -644
W -F 383 -147
W -G 826 -2160
Webs Tens.Comp.
H - R 1239 -369
R - I 690 -1254
I - P 488 -291
P - J 365 -701
J - O 448 -951
O - K 1545 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.379 R 931 360
VERT(CL):0.682 R 517 240
HORZ(LL):0.063 N - -
HORZ(TL):0.105 N - -
Creep Factor: 2.0
Max TC CSI:0.937
Max BC CSI:0.928
Max Web CSI:0.349
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:176202 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T84 /
DrwNo:193.21.0723.05531
SSB /WHK 07/12/2021
T2
T4
B1 B2
8'1"3'8"1229'8"6
6'1"2
6'1"2
9'2"2
3'1"
10'5"11
1'3"9
11'6"14
1'1"3
15'1"14
3'7"
16'7"4
1'5"6
17'6"10
11"6
20'5"14
2'11"4
22'5"14
2'
25'1"14
2'8"
29'8"6
4'6"8
6'0"2
6'0"2
8'4"6
2'4"4
9'0"6
8"
16'7"4
7'6"14
18'4"6
1'9"2
20'9"6
2'5"
22'9"6
2'
25'0"2
2'2"12
29'8"6
4'8"4 1'
5"9 4"1 2'2"123'4"125'3"75'8"38'1"
A
B
C
D
E F
G
H
I
J K
L
M
NOPQRSTU
V W512
4X5(B1)1.5X4
7X6
H05104X5
2X6
4X4(**)5X5
3X4 1.5X45X8
3X5
3X8
4X4H0510
3X4
3X4
7X6
4X5 1.5X4
5X8
4X5(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2,T4 2x6 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 9-3-14 to 17-4-14: Live Load:
30 PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls:
0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1426 /-/-/605 /647 /206
L 1431 /-/-/679 /689 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
L Brg Width = 7.6 Min Req =1.7
Bearings A & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1287 -2910
B - C 1270 -2909
C - D 1204 -2542
F - G 481 -668
G - H 1175 -2480
Chords Tens.Comp.
H - I 1318 -3037
I - J 1744 -3805
J - K 1793 -3887
K - L 1366 -2962
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - U 2624 -1073
U - T 2637 -1077
T - S 2637 -1077
S - R 2622 -937
R - Q 3527 -1458
Chords Tens.Comp.
Q - P 3526 -1458
P - O 4030 -1727
O - N 2687 -1165
N - L 2685 -1167
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - C 762 -176
D - V 1062 -2673
E - V 550 -203
V - W 787 -2056
V - F 292 -644
W -F 383 -147
W -G 826 -2160
Webs Tens.Comp.
H - R 1239 -369
R - I 690 -1254
I - P 488 -291
P - J 365 -701
J - O 448 -951
O - K 1545 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.379 R 931 360
VERT(CL):0.682 R 517 240
HORZ(LL):0.063 N - -
HORZ(TL):0.105 N - -
Creep Factor: 2.0
Max TC CSI:0.937
Max BC CSI:0.928
Max Web CSI:0.349
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:176202 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T84 /
DrwNo:193.21.0723.05531
SSB /WHK 07/12/2021
T2
T4
B1 B2
8'1"3'8"1229'8"6
6'1"2
6'1"2
9'2"2
3'1"
10'5"11
1'3"9
11'6"14
1'1"3
15'1"14
3'7"
16'7"4
1'5"6
17'6"10
11"6
20'5"14
2'11"4
22'5"14
2'
25'1"14
2'8"
29'8"6
4'6"8
6'0"2
6'0"2
8'4"6
2'4"4
9'0"6
8"
16'7"4
7'6"14
18'4"6
1'9"2
20'9"6
2'5"
22'9"6
2'
25'0"2
2'2"12
29'8"6
4'8"4 1'
5"9 4"1 2'2"123'4"125'3"75'8"38'1"
A
B
C
D
E F
G
H
I
J K
L
M
NOPQRSTU
V W512
4X5(B1)1.5X4
7X6
H05104X5
2X6
4X4(**)5X5
3X4 1.5X45X8
3X5
3X8
4X4H0510
3X4
3X4
7X6
4X5 1.5X4
5X8
4X5(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
B3 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5,W11 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 30.70
BC: From 20 plf at 0.00 to 20 plf at 9.32
BC: From 90 plf at 9.32 to 90 plf at 17.41
BC: From 20 plf at 17.41 to 20 plf at 29.70
BC: From 4 plf at 29.70 to 4 plf at 30.70
TC: 104 lb Conc. Load at 27.13
BC: 557 lb Conc. Load at 20.38
BC: -51 lb Conc. Load at 24.38
BC: 81 lb Conc. Load at 27.13
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WIND LOAD CASE MODIFIED!
Collar-tie braced with continuous lateral
bracing at 24" OC. or rigid ceiling.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1606 /-/-/-/1110 /-
K 1943 /-/-/-/1227 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
K Brg Width = 7.6 Min Req =1.6
Bearings A & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2351 -3311
B - C 2348 -3267
C - D 877 -1313
D - E 1539 -1945
E - F 1539 -1945
Chords Tens.Comp.
F - G 1952 -2900
G - H 3060 -4578
H - I 3678 -5668
I - J 4188 -6635
J - K 2575 -4113
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 2982 -2102
T - S 2991 -2114
S - R 2994 -2136
R - Q 3653 -2579
Q - P 4145 -2773
Chords Tens.Comp.
P - O 5266 -3402
O - N 7043 -4474
N - M 3752 -2330
M - K 3745 -2337
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 415 -544
C - R 1594 -1077
C - U 1773 -2782
U - V 1779 -2794
D - W 1131 -769
V - W 1785 -2813
W -X 674 -1126
W -F 376 -945
X - F 1101 -632
X - Y 782 -1194
Webs Tens.Comp.
Y - Q 1247 -700
Y - G 814 -1213
Q - G 661 -1036
G - P 1315 -712
P - H 801 -1413
O - H 1082 -548
O - I 1164 -1939
I - N 1110 -1583
N - J 3177 -2047
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.400 Q 882 360
VERT(CL):0.675 Q 523 240
HORZ(LL):0.071 M - -
HORZ(TL):0.119 M - -
Creep Factor: 2.0
Max TC CSI:0.858
Max BC CSI:0.838
Max Web CSI:0.717
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T13
Ply: 1
Qty:1
SEQN:179626 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T61
DrwNo:193.21.0911.59990
JB /WHK 07/12/2021
T3
T4
B2
B3
W5
W11
2'10"429'8"6
6'1"14
6'1"14
9'6"14
3'5"
13'4"6
3'9"8
17'1"14
3'9"8
19'1"10
1'11"12
21'8"14
2'7"4
24'5"14
2'9"
27'1"14
2'8"
29'8"6
2'6"8
6'0"2
6'0"2
7'8"14
1'8"12
21'8"14
14'
24'10"14
3'2"
27'0"2
2'1"4
29'8"6
2'8"4
1'
5"9 4"1
6'1"14 15'7"7'11"84'5"72'5"11'11"41'4"123'3"124'10"38'1"
A
B
C
D E F
G
H
I J
K
L
MNOPQRST
U V W X Y
5 12
4X6(B1)
3X4
8X12
5X10 5X6
4X7 4X7 2X64X8
2X6
4X4
5X8
3X6 H0514
3X6
H0510
3X10
5X10
4X7(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
B3 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2; W5,W11 2x4 SP 2250f-1.9E;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 30.70
BC: From 20 plf at 0.00 to 20 plf at 9.32
BC: From 90 plf at 9.32 to 90 plf at 17.41
BC: From 20 plf at 17.41 to 20 plf at 29.70
BC: From 4 plf at 29.70 to 4 plf at 30.70
TC: 104 lb Conc. Load at 27.13
BC: 557 lb Conc. Load at 20.38
BC: -51 lb Conc. Load at 24.38
BC: 81 lb Conc. Load at 27.13
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WIND LOAD CASE MODIFIED!
Collar-tie braced with continuous lateral
bracing at 24" OC. or rigid ceiling.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1606 /-/-/-/1110 /-
K 1943 /-/-/-/1227 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
K Brg Width = 7.6 Min Req =1.6
Bearings A & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 2351 -3311
B - C 2348 -3267
C - D 877 -1313
D - E 1539 -1945
E - F 1539 -1945
Chords Tens.Comp.
F - G 1952 -2900
G - H 3060 -4578
H - I 3678 -5668
I - J 4188 -6635
J - K 2575 -4113
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - T 2982 -2102
T - S 2991 -2114
S - R 2994 -2136
R - Q 3653 -2579
Q - P 4145 -2773
Chords Tens.Comp.
P - O 5266 -3402
O - N 7043 -4474
N - M 3752 -2330
M - K 3745 -2337
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 415 -544
C - R 1594 -1077
C - U 1773 -2782
U - V 1779 -2794
D - W 1131 -769
V - W 1785 -2813
W -X 674 -1126
W -F 376 -945
X - F 1101 -632
X - Y 782 -1194
Webs Tens.Comp.
Y - Q 1247 -700
Y - G 814 -1213
Q - G 661 -1036
G - P 1315 -712
P - H 801 -1413
O - H 1082 -548
O - I 1164 -1939
I - N 1110 -1583
N - J 3177 -2047
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.400 Q 882 360
VERT(CL):0.675 Q 523 240
HORZ(LL):0.071 M - -
HORZ(TL):0.119 M - -
Creep Factor: 2.0
Max TC CSI:0.858
Max BC CSI:0.838
Max Web CSI:0.717
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T13
Ply: 1
Qty:1
SEQN:179626 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T61
DrwNo:193.21.0911.59990
JB /WHK 07/12/2021
T3
T4
B2
B3
W5
W11
2'10"429'8"6
6'1"14
6'1"14
9'6"14
3'5"
13'4"6
3'9"8
17'1"14
3'9"8
19'1"10
1'11"12
21'8"14
2'7"4
24'5"14
2'9"
27'1"14
2'8"
29'8"6
2'6"8
6'0"2
6'0"2
7'8"14
1'8"12
21'8"14
14'
24'10"14
3'2"
27'0"2
2'1"4
29'8"6
2'8"4
1'
5"9 4"1
6'1"14 15'7"7'11"84'5"72'5"11'11"41'4"123'3"124'10"38'1"
A
B
C
D E F
G
H
I J
K
L
MNOPQRST
U V W X Y
5 12
4X6(B1)
3X4
8X12
5X10 5X6
4X7 4X7 2X64X8
2X6
4X4
5X8
3X6 H0514
3X6
H0510
3X10
5X10
4X7(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x8 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Attic room loading from 8-5-5 to 17-4-14: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 999 /-/-/463 /426 /170
I 1156 /-/-/366 /445 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
I Brg Width = -Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 761 -1926
B - C 661 -1674
C - E 489 -1253
Chords Tens.Comp.
E - F 609 -1489
F - G 623 -1515
G - H 281 -713
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 1714 -784
M - L 1713 -783
Chords Tens.Comp.
L - K 1491 -564
K - J 739 -257
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 336 -403
C - L 628 -144
F - K 1126 -1773
K - G 3564 -1257
Webs Tens.Comp.
G - J 475 -2039
J - H 1209 -449
H - I 475 -1235
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.251 L 966 360
VERT(CL):0.409 L 591 240
HORZ(LL):0.089 E - -
HORZ(TL):0.147 E - -
Creep Factor: 2.0
Max TC CSI:0.457
Max BC CSI:0.695
Max Web CSI:0.804
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:176190 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T4 /
DrwNo:193.21.0723.05329
SSB /WHK 07/12/2021
T2
B2
8'11"9 3'8"1220'3"13
6'1"14
6'1"14
9'0"9
2'10"11
11'1"5
2'0"12
17'6"10
6'5"5
18'4"2
9"8
20'3"13
1'11"11
6'0"2
6'0"2
8'5"5
2'5"3
17'9"
9'3"11
18'6"3
9"3
20'3"13
1'9"10
5"9 3'1"103'2"82'10"44'6"18'1"
A
B
C
D
E F G
H
IJKLM
5
12
3X4(A1)1.5X4
3X4
3X8
5X10
3X4
1.5X4 3X10
7X8(**)
10X10
6X10(**)
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x8 SP 2400f-2.0E;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
Webs: 2x4 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Loading
Attic room loading from 8-5-5 to 17-4-14: Live Load: 30
PSF. Dead Load: 5 PSF Ceiling: 0 PSF, Kneewalls: 0
PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 999 /-/-/463 /426 /170
I 1156 /-/-/366 /445 /-
Wind reactions based on MWFRS
A Brg Width = 3.5 Min Req =1.5
I Brg Width = -Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 761 -1926
B - C 661 -1674
C - E 489 -1253
Chords Tens.Comp.
E - F 609 -1489
F - G 623 -1515
G - H 281 -713
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 1714 -784
M - L 1713 -783
Chords Tens.Comp.
L - K 1491 -564
K - J 739 -257
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 336 -403
C - L 628 -144
F - K 1126 -1773
K - G 3564 -1257
Webs Tens.Comp.
G - J 475 -2039
J - H 1209 -449
H - I 475 -1235
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.251 L 966 360
VERT(CL):0.409 L 591 240
HORZ(LL):0.089 E - -
HORZ(TL):0.147 E - -
Creep Factor: 2.0
Max TC CSI:0.457
Max BC CSI:0.695
Max Web CSI:0.804
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:176190 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T4 /
DrwNo:193.21.0723.05329
SSB /WHK 07/12/2021
T2
B2
8'11"9 3'8"1220'3"13
6'1"14
6'1"14
9'0"9
2'10"11
11'1"5
2'0"12
17'6"10
6'5"5
18'4"2
9"8
20'3"13
1'11"11
6'0"2
6'0"2
8'5"5
2'5"3
17'9"
9'3"11
18'6"3
9"3
20'3"13
1'9"10
5"9 3'1"103'2"82'10"44'6"18'1"
A
B
C
D
E F G
H
IJKLM
5
12
3X4(A1)1.5X4
3X4
3X8
5X10
3X4
1.5X4 3X10
7X8(**)
10X10
6X10(**)
4X4
1.5X6
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 717 /-/-/378 /420 /121
N 755 /-/-/350 /452 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =1.5
N Brg Width = 3.5 Min Req =1.5
Bearings M & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 734 -1411
B - C 583 -1061
Chords Tens.Comp.
C - D 610 -1007
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1587 -966
J - I 1156 -682
Chords Tens.Comp.
I - H 1160 -680
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 1487 -862
M - A 377 -749
K - B 520 -655
B - J 438 -683
Webs Tens.Comp.
C - J 458 -138
D - H 530 -917
H - F 608 -358
F - G 297 -498
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 J 999 360
VERT(CL):0.103 J 999 240
HORZ(LL):0.013 G - -
HORZ(TL):0.024 G - -
Creep Factor: 2.0
Max TC CSI:0.564
Max BC CSI:0.598
Max Web CSI:0.631
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:176167 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T13 /
DrwNo:193.21.0723.05015
SSB /WHK 07/12/2021
19'3"8 4"14
5"8
5"8
2'7"7
2'1"15
9'8"6
7'0"15
13'1"5
3'4"15
17'9"11
4'8"6
19'8"6
1'10"11
5"8
5"8
2'3"15
1'10"7
9'8"6
7'4"7
13'3"1
3'6"11
17'11"7
4'8"6
19'
1'0"9
19'3"8
3"81'6"11 3'1"2"104'6"19'1"
8'1"
A B
C
D E F
GHIJKL
M
N
5 12
2.5
12
4X8(++)
1.5X4 4X4
5X5
4X4
3X8
5X10(SRS)
1.5X4
1.5X4
5X10(SRS)
3X3
2X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 717 /-/-/378 /420 /121
N 755 /-/-/350 /452 /-
Wind reactions based on MWFRS
M Brg Width = 3.5 Min Req =1.5
N Brg Width = 3.5 Min Req =1.5
Bearings M & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 734 -1411
B - C 583 -1061
Chords Tens.Comp.
C - D 610 -1007
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1587 -966
J - I 1156 -682
Chords Tens.Comp.
I - H 1160 -680
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 1487 -862
M - A 377 -749
K - B 520 -655
B - J 438 -683
Webs Tens.Comp.
C - J 458 -138
D - H 530 -917
H - F 608 -358
F - G 297 -498
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 J 999 360
VERT(CL):0.103 J 999 240
HORZ(LL):0.013 G - -
HORZ(TL):0.024 G - -
Creep Factor: 2.0
Max TC CSI:0.564
Max BC CSI:0.598
Max Web CSI:0.631
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:176167 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T13 /
DrwNo:193.21.0723.05015
SSB /WHK 07/12/2021
19'3"8 4"14
5"8
5"8
2'7"7
2'1"15
9'8"6
7'0"15
13'1"5
3'4"15
17'9"11
4'8"6
19'8"6
1'10"11
5"8
5"8
2'3"15
1'10"7
9'8"6
7'4"7
13'3"1
3'6"11
17'11"7
4'8"6
19'
1'0"9
19'3"8
3"81'6"11 3'1"2"104'6"19'1"
8'1"
A B
C
D E F
GHIJKL
M
N
5 12
2.5
12
4X8(++)
1.5X4 4X4
5X5
4X4
3X8
5X10(SRS)
1.5X4
1.5X4
5X10(SRS)
3X3
2X5
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 717 /-/-/342 /427 /86
L 756 /-/-/354 /445 /-
Wind reactions based on MWFRS
K Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings K & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 918 -1588
B - C 668 -1141
Chords Tens.Comp.
C - D 667 -1147
D - E 770 -1379
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 1680 -981
Chords Tens.Comp.
H - G 1717 -1030
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - I 1501 -854
K - A 555 -879
I - B 365 -473
B - H 455 -698
C - H 526 -214
Webs Tens.Comp.
H - D 500 -728
D - G 481 -629
G - E 1469 -820
E - F 374 -598
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 D 999 360
VERT(CL):0.170 D 999 240
HORZ(LL):0.032 F - -
HORZ(TL):0.061 F - -
Creep Factor: 2.0
Max TC CSI:0.328
Max BC CSI:0.606
Max Web CSI:0.404
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:176164 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T2 /
DrwNo:193.21.0723.05984
SSB /WHK 07/12/2021
19'3"8 4"14
5"8
5"8
4'7"7
4'1"15
9'8"6
5'0"15
15'1"5
5'4"15
19'8"6
4'7"1
5"8
5"8
4'3"15
3'10"7
9'8"6
5'4"7
15'11"7
6'3"1
19'
3'0"9
19'3"8
3"81'1'4"11
2'3"7"104'6"19'1"
8'1"
A B
C
D E
F
GHIJ
K
L
5 12
2.5
12
4X8
2X61.5X4 4X4
5X5
4X4
3X8
5X5
5X5
4X4
4X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
K 717 /-/-/342 /427 /86
L 756 /-/-/354 /445 /-
Wind reactions based on MWFRS
K Brg Width = 3.5 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
Bearings K & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 918 -1588
B - C 668 -1141
Chords Tens.Comp.
C - D 667 -1147
D - E 770 -1379
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 1680 -981
Chords Tens.Comp.
H - G 1717 -1030
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - I 1501 -854
K - A 555 -879
I - B 365 -473
B - H 455 -698
C - H 526 -214
Webs Tens.Comp.
H - D 500 -728
D - G 481 -629
G - E 1469 -820
E - F 374 -598
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.091 D 999 360
VERT(CL):0.170 D 999 240
HORZ(LL):0.032 F - -
HORZ(TL):0.061 F - -
Creep Factor: 2.0
Max TC CSI:0.328
Max BC CSI:0.606
Max Web CSI:0.404
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:176164 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T2 /
DrwNo:193.21.0723.05984
SSB /WHK 07/12/2021
19'3"8 4"14
5"8
5"8
4'7"7
4'1"15
9'8"6
5'0"15
15'1"5
5'4"15
19'8"6
4'7"1
5"8
5"8
4'3"15
3'10"7
9'8"6
5'4"7
15'11"7
6'3"1
19'
3'0"9
19'3"8
3"81'1'4"11
2'3"7"104'6"19'1"
8'1"
A B
C
D E
F
GHIJ
K
L
5 12
2.5
12
4X8
2X61.5X4 4X4
5X5
4X4
3X8
5X5
5X5
4X4
4X5
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -295# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 274 /-295 /-/161 /134 /261
W 2357 /-/-/1161 /1379 /-
Z 869 /-/-/463 /501 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =2.8
Z Brg Width = 3.5 Min Req =1.5
Bearings B, W, & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1028 -327
C - D 1169 -564
D - E 1166 -543
E - F 2376 -1333
F - G 2387 -1344
G - H 700 -360
Chords Tens.Comp.
I - J 1370 -2364
J - K 946 -1587
K - L 932 -1593
L - M 1475 -2612
M - N 854 -1529
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 322 -919
Y - X 1093 -1872
X - W 1092 -1875
W -V 723 -1122
U - T 1320 -642
Chords Tens.Comp.
T - S 1329 -640
S - R 2404 -1300
R - Q 2305 -1288
Q - P 1972 -1124
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 375 -399
D - Y 576 -907
Y - E 1537 -828
E - W 629 -1047
W -G 917 -1610
G - V 1079 -528
V - H 774 -1313
H - U 814 -464
U - I 834 -1407
Webs Tens.Comp.
I - S 1112 -652
J - R 681 -1137
K - R 1001 -545
R - L 608 -929
L - Q 505 -211
Q - M 468 -228
M - P 750 -1212
P - N 1624 -906
N - O 353 -592
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.210 J 999 360
VERT(CL):0.403 J 846 240
HORZ(LL):0.064 O - -
HORZ(TL):0.121 O - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.648
Max Web CSI:0.767
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:176161 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T20 /
DrwNo:193.21.0723.06703
SSB /WHK 07/12/2021
12'8"10 28'8"8 4"14
4'9"6
4'9"6
8'11"
4'1"10
10'10"15
1'11"15
12'8"10
1'9"11
17'0"4
4'3"10
19'10"
2'9"12
22'7"12
2'9"12
28'9"1
6'1"5
31'10"
3'0"15
35'9"9
3'11"9
39'2"15
3'5"6
41'10"
2'7"1
8'11"
8'11"
11'0"11
2'1"11
12'10"6
1'9"11
17'10"15
5'0"9
19'11"12
2'0"13
22'9"8
2'9"12
28'5"9
5'8"1
31'10"
3'4"7
36'1"1
4'3"1
41'1"10
5'0"9
41'5"2
3"81'
4"1
1'5"4'0"103'2"114'4"121'0"104'6"14'10"138'1"A B
C
D
E F G
H
I J
K
L
M N
OP
QRSTUV
WXY Z
5 12
2.5
12
3X5(A1)
1.5X4
5X5
5X8
6X10(SRS)
1.5X4
1.5X4
6X8
5X6
5X6
5X8
3X5
5X12
1.5X4 5X5
5X5
5X5
3X8
3X4
5X5
5X5
3X6
5X5
4X5
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -295# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 274 /-295 /-/161 /134 /261
W 2357 /-/-/1161 /1379 /-
Z 869 /-/-/463 /501 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =2.8
Z Brg Width = 3.5 Min Req =1.5
Bearings B, W, & Z are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1028 -327
C - D 1169 -564
D - E 1166 -543
E - F 2376 -1333
F - G 2387 -1344
G - H 700 -360
Chords Tens.Comp.
I - J 1370 -2364
J - K 946 -1587
K - L 932 -1593
L - M 1475 -2612
M - N 854 -1529
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 322 -919
Y - X 1093 -1872
X - W 1092 -1875
W -V 723 -1122
U - T 1320 -642
Chords Tens.Comp.
T - S 1329 -640
S - R 2404 -1300
R - Q 2305 -1288
Q - P 1972 -1124
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 375 -399
D - Y 576 -907
Y - E 1537 -828
E - W 629 -1047
W -G 917 -1610
G - V 1079 -528
V - H 774 -1313
H - U 814 -464
U - I 834 -1407
Webs Tens.Comp.
I - S 1112 -652
J - R 681 -1137
K - R 1001 -545
R - L 608 -929
L - Q 505 -211
Q - M 468 -228
M - P 750 -1212
P - N 1624 -906
N - O 353 -592
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.210 J 999 360
VERT(CL):0.403 J 846 240
HORZ(LL):0.064 O - -
HORZ(TL):0.121 O - -
Creep Factor: 2.0
Max TC CSI:0.708
Max BC CSI:0.648
Max Web CSI:0.767
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:176161 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T20 /
DrwNo:193.21.0723.06703
SSB /WHK 07/12/2021
12'8"10 28'8"8 4"14
4'9"6
4'9"6
8'11"
4'1"10
10'10"15
1'11"15
12'8"10
1'9"11
17'0"4
4'3"10
19'10"
2'9"12
22'7"12
2'9"12
28'9"1
6'1"5
31'10"
3'0"15
35'9"9
3'11"9
39'2"15
3'5"6
41'10"
2'7"1
8'11"
8'11"
11'0"11
2'1"11
12'10"6
1'9"11
17'10"15
5'0"9
19'11"12
2'0"13
22'9"8
2'9"12
28'5"9
5'8"1
31'10"
3'4"7
36'1"1
4'3"1
41'1"10
5'0"9
41'5"2
3"81'
4"1
1'5"4'0"103'2"114'4"121'0"104'6"14'10"138'1"A B
C
D
E F G
H
I J
K
L
M N
OP
QRSTUV
WXY Z
5 12
2.5
12
3X5(A1)
1.5X4
5X5
5X8
6X10(SRS)
1.5X4
1.5X4
6X8
5X6
5X6
5X8
3X5
5X12
1.5X4 5X5
5X5
5X5
3X8
3X4
5X5
5X5
3X6
5X5
4X5
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -406# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 219 /-406 /-/187 /219 /200
P 2528 /-/-/1233 /1464 /-
K 816 /-/-/527 /477 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =3.0
K Brg Width = 3.5 Min Req =1.5
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1309 -597
C - D 1453 -685
D - E 2204 -1123
F - G 787 -1263
Chords Tens.Comp.
G - H 1092 -1800
H - I 1261 -2032
I - J 1492 -2335
J - K 1324 -2373
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 642 -1176
Q - P 809 -1337
P - O 1383 -2266
Chords Tens.Comp.
N - M 1326 -614
M - L 1483 -670
L - K 2162 -1130
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 396 -418
D - P 744 -1382
E - P 707 -1018
E - O 2085 -1132
O - F 691 -974
F - N 1459 -822
Webs Tens.Comp.
N - G 391 -512
G - M 540 -280
M - H 675 -955
M - I 925 -587
I - L 1004 -707
J - L 376 -275
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 H 999 360
VERT(CL):0.396 H 865 240
HORZ(LL):0.061 L - -
HORZ(TL):0.114 L - -
Creep Factor: 2.0
Max TC CSI:0.926
Max BC CSI:0.898
Max Web CSI:0.636
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:176154 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T70 /
DrwNo:193.21.0723.05298
SSB /WHK 07/12/2021
12'8"10 28'8"8 4"14
4'9"7
4'9"7
8'11"1
4'1"10
12'10"14
3'11"13
20'2"7
7'3"9
25'5"12
5'3"5
30'9"1
5'3"5
31'10"
1'0"15
33'11"5
2'1"5
41'10"
7'10"11
8'11"1
8'11"1
12'10"6
3'11"5
19'10"15
7'0"9
25'2"4
5'3"5
30'7"5
5'5"1
34'1"1
3'5"12
41'1"10
7'0"9
41'5"2
3"81'
4"14'0"111'5"104'6"14'10"13(a)
8'1"A B
C
D E F G H I
J
KLMNO
PQ
5 12
2.5
12
3X5(A1)
1.5X4
5X8
3X4
3X8
6X8
5X6
5X6
4X4
3X4
4X7
5X55X5
1.5X4
5X12
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -406# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 219 /-406 /-/187 /219 /200
P 2528 /-/-/1233 /1464 /-
K 816 /-/-/527 /477 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =3.0
K Brg Width = 3.5 Min Req =1.5
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1309 -597
C - D 1453 -685
D - E 2204 -1123
F - G 787 -1263
Chords Tens.Comp.
G - H 1092 -1800
H - I 1261 -2032
I - J 1492 -2335
J - K 1324 -2373
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 642 -1176
Q - P 809 -1337
P - O 1383 -2266
Chords Tens.Comp.
N - M 1326 -614
M - L 1483 -670
L - K 2162 -1130
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 396 -418
D - P 744 -1382
E - P 707 -1018
E - O 2085 -1132
O - F 691 -974
F - N 1459 -822
Webs Tens.Comp.
N - G 391 -512
G - M 540 -280
M - H 675 -955
M - I 925 -587
I - L 1004 -707
J - L 376 -275
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 H 999 360
VERT(CL):0.396 H 865 240
HORZ(LL):0.061 L - -
HORZ(TL):0.114 L - -
Creep Factor: 2.0
Max TC CSI:0.926
Max BC CSI:0.898
Max Web CSI:0.636
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:176154 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T70 /
DrwNo:193.21.0723.05298
SSB /WHK 07/12/2021
12'8"10 28'8"8 4"14
4'9"7
4'9"7
8'11"1
4'1"10
12'10"14
3'11"13
20'2"7
7'3"9
25'5"12
5'3"5
30'9"1
5'3"5
31'10"
1'0"15
33'11"5
2'1"5
41'10"
7'10"11
8'11"1
8'11"1
12'10"6
3'11"5
19'10"15
7'0"9
25'2"4
5'3"5
30'7"5
5'5"1
34'1"1
3'5"12
41'1"10
7'0"9
41'5"2
3"81'
4"14'0"111'5"104'6"14'10"13(a)
8'1"A B
C
D E F G H I
J
KLMNO
PQ
5 12
2.5
12
3X5(A1)
1.5X4
5X8
3X4
3X8
6X8
5X6
5X6
4X4
3X4
4X7
5X55X5
1.5X4
5X12
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -448# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 186 /-448 /-/215 /270 /230
Q 2604 /-/-/1267 /1490 /-
K 852 /-/-/600 /509 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.1
K Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1379 -534
C - D 1695 -821
D - E 1950 -950
E - F 1957 -957
Chords Tens.Comp.
H - I 745 -1177
I - J 1103 -2005
J - K 1459 -2540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 573 -1249
S - R 573 -1255
R - Q 996 -1556
Q - P 680 -1029
Chords Tens.Comp.
P - O 1146 -445
O - N 1517 -668
N - M 2351 -1282
M - K 2333 -1268
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 471 -644
D - Q 638 -1082
Q - F 845 -1391
F - P 1408 -675
Webs Tens.Comp.
P - H 597 -1006
O - I 257 -422
I - N 710 -298
N - J 463 -495
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.179 N 999 360
VERT(CL):0.344 N 999 240
HORZ(LL):0.068 M - -
HORZ(TL):0.130 M - -
Creep Factor: 2.0
Max TC CSI:0.719
Max BC CSI:0.833
Max Web CSI:0.446
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T19
Ply: 1
Qty:1
SEQN:176150 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T44 /
DrwNo:193.21.0723.06126
SSB /WHK 07/12/2021
12'8"10 29'1"6
5'11"3
5'11"3
10'11"1
4'11"14
12'8"10
1'9"9
17'4"11
4'8"1
22'0"11
4'8"1
26'3"3
4'2"8
30'10"15
4'7"12
36'6"1
5'7"2
41'10"
5'3"15
5'9"7
5'9"7
10'11"1
5'1"10
12'10"6
1'11"5
21'10"15
9'0"9
26'6"11
4'7"12
32'1"1
5'6"6
36'7"13
4'6"12
41'1"10
4'5"13
41'10"
8"61'
1'
4"1
1'10"104'10"115'3"6(a)
8'1"A B
C
D E F G H I
J
K LM
NOP
QRS
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X8
3X4
1.5X4
6X8
4X4
5X10(SRS)
5X6 3X4
3X4
5X5
5X5
3X4
1.5X4
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -448# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 186 /-448 /-/215 /270 /230
Q 2604 /-/-/1267 /1490 /-
K 852 /-/-/600 /509 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.1
K Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1379 -534
C - D 1695 -821
D - E 1950 -950
E - F 1957 -957
Chords Tens.Comp.
H - I 745 -1177
I - J 1103 -2005
J - K 1459 -2540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 573 -1249
S - R 573 -1255
R - Q 996 -1556
Q - P 680 -1029
Chords Tens.Comp.
P - O 1146 -445
O - N 1517 -668
N - M 2351 -1282
M - K 2333 -1268
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 471 -644
D - Q 638 -1082
Q - F 845 -1391
F - P 1408 -675
Webs Tens.Comp.
P - H 597 -1006
O - I 257 -422
I - N 710 -298
N - J 463 -495
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.179 N 999 360
VERT(CL):0.344 N 999 240
HORZ(LL):0.068 M - -
HORZ(TL):0.130 M - -
Creep Factor: 2.0
Max TC CSI:0.719
Max BC CSI:0.833
Max Web CSI:0.446
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T19
Ply: 1
Qty:1
SEQN:176150 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T44 /
DrwNo:193.21.0723.06126
SSB /WHK 07/12/2021
12'8"10 29'1"6
5'11"3
5'11"3
10'11"1
4'11"14
12'8"10
1'9"9
17'4"11
4'8"1
22'0"11
4'8"1
26'3"3
4'2"8
30'10"15
4'7"12
36'6"1
5'7"2
41'10"
5'3"15
5'9"7
5'9"7
10'11"1
5'1"10
12'10"6
1'11"5
21'10"15
9'0"9
26'6"11
4'7"12
32'1"1
5'6"6
36'7"13
4'6"12
41'1"10
4'5"13
41'10"
8"61'
1'
4"1
1'10"104'10"115'3"6(a)
8'1"A B
C
D E F G H I
J
K LM
NOP
QRS
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X8
3X4
1.5X4
6X8
4X4
5X10(SRS)
5X6 3X4
3X4
5X5
5X5
3X4
1.5X4
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -459# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 177 /-459 /-/227 /290 /266
O 2624 /-/-/1277 /1486 /-
I 847 /-/-/612 /508 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 3.5 Min Req =3.1
I Brg Width = 7.6 Min Req =1.5
Bearings B, O, & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1457 -573
C - D 1919 -914
D - E 569 -132
E - F 571 -134
Chords Tens.Comp.
F - G 443 -631
G - H 910 -1684
H - I 1448 -2525
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 618 -1318
P - O 617 -1323
O - N 1137 -1757
N - M 655 -220
Chords Tens.Comp.
M - L 1241 -468
L - K 2330 -1260
K - I 2321 -1250
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 557 -750
O - D 1066 -1840
D - N 1441 -798
N - F 731 -1438
Webs Tens.Comp.
M - G 437 -742
F - M 623 -202
G - L 709 -281
L - H 660 -784
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.187 H 999 360
VERT(CL):0.358 H 965 240
HORZ(LL):0.076 K - -
HORZ(TL):0.144 K - -
Creep Factor: 2.0
Max TC CSI:0.954
Max BC CSI:0.902
Max Web CSI:0.948
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:176146 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T21 /
DrwNo:193.21.0723.05704
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'11"1
6'0"4
18'5"
5'5"15
23'10"15
5'5"15
28'10"15
5'
35'6"1
6'7"2
41'10"
6'3"15
6'9"1
6'9"1
12'10"6
6'1"5
18'5"
5'6"10
23'10"15
5'5"15
30'1"1
6'2"2
35'7"13
5'6"12
41'1"10
5'5"13
41'10"
8"61'
1'
4"1
2'3"105'8"116'1"6(a)
8'1"A B
C
D E F G
H
I JK
LM
N
OP
5 12
2.5
12
3X5(A1)1.5X4
3X4
5X8
5X8 1.5X4
4X8
3X5
5X10(SRS)
5X6
5X5
3X4
1.5X4
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -459# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 177 /-459 /-/227 /290 /266
O 2624 /-/-/1277 /1486 /-
I 847 /-/-/612 /508 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 3.5 Min Req =3.1
I Brg Width = 7.6 Min Req =1.5
Bearings B, O, & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1457 -573
C - D 1919 -914
D - E 569 -132
E - F 571 -134
Chords Tens.Comp.
F - G 443 -631
G - H 910 -1684
H - I 1448 -2525
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 618 -1318
P - O 617 -1323
O - N 1137 -1757
N - M 655 -220
Chords Tens.Comp.
M - L 1241 -468
L - K 2330 -1260
K - I 2321 -1250
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 557 -750
O - D 1066 -1840
D - N 1441 -798
N - F 731 -1438
Webs Tens.Comp.
M - G 437 -742
F - M 623 -202
G - L 709 -281
L - H 660 -784
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.187 H 999 360
VERT(CL):0.358 H 965 240
HORZ(LL):0.076 K - -
HORZ(TL):0.144 K - -
Creep Factor: 2.0
Max TC CSI:0.954
Max BC CSI:0.902
Max Web CSI:0.948
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:176146 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T21 /
DrwNo:193.21.0723.05704
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'11"1
6'0"4
18'5"
5'5"15
23'10"15
5'5"15
28'10"15
5'
35'6"1
6'7"2
41'10"
6'3"15
6'9"1
6'9"1
12'10"6
6'1"5
18'5"
5'6"10
23'10"15
5'5"15
30'1"1
6'2"2
35'7"13
5'6"12
41'1"10
5'5"13
41'10"
8"61'
1'
4"1
2'3"105'8"116'1"6(a)
8'1"A B
C
D E F G
H
I JK
LM
N
OP
5 12
2.5
12
3X5(A1)1.5X4
3X4
5X8
5X8 1.5X4
4X8
3X5
5X10(SRS)
5X6
5X5
3X4
1.5X4
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -423# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 189 /-423 /-/226 /279 /302
Q 2576 /-/-/1264 /1444 /-
J 864 /-/-/631 /519 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.0
J Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1371 -515
C - D 1818 -827
D - E 1149 -406
F - G 573 -868
Chords Tens.Comp.
G - H 937 -1453
H - I 810 -1480
I - J 1435 -2540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 568 -1239
R - Q 567 -1245
Q - P 1064 -1689
P - O 776 -1093
Chords Tens.Comp.
N - M 1009 -271
M - L 2334 -1233
L - J 2332 -1227
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 512 -714
D - Q 1040 -1845
D - P 1515 -723
E - P 754 -1458
E - O 1285 -679
Webs Tens.Comp.
O - F 610 -932
F - N 1034 -466
N - G 344 -568
G - M 956 -595
M - I 751 -1016
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 I 999 360
VERT(CL):0.381 I 907 240
HORZ(LL):0.076 L - -
HORZ(TL):0.144 L - -
Creep Factor: 2.0
Max TC CSI:0.854
Max BC CSI:0.744
Max Web CSI:0.936
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:176143 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T81 /
DrwNo:193.21.0723.05921
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'10"6
5'11"9
14'11"1
2'0"11
20'6"12
5'7"11
26'10"15
6'4"3
27'11"5
1'0"6
34'6"1
6'6"12
41'10"
7'3"15
6'9"1
6'9"1
12'10"6
6'1"5
14'11"1
2'0"11
20'3"4
5'4"3
25'10"15
5'7"11
28'1"1
2'2"2
34'7"13
6'6"12
41'1"10
6'5"13
41'10"
8"61'
1'
4"12'8"106'6"116'11"68'1"A B
C
D
E F G H
I
J KL
MN
O
PQR
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X5
6X8
5X8
5X5
3X5
3X4
5X6
5X61.5X4
5X12
3X4
1.5X4
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -423# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 189 /-423 /-/226 /279 /302
Q 2576 /-/-/1264 /1444 /-
J 864 /-/-/631 /519 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.0
J Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1371 -515
C - D 1818 -827
D - E 1149 -406
F - G 573 -868
Chords Tens.Comp.
G - H 937 -1453
H - I 810 -1480
I - J 1435 -2540
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 568 -1239
R - Q 567 -1245
Q - P 1064 -1689
P - O 776 -1093
Chords Tens.Comp.
N - M 1009 -271
M - L 2334 -1233
L - J 2332 -1227
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 512 -714
D - Q 1040 -1845
D - P 1515 -723
E - P 754 -1458
E - O 1285 -679
Webs Tens.Comp.
O - F 610 -932
F - N 1034 -466
N - G 344 -568
G - M 956 -595
M - I 751 -1016
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.199 I 999 360
VERT(CL):0.381 I 907 240
HORZ(LL):0.076 L - -
HORZ(TL):0.144 L - -
Creep Factor: 2.0
Max TC CSI:0.854
Max BC CSI:0.744
Max Web CSI:0.936
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:176143 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T81 /
DrwNo:193.21.0723.05921
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'10"6
5'11"9
14'11"1
2'0"11
20'6"12
5'7"11
26'10"15
6'4"3
27'11"5
1'0"6
34'6"1
6'6"12
41'10"
7'3"15
6'9"1
6'9"1
12'10"6
6'1"5
14'11"1
2'0"11
20'3"4
5'4"3
25'10"15
5'7"11
28'1"1
2'2"2
34'7"13
6'6"12
41'1"10
6'5"13
41'10"
8"61'
1'
4"12'8"106'6"116'11"68'1"A B
C
D
E F G H
I
J KL
MN
O
PQR
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X5
6X8
5X8
5X5
3X5
3X4
5X6
5X61.5X4
5X12
3X4
1.5X4
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -429# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 186 /-429 /-/233 /285 /302
R 2584 /-/-/1261 /1460 /-
K 861 /-/-/628 /515 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 3.5 Min Req =3.0
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1383 -542
C - D 1836 -853
D - E 1107 -416
E - F 1030 -378
F - G 411 -560
Chords Tens.Comp.
G - H 419 -568
H - I 629 -974
I - J 983 -1780
J - K 1451 -2562
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 592 -1250
S - R 591 -1256
R - Q 1093 -1699
P - O 855 -203
Chords Tens.Comp.
O - N 1535 -626
N - M 2361 -1260
M - K 2353 -1250
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 513 -718
D - R 1033 -1893
D - Q 1552 -708
E - Q 278 -564
Q - F 725 -1227
F - P 1059 -475
Webs Tens.Comp.
P - H 296 -493
H - O 635 -379
O - I 577 -926
I - N 649 -269
N - J 578 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.186 J 999 360
VERT(CL):0.356 J 971 240
HORZ(LL):0.075 M - -
HORZ(TL):0.141 M - -
Creep Factor: 2.0
Max TC CSI:0.860
Max BC CSI:0.888
Max Web CSI:0.961
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:176140 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T19 /
DrwNo:193.21.0723.06328
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'10"6
5'11"9
14'11"1
2'0"11
19'5"
4'5"15
24'0"11
4'7"11
26'10"15
2'10"4
29'9"9
2'10"10
35'6"1
5'8"8
41'10"
6'3"15
6'9"1
6'9"1
12'10"6
6'1"5
15'0"13
2'2"7
23'10"15
8'10"2
26'10"15
3'
30'1"1
3'2"2
35'7"13
5'6"12
41'1"10
5'5"13
41'10"
8"61'
1'
4"1
2'3"106'6"116'11"6(a)
8'1"A B
C
D
E F G H
I
J
K LM
NOP
QRS
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X5
6X8
5X6
5X8
3X4
5X10(SRS)
1.5X4 5X8
3X4
3X4
5X5
3X4
1.5X4
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -429# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 186 /-429 /-/233 /285 /302
R 2584 /-/-/1261 /1460 /-
K 861 /-/-/628 /515 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 3.5 Min Req =3.0
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1383 -542
C - D 1836 -853
D - E 1107 -416
E - F 1030 -378
F - G 411 -560
Chords Tens.Comp.
G - H 419 -568
H - I 629 -974
I - J 983 -1780
J - K 1451 -2562
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 592 -1250
S - R 591 -1256
R - Q 1093 -1699
P - O 855 -203
Chords Tens.Comp.
O - N 1535 -626
N - M 2361 -1260
M - K 2353 -1250
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 513 -718
D - R 1033 -1893
D - Q 1552 -708
E - Q 278 -564
Q - F 725 -1227
F - P 1059 -475
Webs Tens.Comp.
P - H 296 -493
H - O 635 -379
O - I 577 -926
I - N 649 -269
N - J 578 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.186 J 999 360
VERT(CL):0.356 J 971 240
HORZ(LL):0.075 M - -
HORZ(TL):0.141 M - -
Creep Factor: 2.0
Max TC CSI:0.860
Max BC CSI:0.888
Max Web CSI:0.961
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:176140 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T19 /
DrwNo:193.21.0723.06328
SSB /WHK 07/12/2021
12'8"10 29'1"6
6'10"13
6'10"13
12'10"6
5'11"9
14'11"1
2'0"11
19'5"
4'5"15
24'0"11
4'7"11
26'10"15
2'10"4
29'9"9
2'10"10
35'6"1
5'8"8
41'10"
6'3"15
6'9"1
6'9"1
12'10"6
6'1"5
15'0"13
2'2"7
23'10"15
8'10"2
26'10"15
3'
30'1"1
3'2"2
35'7"13
5'6"12
41'1"10
5'5"13
41'10"
8"61'
1'
4"1
2'3"106'6"116'11"6(a)
8'1"A B
C
D
E F G H
I
J
K LM
NOP
QRS
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X5
6X8
5X6
5X8
3X4
5X10(SRS)
1.5X4 5X8
3X4
3X4
5X5
3X4
1.5X4
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -311# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 277 /-311 /-/227 /213 /266
R 2351 /-/-/1135 /1350 /-
J 940 /-/-/660 /562 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 7.6 Min Req =1.9
J Brg Width = 7.6 Min Req =1.5
Bearings B, R, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1151 -409
C - D 1335 -620
D - E 1173 -489
E - F 549 -768
Chords Tens.Comp.
F - G 563 -783
G - H 967 -1569
H - I 1391 -2439
I - J 1655 -2881
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 502 -1036
Q - P 1002 -2081
O - N 1426 -586
Chords Tens.Comp.
N - M 2142 -1033
M - L 2665 -1463
L - J 2646 -1447
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 414 -561
P - D 502 -767
P - E 803 -1390
E - O 1344 -665
O - G 412 -721
Webs Tens.Comp.
N - H 568 -912
G - N 640 -294
H - M 683 -328
M - I 359 -384
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.232 M 999 360
VERT(CL):0.430 M 815 240
HORZ(LL):0.098 L - -
HORZ(TL):0.182 L - -
Creep Factor: 2.0
Max TC CSI:0.805
Max BC CSI:0.938
Max Web CSI:0.711
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T23
Ply: 1
Qty:1
SEQN:176137 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T53 /
DrwNo:193.21.0723.06390
SSB /WHK 07/12/2021
B1
12'5"13 29'4"3
6'10"13
6'10"13
12'11"1
6'0"4
17'5"
4'5"15
22'0"11
4'7"11
28'10"15
6'10"4
31'9"9
2'10"10
36'6"1
4'8"8
41'10"
5'3"15
6'9"1
6'9"1
12'10"6
6'1"5
21'10"15
9'0"9
28'10"15
7'
32'1"1
3'2"2
36'7"13
4'6"12
41'1"10
4'5"13
41'10"
8"61'
1'
4"1
1'10"105'8"116'1"6(a)
8'1"A B
C
D E F G
H
I
J KL
MNO
PQR
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X12
5X6 4X4
5X10(SRS)
1.5X4 5X8
3X4
3X4
5X5
3X4
1.5X4
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -311# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 277 /-311 /-/227 /213 /266
R 2351 /-/-/1135 /1350 /-
J 940 /-/-/660 /562 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 7.6 Min Req =1.9
J Brg Width = 7.6 Min Req =1.5
Bearings B, R, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1151 -409
C - D 1335 -620
D - E 1173 -489
E - F 549 -768
Chords Tens.Comp.
F - G 563 -783
G - H 967 -1569
H - I 1391 -2439
I - J 1655 -2881
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 502 -1036
Q - P 1002 -2081
O - N 1426 -586
Chords Tens.Comp.
N - M 2142 -1033
M - L 2665 -1463
L - J 2646 -1447
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 414 -561
P - D 502 -767
P - E 803 -1390
E - O 1344 -665
O - G 412 -721
Webs Tens.Comp.
N - H 568 -912
G - N 640 -294
H - M 683 -328
M - I 359 -384
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.232 M 999 360
VERT(CL):0.430 M 815 240
HORZ(LL):0.098 L - -
HORZ(TL):0.182 L - -
Creep Factor: 2.0
Max TC CSI:0.805
Max BC CSI:0.938
Max Web CSI:0.711
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T23
Ply: 1
Qty:1
SEQN:176137 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T53 /
DrwNo:193.21.0723.06390
SSB /WHK 07/12/2021
B1
12'5"13 29'4"3
6'10"13
6'10"13
12'11"1
6'0"4
17'5"
4'5"15
22'0"11
4'7"11
28'10"15
6'10"4
31'9"9
2'10"10
36'6"1
4'8"8
41'10"
5'3"15
6'9"1
6'9"1
12'10"6
6'1"5
21'10"15
9'0"9
28'10"15
7'
32'1"1
3'2"2
36'7"13
4'6"12
41'1"10
4'5"13
41'10"
8"61'
1'
4"1
1'10"105'8"116'1"6(a)
8'1"A B
C
D E F G
H
I
J KL
MNO
PQR
5
12
2.5
12
3X5(A1)1.5X4
3X4
5X12
5X6 4X4
5X10(SRS)
1.5X4 5X8
3X4
3X4
5X5
3X4
1.5X4
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -416# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 206 /-416 /-/200 /240 /262
U 2521 /-/-/1236 /1435 /-
K 894 /-/-/625 /535 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 7.6 Min Req =2.1
K Brg Width = 7.6 Min Req =1.5
Bearings B, U, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1290 -540
C - D 1636 -770
D - E 1653 -750
F - G 595 -830
Chords Tens.Comp.
G - H 595 -830
H - I 828 -1264
I - J 811 -1311
J - K 1452 -2591
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 626 -1169
T - S 625 -1175
S - R 1894 -3010
R - Q 1072 -1700
Chords Tens.Comp.
P - O 1299 -562
O - N 1298 -563
N - M 2241 -1177
M - K 2375 -1233
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 472 -661
D - R 259 -488
E - R 735 -1106
E - Q 1837 -998
Q - F 662 -952
Webs Tens.Comp.
F - P 912 -499
P - H 342 -622
I - N 786 -483
N - J 785 -1169
J - M 592 -196
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.197 J 999 360
VERT(CL):0.372 J 943 240
HORZ(LL):0.071 M - -
HORZ(TL):0.132 M - -
Creep Factor: 2.0
Max TC CSI:0.825
Max BC CSI:0.720
Max Web CSI:0.950
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:176134 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T40 /
DrwNo:193.21.0723.06125
SSB /WHK 07/12/2021
B1
12'5"13 29'4"3
5'11"3
5'11"3
10'11"1
4'11"15
12'10"6
1'11"5
20'2"7
7'4"1
23'8"
3'5"9
27'5"1
3'9"1
29'2"
1'8"15
33'9"9
4'7"9
41'10"
8'0"7
5'9"7
5'9"7
10'11"1
5'1"11
12'10"6
1'11"5
19'10"15
7'0"9
23'8"
3'9"1
27'3"5
3'7"5
29'2"
1'10"11
34'1"1
4'11"1
41'1"10
7'0"9
41'10"
8"61'
1'
4"14'10"111'5"105'7"66'0"2(a)
8'1"A B
C
D E F G H
I
J
K LMNOPQ
RSTU
5 12
2.5
12
3X5(A1)
1.5X4
3X4
5X8
3X4
4X5
6X8
5X6
3X4 1.5X4
3X8 1.5X4
5X10(SRS)
5X6
3X8
3X4
5X5
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B1 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -416# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 206 /-416 /-/200 /240 /262
U 2521 /-/-/1236 /1435 /-
K 894 /-/-/625 /535 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 7.6 Min Req =2.1
K Brg Width = 7.6 Min Req =1.5
Bearings B, U, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1290 -540
C - D 1636 -770
D - E 1653 -750
F - G 595 -830
Chords Tens.Comp.
G - H 595 -830
H - I 828 -1264
I - J 811 -1311
J - K 1452 -2591
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 626 -1169
T - S 625 -1175
S - R 1894 -3010
R - Q 1072 -1700
Chords Tens.Comp.
P - O 1299 -562
O - N 1298 -563
N - M 2241 -1177
M - K 2375 -1233
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 472 -661
D - R 259 -488
E - R 735 -1106
E - Q 1837 -998
Q - F 662 -952
Webs Tens.Comp.
F - P 912 -499
P - H 342 -622
I - N 786 -483
N - J 785 -1169
J - M 592 -196
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.197 J 999 360
VERT(CL):0.372 J 943 240
HORZ(LL):0.071 M - -
HORZ(TL):0.132 M - -
Creep Factor: 2.0
Max TC CSI:0.825
Max BC CSI:0.720
Max Web CSI:0.950
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:176134 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T40 /
DrwNo:193.21.0723.06125
SSB /WHK 07/12/2021
B1
12'5"13 29'4"3
5'11"3
5'11"3
10'11"1
4'11"15
12'10"6
1'11"5
20'2"7
7'4"1
23'8"
3'5"9
27'5"1
3'9"1
29'2"
1'8"15
33'9"9
4'7"9
41'10"
8'0"7
5'9"7
5'9"7
10'11"1
5'1"11
12'10"6
1'11"5
19'10"15
7'0"9
23'8"
3'9"1
27'3"5
3'7"5
29'2"
1'10"11
34'1"1
4'11"1
41'1"10
7'0"9
41'10"
8"61'
1'
4"14'10"111'5"105'7"66'0"2(a)
8'1"A B
C
D E F G H
I
J
K LMNOPQ
RSTU
5 12
2.5
12
3X5(A1)
1.5X4
3X4
5X8
3X4
4X5
6X8
5X6
3X4 1.5X4
3X8 1.5X4
5X10(SRS)
5X6
3X8
3X4
5X5
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -301# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 274 /-301 /-/184 /164 /262
R 2407 /-/-/1172 /1399 /-
K 886 /-/-/603 /521 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 10.8 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1049 -329
C - D 1186 -534
D - E 2067 -1056
E - F 781 -360
F - G 343 -467
Chords Tens.Comp.
G - H 343 -467
H - I 731 -1176
I - J 711 -1218
J - K 1508 -2711
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 428 -938
S - R 691 -1093
R - Q 1302 -2069
Q - P 531 -669
Chords Tens.Comp.
P - O 1208 -509
O - N 1206 -511
N - M 2350 -1254
M - K 2493 -1309
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 392 -407
D - S 426 -139
D - R 797 -1460
R - E 690 -1054
E - Q 1481 -780
Q - F 689 -1053
Webs Tens.Comp.
F - P 1342 -771
P - H 535 -930
I - N 545 -244
N - J 883 -1318
J - M 581 -184
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.198 J 999 360
VERT(CL):0.377 J 905 240
HORZ(LL):0.065 M - -
HORZ(TL):0.121 M - -
Creep Factor: 2.0
Max TC CSI:0.724
Max BC CSI:0.989
Max Web CSI:0.775
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T25
Ply: 1
Qty:1
SEQN:176131 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T50 /
DrwNo:193.21.0723.06406
SSB /WHK 07/12/2021
13'4"5 28'5"11
4'9"7
4'9"7
8'11"1
4'1"11
13'4"12
4'5"11
18'2"7
4'9"11
21'8"
3'5"9
25'5"1
3'9"1
29'2"
3'8"15
35'9"9
6'7"9
41'10"
6'0"7
8'11"1
8'11"1
13'4"12
4'5"11
17'10"15
4'6"3
21'8"
3'9"1
25'3"5
3'7"5
29'2"
3'10"11
36'1"1
6'11"1
41'1"10
5'0"9
41'10"
8"61'
1'
4"14'0"111"5
1'0"105'7"66'0"2(a)
8'1"A B
C
D E F G H
I
J
K LMNOPQ
RS
5
12
2.5
12
3X5(A1)
1.5X4
5X8
3X4 4X7
4X4
5X6
4X4 1.5X4
3X10 5X6
5X10(SRS)
5X6
4X7
3X4
5X5
3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -301# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 274 /-301 /-/184 /164 /262
R 2407 /-/-/1172 /1399 /-
K 886 /-/-/603 /521 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 10.8 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1049 -329
C - D 1186 -534
D - E 2067 -1056
E - F 781 -360
F - G 343 -467
Chords Tens.Comp.
G - H 343 -467
H - I 731 -1176
I - J 711 -1218
J - K 1508 -2711
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 428 -938
S - R 691 -1093
R - Q 1302 -2069
Q - P 531 -669
Chords Tens.Comp.
P - O 1208 -509
O - N 1206 -511
N - M 2350 -1254
M - K 2493 -1309
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 392 -407
D - S 426 -139
D - R 797 -1460
R - E 690 -1054
E - Q 1481 -780
Q - F 689 -1053
Webs Tens.Comp.
F - P 1342 -771
P - H 535 -930
I - N 545 -244
N - J 883 -1318
J - M 581 -184
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.198 J 999 360
VERT(CL):0.377 J 905 240
HORZ(LL):0.065 M - -
HORZ(TL):0.121 M - -
Creep Factor: 2.0
Max TC CSI:0.724
Max BC CSI:0.989
Max Web CSI:0.775
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T25
Ply: 1
Qty:1
SEQN:176131 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T50 /
DrwNo:193.21.0723.06406
SSB /WHK 07/12/2021
13'4"5 28'5"11
4'9"7
4'9"7
8'11"1
4'1"11
13'4"12
4'5"11
18'2"7
4'9"11
21'8"
3'5"9
25'5"1
3'9"1
29'2"
3'8"15
35'9"9
6'7"9
41'10"
6'0"7
8'11"1
8'11"1
13'4"12
4'5"11
17'10"15
4'6"3
21'8"
3'9"1
25'3"5
3'7"5
29'2"
3'10"11
36'1"1
6'11"1
41'1"10
5'0"9
41'10"
8"61'
1'
4"14'0"111"5
1'0"105'7"66'0"2(a)
8'1"A B
C
D E F G H
I
J
K LMNOPQ
RS
5
12
2.5
12
3X5(A1)
1.5X4
5X8
3X4 4X7
4X4
5X6
4X4 1.5X4
3X10 5X6
5X10(SRS)
5X6
4X7
3X4
5X5
3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 540 /-/-/341 /282 /262
R 1843 /-/-/937 /1060 /-
K 975 /-/-/637 /580 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 10.8 Min Req =2.2
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 299 -674
D - E 909 -366
E - F 452 -607
F - G 452 -607
Chords Tens.Comp.
G - H 841 -1366
H - I 856 -1356
I - J 1746 -2937
J - K 1654 -2988
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 565 -266
T - S 572 -265
S - R 199 -401
Q - P 604 -982
Chords Tens.Comp.
P - O 1750 -933
O - N 1746 -935
N - M 1707 -909
M - K 2734 -1451
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 328 -576
S - D 411 -155
D - R 547 -976
R - Q 796 -1303
Q - E 744 -1161
E - P 1794 -1001
Webs Tens.Comp.
P - G 771 -1321
G - N 466 -580
H - N 720 -373
N - I 478 -588
I - M 1163 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.177 I 999 360
VERT(CL):0.332 I 959 240
HORZ(LL):0.045 M - -
HORZ(TL):0.084 M - -
Creep Factor: 2.0
Max TC CSI:0.589
Max BC CSI:0.959
Max Web CSI:0.581
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T26
Ply: 1
Qty:1
SEQN:176125 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T51 /
DrwNo:193.21.0723.05360
SSB /WHK 07/12/2021
W5
15'4"5 26'5"11
6'11"1
6'11"1
11'3"10
4'4"9
15'4"12
4'1"1
19'3"2
3'10"7
23'5"1
4'1"15
29'2"
5'8"15
33'7"9
4'5"9
37'11"5
4'3"13
41'10"
3'10"11
7'0"13
7'0"13
11'0"2
3'11"5
15'4"12
4'4"9
19'3"2
3'10"7
23'3"5
4'0"3
29'2"
5'10"11
38'1"1
8'11"1
41'1"10
3'0"9
41'10"
8"6
1'1'
4"13'2"117"105'7"66'0"28'1"A B
C D E F G
H
I
J
K LMNOP
QRST
5 12
2.5
12
3X5(A1)
5X8
1.5X4 3X4
3X4
6X63X3
4X5 1.5X4
3X12 1.5X4
5X10(SRS)
5X6
5X8
3X4
1.5X4
5X12 3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 540 /-/-/341 /282 /262
R 1843 /-/-/937 /1060 /-
K 975 /-/-/637 /580 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
R Brg Width = 10.8 Min Req =2.2
K Brg Width = 7.6 Min Req =1.5
Bearings B, R, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 299 -674
D - E 909 -366
E - F 452 -607
F - G 452 -607
Chords Tens.Comp.
G - H 841 -1366
H - I 856 -1356
I - J 1746 -2937
J - K 1654 -2988
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 565 -266
T - S 572 -265
S - R 199 -401
Q - P 604 -982
Chords Tens.Comp.
P - O 1750 -933
O - N 1746 -935
N - M 1707 -909
M - K 2734 -1451
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 328 -576
S - D 411 -155
D - R 547 -976
R - Q 796 -1303
Q - E 744 -1161
E - P 1794 -1001
Webs Tens.Comp.
P - G 771 -1321
G - N 466 -580
H - N 720 -373
N - I 478 -588
I - M 1163 -636
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.18 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.177 I 999 360
VERT(CL):0.332 I 959 240
HORZ(LL):0.045 M - -
HORZ(TL):0.084 M - -
Creep Factor: 2.0
Max TC CSI:0.589
Max BC CSI:0.959
Max Web CSI:0.581
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T26
Ply: 1
Qty:1
SEQN:176125 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T51 /
DrwNo:193.21.0723.05360
SSB /WHK 07/12/2021
W5
15'4"5 26'5"11
6'11"1
6'11"1
11'3"10
4'4"9
15'4"12
4'1"1
19'3"2
3'10"7
23'5"1
4'1"15
29'2"
5'8"15
33'7"9
4'5"9
37'11"5
4'3"13
41'10"
3'10"11
7'0"13
7'0"13
11'0"2
3'11"5
15'4"12
4'4"9
19'3"2
3'10"7
23'3"5
4'0"3
29'2"
5'10"11
38'1"1
8'11"1
41'1"10
3'0"9
41'10"
8"6
1'1'
4"13'2"117"105'7"66'0"28'1"A B
C D E F G
H
I
J
K LMNOP
QRST
5 12
2.5
12
3X5(A1)
5X8
1.5X4 3X4
3X4
6X63X3
4X5 1.5X4
3X12 1.5X4
5X10(SRS)
5X6
5X8
3X4
1.5X4
5X12 3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 932 /-/-/450 /556 /227
G 1001 /-/-/579 /585 /-
Wind reactions based on MWFRS
N Brg Width = 3.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings N & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 999 -1796
B - C 1195 -2068
C - D 821 -1291
Chords Tens.Comp.
D - E 812 -1314
E - F 1104 -1918
F - G 1433 -2516
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1466 -717
K - J 1717 -884
Chords Tens.Comp.
J - I 2172 -1239
I - G 2265 -1252
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 559 -904
A - L 2009 -1148
M - N 545 -930
L - B 683 -1015
L - C 542 -252
Webs Tens.Comp.
C - K 336 -414
D - K 718 -390
K - E 475 -637
J - F 357 -442
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.117 E 999 360
VERT(CL):0.217 E 999 240
HORZ(LL):0.049 I - -
HORZ(TL):0.091 I - -
Creep Factor: 2.0
Max TC CSI:0.454
Max BC CSI:0.809
Max Web CSI:0.453
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T27
Ply: 1
Qty:1
SEQN:176121 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T37 /
DrwNo:193.21.0723.05018
SSB /WHK 07/12/2021
24'11"15
4'7"
4'7"
8'5"7
3'10"7
12'3"15
3'10"7
17'7"12
5'3"13
24'11"15
7'4"3
3"8
3"8
4'5"4
4'1"12
12'3"15
7'10"11
17'11"4
5'7"5
23'3"
5'3"13
24'3"9
1'0"9
24'11"15
8"6
1'2'4"114"12"105'7"66'0"28'1"
A B
C
D
E
F
G
HIJKLM
N
5
12
2.5
12
4X6
3X3 4X10
5X5
3X4
4X4
5X8
3X4
3X4
3X4
5X5 3X5(F1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
N 932 /-/-/450 /556 /227
G 1001 /-/-/579 /585 /-
Wind reactions based on MWFRS
N Brg Width = 3.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings N & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 999 -1796
B - C 1195 -2068
C - D 821 -1291
Chords Tens.Comp.
D - E 812 -1314
E - F 1104 -1918
F - G 1433 -2516
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - K 1466 -717
K - J 1717 -884
Chords Tens.Comp.
J - I 2172 -1239
I - G 2265 -1252
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 559 -904
A - L 2009 -1148
M - N 545 -930
L - B 683 -1015
L - C 542 -252
Webs Tens.Comp.
C - K 336 -414
D - K 718 -390
K - E 475 -637
J - F 357 -442
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.117 E 999 360
VERT(CL):0.217 E 999 240
HORZ(LL):0.049 I - -
HORZ(TL):0.091 I - -
Creep Factor: 2.0
Max TC CSI:0.454
Max BC CSI:0.809
Max Web CSI:0.453
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T27
Ply: 1
Qty:1
SEQN:176121 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T37 /
DrwNo:193.21.0723.05018
SSB /WHK 07/12/2021
24'11"15
4'7"
4'7"
8'5"7
3'10"7
12'3"15
3'10"7
17'7"12
5'3"13
24'11"15
7'4"3
3"8
3"8
4'5"4
4'1"12
12'3"15
7'10"11
17'11"4
5'7"5
23'3"
5'3"13
24'3"9
1'0"9
24'11"15
8"6
1'2'4"114"12"105'7"66'0"28'1"
A B
C
D
E
F
G
HIJKLM
N
5
12
2.5
12
4X6
3X3 4X10
5X5
3X4
4X4
5X8
3X4
3X4
3X4
5X5 3X5(F1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 945 /-/-/473 /552 /222
F 1019 /-/-/594 /595 /-
Wind reactions based on MWFRS
L Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings L & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1001 -1726
B - C 1104 -1878
C - D 831 -1315
Chords Tens.Comp.
D - E 834 -1318
E - F 1094 -1893
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1910 -1027
J - I 1693 -884
Chords Tens.Comp.
I - H 1687 -895
H - F 1691 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 549 -904
A - K 1901 -1102
K - B 532 -813
Webs Tens.Comp.
C - I 433 -595
D - I 639 -331
I - E 445 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.094 I 999 360
VERT(CL):0.175 I 999 240
HORZ(LL):0.034 H - -
HORZ(TL):0.062 H - -
Creep Factor: 2.0
Max TC CSI:0.487
Max BC CSI:0.518
Max Web CSI:0.449
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:176065 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T33 /
DrwNo:193.21.0723.05593
SSB /WHK 07/12/2021
25'4"
2'11"1
2'11"1
6'9"10
3'10"9
12'8"
5'10"6
18'6"6
5'10"6
25'4"
6'9"10
2'7"1
2'7"1
6'6"2
3'11"1
12'8"
6'1"14
18'8"2
6'0"2
25'4"
6'7"14 1'1'6"114"15'7"66'0"28'1"
A B
C
D
E
F
G
HIJKL
5
12
3X8
1.5X6 3X8
5X5
3X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 945 /-/-/473 /552 /222
F 1019 /-/-/594 /595 /-
Wind reactions based on MWFRS
L Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings L & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1001 -1726
B - C 1104 -1878
C - D 831 -1315
Chords Tens.Comp.
D - E 834 -1318
E - F 1094 -1893
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1910 -1027
J - I 1693 -884
Chords Tens.Comp.
I - H 1687 -895
H - F 1691 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - L 549 -904
A - K 1901 -1102
K - B 532 -813
Webs Tens.Comp.
C - I 433 -595
D - I 639 -331
I - E 445 -588
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.094 I 999 360
VERT(CL):0.175 I 999 240
HORZ(LL):0.034 H - -
HORZ(TL):0.062 H - -
Creep Factor: 2.0
Max TC CSI:0.487
Max BC CSI:0.518
Max Web CSI:0.449
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:176065 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T33 /
DrwNo:193.21.0723.05593
SSB /WHK 07/12/2021
25'4"
2'11"1
2'11"1
6'9"10
3'10"9
12'8"
5'10"6
18'6"6
5'10"6
25'4"
6'9"10
2'7"1
2'7"1
6'6"2
3'11"1
12'8"
6'1"14
18'8"2
6'0"2
25'4"
6'7"14 1'1'6"114"15'7"66'0"28'1"
A B
C
D
E
F
G
HIJKL
5
12
3X8
1.5X6 3X8
5X5
3X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/588 /593 /236
F 1012 /-/-/588 /593 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1093 -1881
C - D 827 -1300
Chords Tens.Comp.
D - E 827 -1300
E - F 1093 -1881
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1681 -894
J - I 1677 -895
Chords Tens.Comp.
I - H 1677 -895
H - F 1681 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 450 -594
D - I 629 -333
Webs Tens.Comp.
I - E 450 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.090 I 999 360
VERT(CL):0.167 I 999 240
HORZ(LL):0.036 H - -
HORZ(TL):0.066 H - -
Creep Factor: 2.0
Max TC CSI:0.485
Max BC CSI:0.508
Max Web CSI:0.456
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T29
Ply: 1
Qty:4
SEQN:176068 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T22 /
DrwNo:193.21.0723.05017
SSB /WHK 07/12/2021
25'4"
6'8"12
6'8"12
12'8"
5'11"4
18'7"4
5'11"4
25'4"
6'8"12
6'7"
6'7"
12'8"
6'1"
18'9"
6'1"
25'4"
6'7"1'1'
4"15'7"66'0"28'1"A
B
C
D
E
F
G
HIJ
5
12
3X4(A1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/588 /593 /236
F 1012 /-/-/588 /593 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1093 -1881
C - D 827 -1300
Chords Tens.Comp.
D - E 827 -1300
E - F 1093 -1881
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1681 -894
J - I 1677 -895
Chords Tens.Comp.
I - H 1677 -895
H - F 1681 -894
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 450 -594
D - I 629 -333
Webs Tens.Comp.
I - E 450 -594
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.090 I 999 360
VERT(CL):0.167 I 999 240
HORZ(LL):0.036 H - -
HORZ(TL):0.066 H - -
Creep Factor: 2.0
Max TC CSI:0.485
Max BC CSI:0.508
Max Web CSI:0.456
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T29
Ply: 1
Qty:4
SEQN:176068 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T22 /
DrwNo:193.21.0723.05017
SSB /WHK 07/12/2021
25'4"
6'8"12
6'8"12
12'8"
5'11"4
18'7"4
5'11"4
25'4"
6'8"12
6'7"
6'7"
12'8"
6'1"
18'9"
6'1"
25'4"
6'7"1'1'
4"15'7"66'0"28'1"A
B
C
D
E
F
G
HIJ
5
12
3X4(A1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 951 /-/-/522 /551 /222
E 1013 /-/-/587 /594 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1102 -1895
B - C 830 -1304
Chords Tens.Comp.
C - D 830 -1303
D - E 1095 -1885
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1695 -904
I - H 1691 -905
Chords Tens.Comp.
H - G 1681 -898
G - E 1685 -897
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 458 -606
C - H 633 -336
Webs Tens.Comp.
H - D 450 -595
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 H 999 360
VERT(CL):0.166 H 999 240
HORZ(LL):0.036 G - -
HORZ(TL):0.066 G - -
Creep Factor: 2.0
Max TC CSI:0.494
Max BC CSI:0.529
Max Web CSI:0.465
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T29A
Ply: 1
Qty:1
SEQN:176071 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T30 /
DrwNo:193.21.0723.05657
SSB /WHK 07/12/2021
25'4"
6'8"12
6'8"12
12'8"
5'11"4
18'7"4
5'11"4
25'4"
6'8"12
6'7"
6'7"
12'8"
6'1"
18'9"
6'1"
25'4"
6'7"1'
4"15'7"66'0"28'1"
A
B
C
D
E
F
GHI
5 12
3X4(A1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 951 /-/-/522 /551 /222
E 1013 /-/-/587 /594 /-
Wind reactions based on MWFRS
A Brg Width = 7.6 Min Req =1.5
E Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1102 -1895
B - C 830 -1304
Chords Tens.Comp.
C - D 830 -1303
D - E 1095 -1885
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1695 -904
I - H 1691 -905
Chords Tens.Comp.
H - G 1681 -898
G - E 1685 -897
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 458 -606
C - H 633 -336
Webs Tens.Comp.
H - D 450 -595
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.089 H 999 360
VERT(CL):0.166 H 999 240
HORZ(LL):0.036 G - -
HORZ(TL):0.066 G - -
Creep Factor: 2.0
Max TC CSI:0.494
Max BC CSI:0.529
Max Web CSI:0.465
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T29A
Ply: 1
Qty:1
SEQN:176071 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T30 /
DrwNo:193.21.0723.05657
SSB /WHK 07/12/2021
25'4"
6'8"12
6'8"12
12'8"
5'11"4
18'7"4
5'11"4
25'4"
6'8"12
6'7"
6'7"
12'8"
6'1"
18'9"
6'1"
25'4"
6'7"1'
4"15'7"66'0"28'1"
A
B
C
D
E
F
GHI
5 12
3X4(A1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/592 /593 /224
G 1012 /-/-/592 /593 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1088 -1874
C - D 830 -1301
D - E 839 -1189
Chords Tens.Comp.
E - F 830 -1301
F - G 1088 -1874
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1673 -888
K - J 1669 -890
Chords Tens.Comp.
J - I 1669 -890
I - G 1673 -888
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 438 -584
Webs Tens.Comp.
J - F 438 -584
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 J 999 360
VERT(CL):0.162 J 999 240
HORZ(LL):0.036 I - -
HORZ(TL):0.066 I - -
Creep Factor: 2.0
Max TC CSI:0.480
Max BC CSI:0.516
Max Web CSI:0.419
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:176075 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T82 /
DrwNo:193.21.0723.05437
SSB /WHK 07/12/2021
25'4"
6'9"10
6'9"10
11'11"1
5'1"7
13'4"15
1'5"14
18'6"6
5'1"7
25'4"
6'9"10
6'7"14
6'7"14
12'8"
6'0"2
18'8"2
6'0"2
25'4"
6'7"141'1'
4"15'3"115'8"68'1"A
B
C
D E
F
G
H
IJK
5
12
3X4(A1)1.5X4
3X4
4X4
5X10
4X4
3X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/592 /593 /224
G 1012 /-/-/592 /593 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1088 -1874
C - D 830 -1301
D - E 839 -1189
Chords Tens.Comp.
E - F 830 -1301
F - G 1088 -1874
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1673 -888
K - J 1669 -890
Chords Tens.Comp.
J - I 1669 -890
I - G 1673 -888
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 438 -584
Webs Tens.Comp.
J - F 438 -584
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 J 999 360
VERT(CL):0.162 J 999 240
HORZ(LL):0.036 I - -
HORZ(TL):0.066 I - -
Creep Factor: 2.0
Max TC CSI:0.480
Max BC CSI:0.516
Max Web CSI:0.419
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:176075 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T82 /
DrwNo:193.21.0723.05437
SSB /WHK 07/12/2021
25'4"
6'9"10
6'9"10
11'11"1
5'1"7
13'4"15
1'5"14
18'6"6
5'1"7
25'4"
6'9"10
6'7"14
6'7"14
12'8"
6'0"2
18'8"2
6'0"2
25'4"
6'7"141'1'
4"15'3"115'8"68'1"A
B
C
D E
F
G
H
IJK
5
12
3X4(A1)1.5X4
3X4
4X4
5X10
4X4
3X4
1.5X4 3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/597 /595 /192
G 1012 /-/-/597 /595 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1162 -1882
C - D 939 -1555
D - E 931 -1369
Chords Tens.Comp.
E - F 939 -1555
F - G 1162 -1882
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1698 -972
K - J 1389 -651
Chords Tens.Comp.
J - I 1389 -651
I - G 1698 -972
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - K 442 -74
Webs Tens.Comp.
E - I 442 -74
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 J 999 360
VERT(CL):0.163 J 999 240
HORZ(LL):0.035 I - -
HORZ(TL):0.064 I - -
Creep Factor: 2.0
Max TC CSI:0.353
Max BC CSI:0.862
Max Web CSI:0.169
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:176044 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T39 /
DrwNo:193.21.0723.05954
SSB /WHK 07/12/2021
25'4"
5'3"6
5'3"6
9'11"1
4'7"10
15'4"15
5'5"14
20'0"9
4'7"10
25'4"
5'3"7
9'11"1
9'11"1
12'8"
2'8"15
15'4"15
2'8"15
25'4"
9'11"11'1'
4"14'5"114'10"68'1"A
B
C
D E
F
G
H
IJK
5
12
3X4(A1)
1.5X4
4X7
3X4 5X5
4X7
3X4
1.5X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/597 /595 /192
G 1012 /-/-/597 /595 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 7.6 Min Req =1.5
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1162 -1882
C - D 939 -1555
D - E 931 -1369
Chords Tens.Comp.
E - F 939 -1555
F - G 1162 -1882
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1698 -972
K - J 1389 -651
Chords Tens.Comp.
J - I 1389 -651
I - G 1698 -972
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - K 442 -74
Webs Tens.Comp.
E - I 442 -74
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 J 999 360
VERT(CL):0.163 J 999 240
HORZ(LL):0.035 I - -
HORZ(TL):0.064 I - -
Creep Factor: 2.0
Max TC CSI:0.353
Max BC CSI:0.862
Max Web CSI:0.169
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:176044 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T39 /
DrwNo:193.21.0723.05954
SSB /WHK 07/12/2021
25'4"
5'3"6
5'3"6
9'11"1
4'7"10
15'4"15
5'5"14
20'0"9
4'7"10
25'4"
5'3"7
9'11"1
9'11"1
12'8"
2'8"15
15'4"15
2'8"15
25'4"
9'11"11'1'
4"14'5"114'10"68'1"A
B
C
D E
F
G
H
IJK
5
12
3X4(A1)
1.5X4
4X7
3X4 5X5
4X7
3X4
1.5X4
3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/596 /596 /160
F 1012 /-/-/596 /596 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1046 -1794
C - D 1131 -1758
Chords Tens.Comp.
D - E 1131 -1758
E - F 1046 -1794
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1587 -830
J - I 1595 -829
Chords Tens.Comp.
I - H 1595 -829
H - F 1587 -830
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.095 D 999 360
VERT(CL):0.175 D 999 240
HORZ(LL):0.033 H - -
HORZ(TL):0.061 H - -
Creep Factor: 2.0
Max TC CSI:0.758
Max BC CSI:0.661
Max Web CSI:0.116
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:176040 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T11 /
DrwNo:193.21.0723.06031
SSB /WHK 07/12/2021
25'4"
7'11"1
7'11"1
12'8"
4'8"15
17'4"15
4'8"15
25'4"
7'11"1
8'0"13
8'0"13
12'8"
4'7"3
17'3"3
4'7"3
25'4"
8'0"131'1'
4"13'7"114'0"68'1"A
B
C D E
F
G
HIJ
5
12
3X4(A1)
4X8
1.5X4
1.5X4
5X8 1.5X4
4X8
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1012 /-/-/596 /596 /160
F 1012 /-/-/596 /596 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 7.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1046 -1794
C - D 1131 -1758
Chords Tens.Comp.
D - E 1131 -1758
E - F 1046 -1794
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 1587 -830
J - I 1595 -829
Chords Tens.Comp.
I - H 1595 -829
H - F 1587 -830
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.095 D 999 360
VERT(CL):0.175 D 999 240
HORZ(LL):0.033 H - -
HORZ(TL):0.061 H - -
Creep Factor: 2.0
Max TC CSI:0.758
Max BC CSI:0.661
Max Web CSI:0.116
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:176040 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T11 /
DrwNo:193.21.0723.06031
SSB /WHK 07/12/2021
25'4"
7'11"1
7'11"1
12'8"
4'8"15
17'4"15
4'8"15
25'4"
7'11"1
8'0"13
8'0"13
12'8"
4'7"3
17'3"3
4'7"3
25'4"
8'0"131'1'
4"13'7"114'0"68'1"A
B
C D E
F
G
HIJ
5
12
3X4(A1)
4X8
1.5X4
1.5X4
5X8 1.5X4
4X8
3X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2700f-2.2E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 5.92
TC: From 28 plf at 5.92 to 28 plf at 19.41
TC: From 55 plf at 19.41 to 55 plf at 26.33
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.95
BC: From 10 plf at 5.95 to 10 plf at 19.38
BC: From 20 plf at 19.38 to 20 plf at 25.33
BC: From 4 plf at 25.33 to 4 plf at 26.33
TC: 428 lb Conc. Load at 5.95,19.38
TC: 141 lb Conc. Load at 7.35, 9.35,11.35,13.35
15.35,17.35
BC: 228 lb Conc. Load at 5.95,19.38
BC: 106 lb Conc. Load at 7.35, 9.35,11.35,13.35
15.35,17.35
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2175 /-/-/-/1328 /-
F 2137 /-/-/-/1304 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.8
F Brg Width = 7.6 Min Req =1.8
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2930 -4833
C - D 3647 -5991
Chords Tens.Comp.
D - E 3646 -5991
E - F 2868 -4733
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 4404 -2654
J - I 4429 -2649
Chords Tens.Comp.
I - H 4334 -2592
H - F 4311 -2597
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 429 0
C - I 1666 -1063
D - I 769 -734
Webs Tens.Comp.
I - E 1767 -1125
H - E 398 0
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.306 D 981 360
VERT(CL):0.555 D 541 240
HORZ(LL):-0.071 H - -
HORZ(TL):0.130 H - -
Creep Factor: 2.0
Max TC CSI:0.821
Max BC CSI:0.683
Max Web CSI:0.956
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:176036 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T34 /
DrwNo:193.21.0723.06609
SSB /WHK 07/12/2021
T2
25'4"
5'11"1
5'11"1
12'8"
6'8"15
19'4"15
6'8"15
25'4"
5'11"1
6'0"13
6'0"13
12'8"
6'7"3
19'3"3
6'7"3
25'4"
6'0"131'1'
4"12'9"113'2"68'1"A
B
C D E
F
G
HIJ
5
12
4X8(A2)
5X12
1.5X4
1.5X6
H0510 1.5X4
5X12
4X8(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2700f-2.2E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 5.92
TC: From 28 plf at 5.92 to 28 plf at 19.41
TC: From 55 plf at 19.41 to 55 plf at 26.33
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 5.95
BC: From 10 plf at 5.95 to 10 plf at 19.38
BC: From 20 plf at 19.38 to 20 plf at 25.33
BC: From 4 plf at 25.33 to 4 plf at 26.33
TC: 428 lb Conc. Load at 5.95,19.38
TC: 141 lb Conc. Load at 7.35, 9.35,11.35,13.35
15.35,17.35
BC: 228 lb Conc. Load at 5.95,19.38
BC: 106 lb Conc. Load at 7.35, 9.35,11.35,13.35
15.35,17.35
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 2175 /-/-/-/1328 /-
F 2137 /-/-/-/1304 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.8
F Brg Width = 7.6 Min Req =1.8
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2930 -4833
C - D 3647 -5991
Chords Tens.Comp.
D - E 3646 -5991
E - F 2868 -4733
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 4404 -2654
J - I 4429 -2649
Chords Tens.Comp.
I - H 4334 -2592
H - F 4311 -2597
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - J 429 0
C - I 1666 -1063
D - I 769 -734
Webs Tens.Comp.
I - E 1767 -1125
H - E 398 0
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.306 D 981 360
VERT(CL):0.555 D 541 240
HORZ(LL):-0.071 H - -
HORZ(TL):0.130 H - -
Creep Factor: 2.0
Max TC CSI:0.821
Max BC CSI:0.683
Max Web CSI:0.956
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:176036 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T34 /
DrwNo:193.21.0723.06609
SSB /WHK 07/12/2021
T2
25'4"
5'11"1
5'11"1
12'8"
6'8"15
19'4"15
6'8"15
25'4"
5'11"1
6'0"13
6'0"13
12'8"
6'7"3
19'3"3
6'7"3
25'4"
6'0"131'1'
4"12'9"113'2"68'1"A
B
C D E
F
G
HIJ
5
12
4X8(A2)
5X12
1.5X4
1.5X6
H0510 1.5X4
5X12
4X8(A2)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.92
TC: From 28 plf at 4.92 to 28 plf at 16.80
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.95
BC: From 10 plf at 4.95 to 10 plf at 16.80
TC: 307 lb Conc. Load at 4.95
TC: 115 lb Conc. Load at 6.98, 8.98,10.98,12.98
14.98,16.44
BC: 175 lb Conc. Load at 4.95
BC: 87 lb Conc. Load at 6.98, 8.98,10.98,12.98
14.98,16.44
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1240 /-/-/-/763 /-
G 1332 /-/-/-/813 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.6 Min Req =1.6
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1510 -2492
C - D 1366 -2320
Chords Tens.Comp.
D - E 1300 -2296
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2249 -1346
I - H 2582 -1619
Chords Tens.Comp.
H - G 1526 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 507 -141
D - H 397 -356
Webs Tens.Comp.
H - E 959 -360
E - G 1216 -1818
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.094 D 999 360
VERT(CL):0.170 D 999 240
HORZ(LL):-0.032 G - -
HORZ(TL):0.057 G - -
Creep Factor: 2.0
Max TC CSI:0.762
Max BC CSI:0.954
Max Web CSI:0.439
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T34
Ply: 1
Qty:1
SEQN:176052 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T28 /
DrwNo:193.21.0723.05002
SSB /WHK 07/12/2021
16'9"9
4'11"1
4'11"1
8'0"7
3'1"6
13'8"3
5'7"12
16'9"9
3'1"6
5'2"9
5'2"9
10'10"5
5'7"12
16'9"9
5'11"41'
4"1 2'4"112'9"68'1"A
B
C D E F
GHI
5
12
4X4(A2)
5X5
3X4
3X4
3X4
4X4 1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.92
TC: From 28 plf at 4.92 to 28 plf at 16.80
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.95
BC: From 10 plf at 4.95 to 10 plf at 16.80
TC: 307 lb Conc. Load at 4.95
TC: 115 lb Conc. Load at 6.98, 8.98,10.98,12.98
14.98,16.44
BC: 175 lb Conc. Load at 4.95
BC: 87 lb Conc. Load at 6.98, 8.98,10.98,12.98
14.98,16.44
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1240 /-/-/-/763 /-
G 1332 /-/-/-/813 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
G Brg Width = 3.6 Min Req =1.6
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1510 -2492
C - D 1366 -2320
Chords Tens.Comp.
D - E 1300 -2296
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2249 -1346
I - H 2582 -1619
Chords Tens.Comp.
H - G 1526 -1011
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 507 -141
D - H 397 -356
Webs Tens.Comp.
H - E 959 -360
E - G 1216 -1818
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.094 D 999 360
VERT(CL):0.170 D 999 240
HORZ(LL):-0.032 G - -
HORZ(TL):0.057 G - -
Creep Factor: 2.0
Max TC CSI:0.762
Max BC CSI:0.954
Max Web CSI:0.439
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T34
Ply: 1
Qty:1
SEQN:176052 /HIPM
FROM:
Cust: R 761 JRef:1X707610001 T28 /
DrwNo:193.21.0723.05002
SSB /WHK 07/12/2021
16'9"9
4'11"1
4'11"1
8'0"7
3'1"6
13'8"3
5'7"12
16'9"9
3'1"6
5'2"9
5'2"9
10'10"5
5'7"12
16'9"9
5'11"41'
4"1 2'4"112'9"68'1"A
B
C D E F
GHI
5
12
4X4(A2)
5X5
3X4
3X4
3X4
4X4 1.5X4
6X6
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 212 /-/-/104 /127 /53
C 296 /-/-/200 /175 /-
Wind reactions based on MWFRS
F Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings F & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 214 -393
Chords Tens.Comp.
B - C 254 -432
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - C 399 -219
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.008 E 999 360
VERT(CL):0.014 E 999 240
HORZ(LL):-0.002 B - -
HORZ(TL):0.003 B - -
Creep Factor: 2.0
Max TC CSI:0.275
Max BC CSI:0.165
Max Web CSI:0.079
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:176047 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T25 /
DrwNo:193.21.0723.05546
SSB /WHK 07/12/2021
5'11"10
4'7"10
4'7"10
5'11"10
1'4"
5'11"10
5'11"10 1'
10"12
4"1 1'3"78'1"
A B
C
D
EF
5
12
4X4
1.5X4(**)3X4
4X4
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 212 /-/-/104 /127 /53
C 296 /-/-/200 /175 /-
Wind reactions based on MWFRS
F Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings F & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 214 -393
Chords Tens.Comp.
B - C 254 -432
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - C 399 -219
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.008 E 999 360
VERT(CL):0.014 E 999 240
HORZ(LL):-0.002 B - -
HORZ(TL):0.003 B - -
Creep Factor: 2.0
Max TC CSI:0.275
Max BC CSI:0.165
Max Web CSI:0.079
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:176047 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T25 /
DrwNo:193.21.0723.05546
SSB /WHK 07/12/2021
5'11"10
4'7"10
4'7"10
5'11"10
1'4"
5'11"10
5'11"10 1'
10"12
4"1 1'3"78'1"
A B
C
D
EF
5
12
4X4
1.5X4(**)3X4
4X4
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 6.97
BC: From 20 plf at 0.00 to 20 plf at 5.97
BC: From 4 plf at 5.97 to 4 plf at 6.97
BC: 1188 lb Conc. Load at 1.91
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 1012 /-/-/-/607 /-
C 685 /-/-/-/430 /-
Wind reactions based on MWFRS
F Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings F & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 725 -1226
Chords Tens.Comp.
B - C 774 -1273
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - C 1150 -691
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 481 -772
Webs Tens.Comp.
A - E 1402 -828
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.014 E 999 360
VERT(CL):0.026 E 999 240
HORZ(LL):-0.004 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.213
Max BC CSI:0.412
Max Web CSI:0.317
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:176087 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T24 /
DrwNo:193.21.0723.05406
SSB /WHK 07/12/2021
5'11"10
2'7"10
2'7"10
5'11"10
3'4"
2'4"2
2'4"2
5'11"10
3'7"8 1'1'8"124"1 2'1"78'1"
A B
C
D
EF
5
124X4
3X8 4X6
4X4
2X5(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at 0.00 to 55 plf at 6.97
BC: From 20 plf at 0.00 to 20 plf at 5.97
BC: From 4 plf at 5.97 to 4 plf at 6.97
BC: 1188 lb Conc. Load at 1.91
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 1012 /-/-/-/607 /-
C 685 /-/-/-/430 /-
Wind reactions based on MWFRS
F Brg Width = 7.6 Min Req =1.5
C Brg Width = 7.6 Min Req =1.5
Bearings F & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 725 -1226
Chords Tens.Comp.
B - C 774 -1273
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - C 1150 -691
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 481 -772
Webs Tens.Comp.
A - E 1402 -828
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.014 E 999 360
VERT(CL):0.026 E 999 240
HORZ(LL):-0.004 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.213
Max BC CSI:0.412
Max Web CSI:0.317
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:176087 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T24 /
DrwNo:193.21.0723.05406
SSB /WHK 07/12/2021
5'11"10
2'7"10
2'7"10
5'11"10
3'4"
2'4"2
2'4"2
5'11"10
3'7"8 1'1'8"124"1 2'1"78'1"
A B
C
D
EF
5
124X4
3X8 4X6
4X4
2X5(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.03
TC: From 73 plf at 4.03 to 73 plf at 13.77
TC: From 28 plf at 13.77 to 28 plf at 14.38
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.03
BC: From 10 plf at 4.03 to 10 plf at 14.38
TC: 212 lb Conc. Load at 4.03
TC: 91 lb Conc. Load at 13.77
PLT: 91 lb Conc. Load at ( 5.77,10.05), (7.77,10.05)
(9.77,10.05), (11.77,10.05)
BC: 124 lb Conc. Load at 4.03
BC: 70 lb Conc. Load at 5.77, 7.77, 9.77,11.77
13.77
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1139 /-/-/-/699 /-
K 1188 /-/-/-/721 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
K Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1371 -2279
C - D 792 -1238
D - E 664 -1105
E - F 648 -1085
Chords Tens.Comp.
F - G 641 -1073
G - H 663 -1103
H - I 724 -1148
I - J 214 -384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2064 -1232
Chords Tens.Comp.
N - M 2079 -1225
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 245 -431
C - M 388 -661
O - P 247 -432
P - Q 249 -434
M - I 1463 -875
Webs Tens.Comp.
F - Q 513 -228
Q - R 249 -434
R - S 248 -434
S - I 241 -425
J - K 406 -751
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.119 H 999 360
VERT(CL):0.206 H 827 240
HORZ(LL):0.038 J - -
HORZ(TL):0.066 J - -
Creep Factor: 2.0
Max TC CSI:0.871
Max BC CSI:0.945
Max Web CSI:0.376
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:176082 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T26 /
DrwNo:193.21.0723.05078
SSB /WHK 07/12/2021
14'4"8
6'3"1'4"
(TYP)
2'7"12
4'9"2
4'9"2
8'11"
4'1"14
13'9"2
4'10"2
14'4"8
7"6
4'1"12
4'1"12
8'11"
4'9"4
13'8"4
4'9"4
14'4"8
8"4
1'
4"1 1'9"64'0"104'5"68'1"A
B
C
D
E
F
G
H I J
KLMN
O P Q R S
5
12
3X5(A1)
5X8
4X4
3X83X10
8X81.5X6
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 4.03
TC: From 73 plf at 4.03 to 73 plf at 13.77
TC: From 28 plf at 13.77 to 28 plf at 14.38
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.03
BC: From 10 plf at 4.03 to 10 plf at 14.38
TC: 212 lb Conc. Load at 4.03
TC: 91 lb Conc. Load at 13.77
PLT: 91 lb Conc. Load at ( 5.77,10.05), (7.77,10.05)
(9.77,10.05), (11.77,10.05)
BC: 124 lb Conc. Load at 4.03
BC: 70 lb Conc. Load at 5.77, 7.77, 9.77,11.77
13.77
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1139 /-/-/-/699 /-
K 1188 /-/-/-/721 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
K Brg Width = -Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1371 -2279
C - D 792 -1238
D - E 664 -1105
E - F 648 -1085
Chords Tens.Comp.
F - G 641 -1073
G - H 663 -1103
H - I 724 -1148
I - J 214 -384
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2064 -1232
Chords Tens.Comp.
N - M 2079 -1225
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 245 -431
C - M 388 -661
O - P 247 -432
P - Q 249 -434
M - I 1463 -875
Webs Tens.Comp.
F - Q 513 -228
Q - R 249 -434
R - S 248 -434
S - I 241 -425
J - K 406 -751
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.119 H 999 360
VERT(CL):0.206 H 827 240
HORZ(LL):0.038 J - -
HORZ(TL):0.066 J - -
Creep Factor: 2.0
Max TC CSI:0.871
Max BC CSI:0.945
Max Web CSI:0.376
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:176082 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T26 /
DrwNo:193.21.0723.05078
SSB /WHK 07/12/2021
14'4"8
6'3"1'4"
(TYP)
2'7"12
4'9"2
4'9"2
8'11"
4'1"14
13'9"2
4'10"2
14'4"8
7"6
4'1"12
4'1"12
8'11"
4'9"4
13'8"4
4'9"4
14'4"8
8"4
1'
4"1 1'9"64'0"104'5"68'1"A
B
C
D
E
F
G
H I J
KLMN
O P Q R S
5
12
3X5(A1)
5X8
4X4
3X83X10
8X81.5X6
1.5X6
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 719 /-/-/430 /422 /159
F 655 /-/-/357 /379 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 744 -1195
C - D 541 -897
Chords Tens.Comp.
D - E 540 -894
E - F 726 -1158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1069 -624
Chords Tens.Comp.
G - F 1024 -602
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 461 -191
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 G 999 360
VERT(CL):0.074 G 999 240
HORZ(LL):-0.017 G - -
HORZ(TL):0.029 G - -
Creep Factor: 2.0
Max TC CSI:0.299
Max BC CSI:0.691
Max Web CSI:0.119
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:176105 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T87 /
DrwNo:193.21.0723.06218
SSB /WHK 07/12/2021
17'6"
4'9"6
4'9"6
8'11"
4'1"10
13'0"10
4'1"10
17'6"
4'5"6
8'11"
8'11"
17'6"
8'7"1'
4"1 5"124'0"104'5"68'1"A
B
C
D
E
F
G
5
12
2X4(A1)
1.5X4
4X4
5X8
1.5X4
2X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 719 /-/-/430 /422 /159
F 655 /-/-/357 /379 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.6 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 744 -1195
C - D 541 -897
Chords Tens.Comp.
D - E 540 -894
E - F 726 -1158
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1069 -624
Chords Tens.Comp.
G - F 1024 -602
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 461 -191
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.041 G 999 360
VERT(CL):0.074 G 999 240
HORZ(LL):-0.017 G - -
HORZ(TL):0.029 G - -
Creep Factor: 2.0
Max TC CSI:0.299
Max BC CSI:0.691
Max Web CSI:0.119
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T38
Ply: 1
Qty:1
SEQN:176105 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T87 /
DrwNo:193.21.0723.06218
SSB /WHK 07/12/2021
17'6"
4'9"6
4'9"6
8'11"
4'1"10
13'0"10
4'1"10
17'6"
4'5"6
8'11"
8'11"
17'6"
8'7"1'
4"1 5"124'0"104'5"68'1"A
B
C
D
E
F
G
5
12
2X4(A1)
1.5X4
4X4
5X8
1.5X4
2X4(B1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 719 /-/-/430 /422 /159
J 655 /-/-/357 /379 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - H 1977 -2625
C - D 371 -575
D - E 938 -1629
E - F 645 -1035
Chords Tens.Comp.
F - G 637 -1023
G - L 1362 -1946
H - I 321 -494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - S 1384 -721
S - Q 1539 -820
Q - P 1532 -820
Chords Tens.Comp.
P - O 1417 -748
O - L 1422 -747
L - H 1305 -671
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 500 -796
S - T 449 -254
E - P 468 -706
Webs Tens.Comp.
F - P 646 -361
P - G 387 -576
K - I 417 -665
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 R 999 360
VERT(CL):0.380 R 543 240
HORZ(LL):0.159 K - -
HORZ(TL):0.295 K - -
Creep Factor: 2.0
Max TC CSI:0.553
Max BC CSI:0.809
Max Web CSI:0.296
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T38TR
Ply: 1
Qty:3
SEQN:179616 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T58
DrwNo:193.21.0912.30177
JB /WHK 07/12/2021
T3
17'6"
1'4"13
1'4"13
5'7"14
4'3"1
8'11"
3'3"2
12'5"10
3'6"10
17'6"
5'0"6
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
5'6"2
2'9"12
8'11"
3'4"14
12'3"14
3'4"14
16'2"14
3'10"15
17'6"
1'3"21'
(NNL)
4"1 5"128"4'0"104'5"68'1"A
B
C D
E
F
G
H I
J
KLMNOPQ
RSTU
5 12
2X4(A1)
3X4
3X32X6
3X4
4X4
3X8
3X8
3X3
2X41.5X6(**)
3X8
2X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 719 /-/-/430 /422 /159
J 655 /-/-/357 /379 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - H 1977 -2625
C - D 371 -575
D - E 938 -1629
E - F 645 -1035
Chords Tens.Comp.
F - G 637 -1023
G - L 1362 -1946
H - I 321 -494
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - S 1384 -721
S - Q 1539 -820
Q - P 1532 -820
Chords Tens.Comp.
P - O 1417 -748
O - L 1422 -747
L - H 1305 -671
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 500 -796
S - T 449 -254
E - P 468 -706
Webs Tens.Comp.
F - P 646 -361
P - G 387 -576
K - I 417 -665
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.205 R 999 360
VERT(CL):0.380 R 543 240
HORZ(LL):0.159 K - -
HORZ(TL):0.295 K - -
Creep Factor: 2.0
Max TC CSI:0.553
Max BC CSI:0.809
Max Web CSI:0.296
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T38TR
Ply: 1
Qty:3
SEQN:179616 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T58
DrwNo:193.21.0912.30177
JB /WHK 07/12/2021
T3
17'6"
1'4"13
1'4"13
5'7"14
4'3"1
8'11"
3'3"2
12'5"10
3'6"10
17'6"
5'0"6
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
5'6"2
2'9"12
8'11"
3'4"14
12'3"14
3'4"14
16'2"14
3'10"15
17'6"
1'3"21'
(NNL)
4"1 5"128"4'0"104'5"68'1"A
B
C D
E
F
G
H I
J
KLMNOPQ
RSTU
5 12
2X4(A1)
3X4
3X32X6
3X4
4X4
3X8
3X8
3X3
2X41.5X6(**)
3X8
2X4(B1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 718 /-/-/429 /421 /159
F 652 /-/-/354 /377 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 741 -1190
C - D 538 -892
Chords Tens.Comp.
D - E 536 -889
E - F 720 -1147
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1065 -623
Chords Tens.Comp.
G - F 1012 -597
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 457 -187
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.042 E 999 360
VERT(CL):0.076 G 999 240
HORZ(LL):-0.018 G - -
HORZ(TL):0.032 G - -
Creep Factor: 2.0
Max TC CSI:0.308
Max BC CSI:0.689
Max Web CSI:0.119
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T39
Ply: 1
Qty:2
SEQN:176108 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T17 /
DrwNo:193.21.0723.05485
SSB /WHK 07/12/2021
17'5"2
4'9"6
4'9"6
8'11"
4'1"10
13'0"10
4'1"10
17'5"2
4'4"8
8'11"
8'11"
17'5"2
8'6"21'
4"1 6"14'0"104'5"68'1"A
B
C
D
E
F
G
5
12
2X4(A1)
1.5X4
4X4
5X8
1.5X4
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 718 /-/-/429 /421 /159
F 652 /-/-/354 /377 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 741 -1190
C - D 538 -892
Chords Tens.Comp.
D - E 536 -889
E - F 720 -1147
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 1065 -623
Chords Tens.Comp.
G - F 1012 -597
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - G 457 -187
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.042 E 999 360
VERT(CL):0.076 G 999 240
HORZ(LL):-0.018 G - -
HORZ(TL):0.032 G - -
Creep Factor: 2.0
Max TC CSI:0.308
Max BC CSI:0.689
Max Web CSI:0.119
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T39
Ply: 1
Qty:2
SEQN:176108 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T17 /
DrwNo:193.21.0723.05485
SSB /WHK 07/12/2021
17'5"2
4'9"6
4'9"6
8'11"
4'1"10
13'0"10
4'1"10
17'5"2
4'4"8
8'11"
8'11"
17'5"2
8'6"21'
4"1 6"14'0"104'5"68'1"A
B
C
D
E
F
G
5
12
2X4(A1)
1.5X4
4X4
5X8
1.5X4
3X4(B1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 718 /-/-/429 /421 /159
J 652 /-/-/354 /377 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - H 1799 -2444
C - D 369 -574
D - E 936 -1623
E - F 642 -1030
Chords Tens.Comp.
F - G 634 -1017
G - L 1259 -1808
H - I 335 -521
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - S 1378 -720
S - Q 1534 -820
Q - P 1526 -819
Chords Tens.Comp.
P - O 1406 -744
O - L 1411 -743
L - H 1278 -658
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 499 -793
S - T 448 -254
E - P 467 -705
Webs Tens.Comp.
F - P 640 -357
P - G 382 -569
K - I 453 -729
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.208 R 992 360
VERT(CL):0.384 R 536 240
HORZ(LL):0.167 K - -
HORZ(TL):0.311 K - -
Creep Factor: 2.0
Max TC CSI:0.975
Max BC CSI:0.807
Max Web CSI:0.295
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T39TR
Ply: 1
Qty:2
SEQN:179612 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T18
DrwNo:193.21.0912.36510
JB /WHK 07/12/2021
T3
17'5"2
1'4"13
1'4"13
5'7"14
4'3"1
8'11"
3'3"2
12'5"10
3'6"10
17'5"2
4'11"8
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
5'6"2
2'9"12
8'11"
3'4"14
12'3"14
3'4"14
16'2"14
3'10"15
17'5"2
1'2"41'
(NNL)
4"1 6"18"4'0"104'5"68'1"A
B
C D
E
F
G
H I
J
KLMNOPQ
RSTU
5 12
2X4(A1)
3X4
3X32X6
3X4
4X4
3X8
3X8
3X3
3X31.5X6
3X8
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Laterally brace Bottom Chord above filler at 24" oc,
including a lateral brace at chord ends.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 718 /-/-/429 /421 /159
J 652 /-/-/354 /377 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
L - H 1799 -2444
C - D 369 -574
D - E 936 -1623
E - F 642 -1030
Chords Tens.Comp.
F - G 634 -1017
G - L 1259 -1808
H - I 335 -521
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - S 1378 -720
S - Q 1534 -820
Q - P 1526 -819
Chords Tens.Comp.
P - O 1406 -744
O - L 1411 -743
L - H 1278 -658
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 499 -793
S - T 448 -254
E - P 467 -705
Webs Tens.Comp.
F - P 640 -357
P - G 382 -569
K - I 453 -729
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.208 R 992 360
VERT(CL):0.384 R 536 240
HORZ(LL):0.167 K - -
HORZ(TL):0.311 K - -
Creep Factor: 2.0
Max TC CSI:0.975
Max BC CSI:0.807
Max Web CSI:0.295
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T39TR
Ply: 1
Qty:2
SEQN:179612 SPEC
FROM:
Cust: R 761 JRef:1X707610001 T18
DrwNo:193.21.0912.36510
JB /WHK 07/12/2021
T3
17'5"2
1'4"13
1'4"13
5'7"14
4'3"1
8'11"
3'3"2
12'5"10
3'6"10
17'5"2
4'11"8
1'4"13
1'4"13
1'11"1
6"4
2'8"6
9"5
5'6"2
2'9"12
8'11"
3'4"14
12'3"14
3'4"14
16'2"14
3'10"15
17'5"2
1'2"41'
(NNL)
4"1 6"18"4'0"104'5"68'1"A
B
C D
E
F
G
H I
J
KLMNOPQ
RSTU
5 12
2X4(A1)
3X4
3X32X6
3X4
4X4
3X8
3X8
3X3
3X31.5X6
3X8
3X4(B1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/347 /290 /162
L 790 /-/-/376 /496 /-
H 107 /-17 /-/52 /48 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings B, L, & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 423 -703
C - D 212 -389
Chords Tens.Comp.
D - E 213 -379
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 620 -395
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - E 542 -272
Webs Tens.Comp.
E - L 459 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 C 999 360
VERT(CL):0.032 M 999 240
HORZ(LL):0.005 M - -
HORZ(TL):0.015 M - -
Creep Factor: 2.0
Max TC CSI:0.265
Max BC CSI:0.566
Max Web CSI:0.129
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:176114 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T1 /
DrwNo:193.21.0723.06501
SSB /WHK 07/12/2021
12'8"10 4'8"8
4'9"6
4'9"6
8'11"
4'1"10
12'8"10
3'9"10
14'10"15
2'2"5
16'11"10
2'0"11
17'5"2
5"8
8'11"
8'11"
12'10"6
3'11"6
13'10"15
1'0"9
15'2"7
1'3"8
16'11"10
1'9"3
17'5"2
5"8
1'
9"6
4"1 1'6"11
2"104'0"104'5"68'1"
9'1"
A
B
C
D
E
F G
H
IJKLM
5
12
2.5
12
2X4(A1)
1.5X4
4X4
3X8
3X8
5X5 5X5
5X5
3X4
4X7(++)
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Plating Notes
(++) - This plate works for both joints covered.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 520 /-/-/347 /290 /162
L 790 /-/-/376 /496 /-
H 107 /-17 /-/52 /48 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
L Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings B, L, & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 423 -703
C - D 212 -389
Chords Tens.Comp.
D - E 213 -379
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 620 -395
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - E 542 -272
Webs Tens.Comp.
E - L 459 -716
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.015 C 999 360
VERT(CL):0.032 M 999 240
HORZ(LL):0.005 M - -
HORZ(TL):0.015 M - -
Creep Factor: 2.0
Max TC CSI:0.265
Max BC CSI:0.566
Max Web CSI:0.129
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T40
Ply: 1
Qty:1
SEQN:176114 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T1 /
DrwNo:193.21.0723.06501
SSB /WHK 07/12/2021
12'8"10 4'8"8
4'9"6
4'9"6
8'11"
4'1"10
12'8"10
3'9"10
14'10"15
2'2"5
16'11"10
2'0"11
17'5"2
5"8
8'11"
8'11"
12'10"6
3'11"6
13'10"15
1'0"9
15'2"7
1'3"8
16'11"10
1'9"3
17'5"2
5"8
1'
9"6
4"1 1'6"11
2"104'0"104'5"68'1"
9'1"
A
B
C
D
E
F G
H
IJKLM
5
12
2.5
12
2X4(A1)
1.5X4
4X4
3X8
3X8
5X5 5X5
5X5
3X4
4X7(++)
1.5X4
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 525 /-/-/347 /285 /167
K 796 /-/-/380 /493 /-
H 82 /-1 /-/41 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings B, K, & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 411 -716
C - D 201 -403
Chords Tens.Comp.
D - E 201 -392
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 632 -434
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - E 581 -320
Webs Tens.Comp.
K - E 477 -704
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 C 999 360
VERT(CL):0.032 L 999 240
HORZ(LL):0.005 L - -
HORZ(TL):0.015 L - -
Creep Factor: 2.0
Max TC CSI:0.267
Max BC CSI:0.564
Max Web CSI:0.131
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:176117 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T12 /
DrwNo:193.21.0723.06360
SSB /WHK 07/12/2021
12'8"10 4'8"8
4'9"6
4'9"6
8'11"
4'1"10
12'10"15
3'11"15
16'0"11
3'1"12
16'11"10
10"15
17'5"2
5"8
8'11"
8'11"
12'10"6
3'11"6
15'10"15
3'0"9
16'11"10
1'0"11
17'5"2
5"8
1'
4"6
4"1 1'1'4"117"104'0"104'5"68'1"
9'1"
A
B
C
D
E F G
H
IJ
KL
5 12
2.5
12
2X4(A1)
1.5X4
4X4
3X8 5X5
5X10(SRS)
5X5
1.5X4 4X4
2X61.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Rt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 525 /-/-/347 /285 /167
K 796 /-/-/380 /493 /-
H 82 /-1 /-/41 /46 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
K Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings B, K, & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 411 -716
C - D 201 -403
Chords Tens.Comp.
D - E 201 -392
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 632 -434
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - E 581 -320
Webs Tens.Comp.
K - E 477 -704
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.016 C 999 360
VERT(CL):0.032 L 999 240
HORZ(LL):0.005 L - -
HORZ(TL):0.015 L - -
Creep Factor: 2.0
Max TC CSI:0.267
Max BC CSI:0.564
Max Web CSI:0.131
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T41
Ply: 1
Qty:1
SEQN:176117 /SPEC
FROM:
Cust: R 761 JRef:1X707610001 T12 /
DrwNo:193.21.0723.06360
SSB /WHK 07/12/2021
12'8"10 4'8"8
4'9"6
4'9"6
8'11"
4'1"10
12'10"15
3'11"15
16'0"11
3'1"12
16'11"10
10"15
17'5"2
5"8
8'11"
8'11"
12'10"6
3'11"6
15'10"15
3'0"9
16'11"10
1'0"11
17'5"2
5"8
1'
4"6
4"1 1'1'4"117"104'0"104'5"68'1"
9'1"
A
B
C
D
E F G
H
IJ
KL
5 12
2.5
12
2X4(A1)
1.5X4
4X4
3X8 5X5
5X10(SRS)
5X5
1.5X4 4X4
2X61.5X4
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 7.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.03
BC: From 10 plf at 3.03 to 10 plf at 3.64
BC: From 20 plf at 3.64 to 20 plf at 6.67
BC: From 4 plf at 6.67 to 4 plf at 7.67
TC: 121 lb Conc. Load at 3.03, 3.64
BC: 74 lb Conc. Load at 3.03, 3.64
Wind
Wind loads and reactions based on MWFRS.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 506 /-/-/-/302 /-
H 537 /-/-/-/323 /-
Wind reactions based on MWFRS
G Brg Width = 7.6 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 487 -165
Chords Tens.Comp.
F - D 488 -165
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.029 F 476 360
VERT(CL):0.055 F 252 240
HORZ(LL):0.005 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.207
Max BC CSI:0.675
Max Web CSI:0.057
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:176090 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T49 /
DrwNo:193.21.0723.06516
SSB /WHK 07/12/2021
8"6 4'11"10 1'
3'
3'
6'8"
3'8"
6'8"
6'8"1'1'
4"11'7"11'11"1310'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 7.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.03
BC: From 10 plf at 3.03 to 10 plf at 3.64
BC: From 20 plf at 3.64 to 20 plf at 6.67
BC: From 4 plf at 6.67 to 4 plf at 7.67
TC: 121 lb Conc. Load at 3.03, 3.64
BC: 74 lb Conc. Load at 3.03, 3.64
Wind
Wind loads and reactions based on MWFRS.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 506 /-/-/-/302 /-
H 537 /-/-/-/323 /-
Wind reactions based on MWFRS
G Brg Width = 7.6 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 487 -165
Chords Tens.Comp.
F - D 488 -165
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.029 F 476 360
VERT(CL):0.055 F 252 240
HORZ(LL):0.005 C - -
HORZ(TL):0.010 C - -
Creep Factor: 2.0
Max TC CSI:0.207
Max BC CSI:0.675
Max Web CSI:0.057
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T42
Ply: 1
Qty:1
SEQN:176090 /HIPS
FROM:
Cust: R 761 JRef:1X707610001 T49 /
DrwNo:193.21.0723.06516
SSB /WHK 07/12/2021
8"6 4'11"10 1'
3'
3'
6'8"
3'8"
6'8"
6'8"1'1'
4"11'7"11'11"1310'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 321 /-/-/263 /170 /87
H 339 /-/-/282 /178 /-
Wind reactions based on MWFRS
G Brg Width = 7.6 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 F 631 360
VERT(CL):0.038 F 367 240
HORZ(LL):0.008 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.131
Max BC CSI:0.339
Max Web CSI:0.031
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T43
Ply: 1
Qty:2
SEQN:176093 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T10 /
DrwNo:193.21.0723.01610
JB /DF 07/12/2021
8"6 4'11"10 1'
3'4"
3'4"
6'8"
3'4"
3'4"
3'4"
6'8"
3'4"1'1'
4"11'8"122'1"710'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 321 /-/-/263 /170 /87
H 339 /-/-/282 /178 /-
Wind reactions based on MWFRS
G Brg Width = 7.6 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 F 631 360
VERT(CL):0.038 F 367 240
HORZ(LL):0.008 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.131
Max BC CSI:0.339
Max Web CSI:0.031
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T43
Ply: 1
Qty:2
SEQN:176093 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T10 /
DrwNo:193.21.0723.01610
JB /DF 07/12/2021
8"6 4'11"10 1'
3'4"
3'4"
6'8"
3'4"
3'4"
3'4"
6'8"
3'4"1'1'
4"11'8"122'1"710'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 332 /-/-/282 /172 /87
H 332 /-/-/282 /172 /-
Wind reactions based on MWFRS
G Brg Width = 4.0 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.023 F 603 360
VERT(CL):0.036 F 388 240
HORZ(LL):-0.009 C - -
HORZ(TL):0.011 C - -
Creep Factor: 2.0
Max TC CSI:0.128
Max BC CSI:0.325
Max Web CSI:0.032
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T44
Ply: 1
Qty:4
SEQN:176096 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T88 /
DrwNo:193.21.0723.06625
SSB /WHK 07/12/2021
1'4'8"1'
3'4"
3'4"
6'8"
3'4"
3'4"
3'4"
6'8"
3'4"1'1'
4"11'8"122'1"710'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
G 332 /-/-/282 /172 /87
H 332 /-/-/282 /172 /-
Wind reactions based on MWFRS
G Brg Width = 4.0 Min Req =1.5
H Brg Width = 4.0 Min Req =1.5
Bearings G & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.023 F 603 360
VERT(CL):0.036 F 388 240
HORZ(LL):-0.009 C - -
HORZ(TL):0.011 C - -
Creep Factor: 2.0
Max TC CSI:0.128
Max BC CSI:0.325
Max Web CSI:0.032
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T44
Ply: 1
Qty:4
SEQN:176096 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T88 /
DrwNo:193.21.0723.06625
SSB /WHK 07/12/2021
1'4'8"1'
3'4"
3'4"
6'8"
3'4"
3'4"
3'4"
6'8"
3'4"1'1'
4"11'8"122'1"710'9"A
B
C
D
E
FG H
5
12
2X4(A1)
4X4
1.5X4 2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 317 /-/0 /221 /173 /87
J 329 /-/0 /230 /179 /0
Wind reactions based on MWFRS
I Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings I & J are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.014 D 728 360
VERT(CL):0.027 D 366 240
HORZ(LL):0.007 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.301
Max Web CSI:0.038
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T45
Ply: 1
Qty:6
SEQN:176111 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T83 /
DrwNo:193.21.0723.06563
SSB /WHK 07/12/2021
7"2 5'3"8 8"6
3'3"8
3'3"8
6'7"
3'3"8
3'3"8
3'3"8
6'7"
3'3"81'0"8 1'0"82'0"43'4"129'1"
A
B
C
D
E
FGHIJ
5
12
4X4
1.5X4
4X4
3X8
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
I 317 /-/0 /221 /173 /87
J 329 /-/0 /230 /179 /0
Wind reactions based on MWFRS
I Brg Width = 3.5 Min Req =1.5
J Brg Width = 3.5 Min Req =1.5
Bearings I & J are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.014 D 728 360
VERT(CL):0.027 D 366 240
HORZ(LL):0.007 C - -
HORZ(TL):0.009 C - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.301
Max Web CSI:0.038
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:T45
Ply: 1
Qty:6
SEQN:176111 /COMN
FROM:
Cust: R 761 JRef:1X707610001 T83 /
DrwNo:193.21.0723.06563
SSB /WHK 07/12/2021
7"2 5'3"8 8"6
3'3"8
3'3"8
6'7"
3'3"8
3'3"8
3'3"8
6'7"
3'3"81'0"8 1'0"82'0"43'4"129'1"
A
B
C
D
E
FGHIJ
5
12
4X4
1.5X4
4X4
3X8
4X4
1.5X4
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/192 /123 /137
D 82 /-/-/46 /2 /-
C 109 /-/-/70 /117 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.008 D - -
Creep Factor: 2.0
Max TC CSI:0.249
Max BC CSI:0.194
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1
Ply: 1
Qty:9
SEQN:175974 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T57 /
DrwNo:193.21.0723.06187
SSB /WHK 07/12/2021
4'8"
4'8"1'
4"1 2'3"62'8"28'1"
10'0"14
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/192 /123 /137
D 82 /-/-/46 /2 /-
C 109 /-/-/70 /117 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.005 D - -
HORZ(TL):0.008 D - -
Creep Factor: 2.0
Max TC CSI:0.249
Max BC CSI:0.194
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1
Ply: 1
Qty:9
SEQN:175974 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T57 /
DrwNo:193.21.0723.06187
SSB /WHK 07/12/2021
4'8"
4'8"1'
4"1 2'3"62'8"28'1"
10'0"14
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/192 /131 /104
E 91 /-/-/58 /54 /-
D 70 /-/-/36 /42 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.017 C 999 360
VERT(CL):0.030 C 999 240
HORZ(LL):0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.179
Max BC CSI:0.192
Max Web CSI:0.033
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1HA
Ply: 1
Qty:1
SEQN:176012 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T63 /
DrwNo:193.21.0723.06593
SSB /WHK 07/12/2021
3'4"
3'4"
4'8"
1'4"
3'5"12
3'5"12
4'8"
1'2"41'
4"1 1'8"122'1"78'1"
9'6"4
A
B
C D
EF
5
12
2X4(A1)
4X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/192 /131 /104
E 91 /-/-/58 /54 /-
D 70 /-/-/36 /42 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.017 C 999 360
VERT(CL):0.030 C 999 240
HORZ(LL):0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.179
Max BC CSI:0.192
Max Web CSI:0.033
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1HA
Ply: 1
Qty:1
SEQN:176012 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T63 /
DrwNo:193.21.0723.06593
SSB /WHK 07/12/2021
3'4"
3'4"
4'8"
1'4"
3'5"12
3'5"12
4'8"
1'2"41'
4"1 1'8"122'1"78'1"
9'6"4
A
B
C D
EF
5
12
2X4(A1)
4X4
1.5X4
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/178 /136 /54
E 80 /-/-/45 /9 /-
D 99 /-/-/35 /84 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 C 999 360
VERT(CL):0.040 C 999 240
HORZ(LL):0.009 C - -
HORZ(TL):0.016 C - -
Creep Factor: 2.0
Max TC CSI:0.213
Max BC CSI:0.200
Max Web CSI:0.021
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1HB
Ply: 1
Qty:1
SEQN:175981 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T54 /
DrwNo:193.21.0723.06313
SSB /WHK 07/12/2021
1'4"
1'4"
4'8"
3'4"
4'8"
4'8"1'
4"1 10"121'3"78'1"
8'8"4
A
B
C D
EF
5
12
2X4(A1)
4X4
1.5X4(**)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 249 /-/-/178 /136 /54
E 80 /-/-/45 /9 /-
D 99 /-/-/35 /84 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.022 C 999 360
VERT(CL):0.040 C 999 240
HORZ(LL):0.009 C - -
HORZ(TL):0.016 C - -
Creep Factor: 2.0
Max TC CSI:0.213
Max BC CSI:0.200
Max Web CSI:0.021
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J1HB
Ply: 1
Qty:1
SEQN:175981 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T54 /
DrwNo:193.21.0723.06313
SSB /WHK 07/12/2021
1'4"
1'4"
4'8"
3'4"
4'8"
4'8"1'
4"1 10"121'3"78'1"
8'8"4
A
B
C D
EF
5
12
2X4(A1)
4X4
1.5X4(**)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.54
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.54
BC: 97 lb Conc. Load at 1.32
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/-/147 /-
D 61 /-/-/-/9 /-
C 60 /-/-/-/48 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.080
Max BC CSI:0.139
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J2
Ply: 1
Qty:1
SEQN:175993 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T23 /
DrwNo:193.21.0723.01627
JB /DF 07/12/2021
2'6"8
2'6"81'
4"1 1'4"121'9"88'1"
9'2"4
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 55 plf at -1.00 to 55 plf at 2.54
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 2.54
BC: 97 lb Conc. Load at 1.32
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/-/147 /-
D 61 /-/-/-/9 /-
C 60 /-/-/-/48 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.080
Max BC CSI:0.139
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J2
Ply: 1
Qty:1
SEQN:175993 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T23 /
DrwNo:193.21.0723.01627
JB /DF 07/12/2021
2'6"8
2'6"81'
4"1 1'4"121'9"88'1"
9'2"4
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/148 /93 /84
D 42 /-/-/24 /-/-
C 51 /-/-/30 /58 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.067
Max BC CSI:0.046
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J3
Ply: 1
Qty:3
SEQN:175976 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T41 /
DrwNo:193.21.0723.01985
JB /DF 07/12/2021
2'7"1
2'7"11'
4"1 1'5"1'9"128'1"
9'2"8
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 178 /-/-/148 /93 /84
D 42 /-/-/24 /-/-
C 51 /-/-/30 /58 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.067
Max BC CSI:0.046
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J3
Ply: 1
Qty:3
SEQN:175976 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T41 /
DrwNo:193.21.0723.01985
JB /DF 07/12/2021
2'7"1
2'7"11'
4"1 1'5"1'9"128'1"
9'2"8
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 97 /-/-/63 /39 /64
C 47 /-/-/30 /6 /-
B 63 /-/-/42 /65 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.079
Max BC CSI:0.070
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J3A
Ply: 1
Qty:1
SEQN:175990 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T80 /
DrwNo:193.21.0723.01657
JB /DF 07/12/2021
2'7"1
1"8
1"8
2'8"9
2'7"1
4"1 1'5"8'1"
9'2"8
A
B
C
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 97 /-/-/63 /39 /64
C 47 /-/-/30 /6 /-
B 63 /-/-/42 /65 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 C - -
HORZ(TL):0.002 C - -
Creep Factor: 2.0
Max TC CSI:0.079
Max BC CSI:0.070
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J3A
Ply: 1
Qty:1
SEQN:175990 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T80 /
DrwNo:193.21.0723.01657
JB /DF 07/12/2021
2'7"1
1"8
1"8
2'8"9
2'7"1
4"1 1'5"8'1"
9'2"8
A
B
C
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 294 /-/-/221 /143 /168
D 106 /-/-/61 /3 /-
C 141 /-/-/92 /151 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 D - -
HORZ(TL):0.017 D - -
Creep Factor: 2.0
Max TC CSI:0.442
Max BC CSI:0.337
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J4
Ply: 1
Qty:8
SEQN:175969 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T77 /
DrwNo:193.21.0723.01687
JB /DF 07/12/2021
5'11"1
5'11"11'
4"1 2'9"113'2"68'1"
10'7"3
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 294 /-/-/221 /143 /168
D 106 /-/-/61 /3 /-
C 141 /-/-/92 /151 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 D - -
HORZ(TL):0.017 D - -
Creep Factor: 2.0
Max TC CSI:0.442
Max BC CSI:0.337
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J4
Ply: 1
Qty:8
SEQN:175969 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T77 /
DrwNo:193.21.0723.01687
JB /DF 07/12/2021
5'11"1
5'11"11'
4"1 2'9"113'2"68'1"
10'7"3
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 258 /-/-/198 /127 /143
D 87 /-/-/49 /2 /-
C 115 /-/-/74 /124 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.284
Max BC CSI:0.220
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J5
Ply: 1
Qty:7
SEQN:175970 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T47 /
DrwNo:193.21.0723.01922
JB /DF 07/12/2021
4'11"1
4'11"11'
4"1 2'4"112'9"68'1"
10'2"3
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 258 /-/-/198 /127 /143
D 87 /-/-/49 /2 /-
C 115 /-/-/74 /124 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.009 D - -
Creep Factor: 2.0
Max TC CSI:0.284
Max BC CSI:0.220
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J5
Ply: 1
Qty:7
SEQN:175970 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T47 /
DrwNo:193.21.0723.01922
JB /DF 07/12/2021
4'11"1
4'11"11'
4"1 2'4"112'9"68'1"
10'2"3
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 225 /-/-/177 /113 /120
D 70 /-/-/38 /1 /-
C 91 /-/-/58 /98 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.169
Max BC CSI:0.135
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J6
Ply: 1
Qty:6
SEQN:175971 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T86 /
DrwNo:193.21.0723.01626
JB /DF 07/12/2021
4'
4'1'
4"1 2'0"12'4"138'1"
9'9"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 225 /-/-/177 /113 /120
D 70 /-/-/38 /1 /-
C 91 /-/-/58 /98 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.003 D - -
HORZ(TL):0.004 D - -
Creep Factor: 2.0
Max TC CSI:0.169
Max BC CSI:0.135
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J6
Ply: 1
Qty:6
SEQN:175971 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T86 /
DrwNo:193.21.0723.01626
JB /DF 07/12/2021
4'
4'1'
4"1 2'0"12'4"138'1"
9'9"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J7
Ply: 1
Qty:2
SEQN:175978 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T48 /
DrwNo:193.21.0723.05359
SSB /WHK 07/12/2021
3'
3'1'
4"1 1'7"11'11"1310'9"
12'0"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:J7
Ply: 1
Qty:2
SEQN:175978 /EJAC
FROM:
Cust: R 761 JRef:1X707610001 T48 /
DrwNo:193.21.0723.05359
SSB /WHK 07/12/2021
3'
3'1'
4"1 1'7"11'11"1310'9"
12'0"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 161 /-/-/-/101 /-
D 79 /-/-/7 /-/-
C 171 /-/-/-/152 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.010 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.339
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K1
Ply: 1
Qty:2
SEQN:176006 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T59 /
DrwNo:193.21.0723.05860
SSB /WHK 07/12/2021
6'7"3
6'7"31'5"
3"13 2'3"32'8"8'1"
10'0"11
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-8-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 161 /-/-/-/101 /-
D 79 /-/-/7 /-/-
C 171 /-/-/-/152 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.010 D - -
HORZ(TL):0.019 D - -
Creep Factor: 2.0
Max TC CSI:0.548
Max BC CSI:0.339
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K1
Ply: 1
Qty:2
SEQN:176006 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T59 /
DrwNo:193.21.0723.05860
SSB /WHK 07/12/2021
6'7"3
6'7"31'5"
3"13 2'3"32'8"8'1"
10'0"11
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-6-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 71 /-/-/-/49 /-
D 20 /-/-/3 /-/-
C 44 /-/-/-/39 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.061
Max BC CSI:0.040
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K2
Ply: 1
Qty:1
SEQN:176023 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T15 /
DrwNo:193.21.0723.06532
SSB /WHK 07/12/2021
3'7"2
3'7"21'5"
3"13 1'4"91'9"68'1"
9'2"1
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-6-8 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 71 /-/-/-/49 /-
D 20 /-/-/3 /-/-
C 44 /-/-/-/39 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.061
Max BC CSI:0.040
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K2
Ply: 1
Qty:1
SEQN:176023 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T15 /
DrwNo:193.21.0723.06532
SSB /WHK 07/12/2021
3'7"2
3'7"21'5"
3"13 1'4"91'9"68'1"
9'2"1
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 72 /-/-/-/49 /-
D 21 /-/-/3 /-/-
C 46 /-/-/-/41 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.044
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K3
Ply: 1
Qty:1
SEQN:176026 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T14 /
DrwNo:193.21.0723.06203
SSB /WHK 07/12/2021
3'7"15
3'7"151'5"
3"13 1'4"131'9"98'1"
9'2"5
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 2-7-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 72 /-/-/-/49 /-
D 21 /-/-/3 /-/-
C 46 /-/-/-/41 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.044
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K3
Ply: 1
Qty:1
SEQN:176026 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T14 /
DrwNo:193.21.0723.06203
SSB /WHK 07/12/2021
3'7"15
3'7"151'5"
3"13 1'4"131'9"98'1"
9'2"5
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-11-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/-/163 /-
D 122 /-/-/16 /-/-
C 287 /-/-/-/253 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.023 D - -
HORZ(TL):0.042 D - -
Creep Factor: 2.0
Max TC CSI:0.615
Max BC CSI:0.624
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K4
Ply: 1
Qty:2
SEQN:175996 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T3 /
DrwNo:193.21.0723.06330
SSB /WHK 07/12/2021
8'4"8
8'4"81'5"
3"13 2'9"73'2"48'1"
10'6"15
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 5-11-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/-/163 /-
D 122 /-/-/16 /-/-
C 287 /-/-/-/253 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.023 D - -
HORZ(TL):0.042 D - -
Creep Factor: 2.0
Max TC CSI:0.615
Max BC CSI:0.624
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K4
Ply: 1
Qty:2
SEQN:175996 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T3 /
DrwNo:193.21.0723.06330
SSB /WHK 07/12/2021
8'4"8
8'4"81'5"
3"13 2'9"73'2"48'1"
10'6"15
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-11-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 176 /-/-/-/109 /-
D 88 /-/-/8 /-/-
C 191 /-/-/-/170 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.656
Max BC CSI:0.401
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K5
Ply: 1
Qty:1
SEQN:175999 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T35 /
DrwNo:193.21.0723.05671
SSB /WHK 07/12/2021
6'11"8
6'11"81'5"
3"13 2'4"72'9"48'1"
10'1"15
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-11-1 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 176 /-/-/-/109 /-
D 88 /-/-/8 /-/-
C 191 /-/-/-/170 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.024 D - -
Creep Factor: 2.0
Max TC CSI:0.656
Max BC CSI:0.401
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K5
Ply: 1
Qty:1
SEQN:175999 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T35 /
DrwNo:193.21.0723.05671
SSB /WHK 07/12/2021
6'11"8
6'11"81'5"
3"13 2'4"72'9"48'1"
10'1"15
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 147 /-/-/-/97 /-
D 54 /-/-/7 /-/-
C 121 /-/-/-/107 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.005 D - -
HORZ(TL):0.008 D - -
Creep Factor: 2.0
Max TC CSI:0.310
Max BC CSI:0.189
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K6
Ply: 1
Qty:1
SEQN:176003 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T43 /
DrwNo:193.21.0723.05579
SSB /WHK 07/12/2021
5'7"14
5'7"141'5"
3"13 1'11"132'4"108'1"
9'9"5
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 4-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 147 /-/-/-/97 /-
D 54 /-/-/7 /-/-
C 121 /-/-/-/107 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.005 D - -
HORZ(TL):0.008 D - -
Creep Factor: 2.0
Max TC CSI:0.310
Max BC CSI:0.189
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K6
Ply: 1
Qty:1
SEQN:176003 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T43 /
DrwNo:193.21.0723.05579
SSB /WHK 07/12/2021
5'7"14
5'7"141'5"
3"13 1'11"132'4"108'1"
9'9"5
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 0 plf at -1.41 to 32 plf at 0.00
TC: From 0 plf at 0.00 to 53 plf at 4.24
BC: From 0 plf at 0.00 to 19 plf at 4.24
TC: 40 lb Conc. Load at -1.41
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 134 /-/-/-/101 /-
D 23 /-/-/11 /-/-
C 58 /-/-/-/53 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.154
Max BC CSI:0.040
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K7
Ply: 1
Qty:2
SEQN:176009 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T36 /
DrwNo:193.21.0723.05843
SSB /WHK 07/12/2021
4'2"15
4'2"151'5"
3"13 1'6"131'11"1010'9"
12'0"5
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 0 plf at -1.41 to 32 plf at 0.00
TC: From 0 plf at 0.00 to 53 plf at 4.24
BC: From 0 plf at 0.00 to 19 plf at 4.24
TC: 40 lb Conc. Load at -1.41
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 134 /-/-/-/101 /-
D 23 /-/-/11 /-/-
C 58 /-/-/-/53 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.154
Max BC CSI:0.040
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:K7
Ply: 1
Qty:2
SEQN:176009 /HIP_
FROM:
Cust: R 761 JRef:1X707610001 T36 /
DrwNo:193.21.0723.05843
SSB /WHK 07/12/2021
4'2"15
4'2"151'5"
3"13 1'6"131'11"1010'9"
12'0"5
A
B
C
D
3.54 12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C1
Ply: 1
Qty:9
SEQN:175963 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T78 /
DrwNo:193.21.0723.06140
SSB /WHK 07/12/2021
1'
1'1'
4"1 9"11'1"138'1"
8'6"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C1
Ply: 1
Qty:9
SEQN:175963 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T78 /
DrwNo:193.21.0723.06140
SSB /WHK 07/12/2021
1'
1'1'
4"1 9"11'1"138'1"
8'6"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 60 /-/-/33 /36 /49
D 15 /-/-/8 /-/-
C 63 /-/-/43 /59 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
D Brg Width = 1.5
C Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 D 999 360
VERT(CL):0.004 D 999 240
HORZ(LL):-0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.073
Max BC CSI:0.006
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C1C
Ply: 1
Qty:1
SEQN:175987 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T46 /
DrwNo:193.21.0723.05812
SSB /WHK 07/12/2021
1'
1'1"8
1'1"8
2'1"8
1'1"8
3"13 9"14"12 1'1"1310'4"4
10'9"
11'2"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 60 /-/-/33 /36 /49
D 15 /-/-/8 /-/-
C 63 /-/-/43 /59 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
D Brg Width = 1.5
C Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.003 D 999 360
VERT(CL):0.004 D 999 240
HORZ(LL):-0.002 D - -
HORZ(TL):0.002 D - -
Creep Factor: 2.0
Max TC CSI:0.073
Max BC CSI:0.006
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C1C
Ply: 1
Qty:1
SEQN:175987 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T46 /
DrwNo:193.21.0723.05812
SSB /WHK 07/12/2021
1'
1'1"8
1'1"8
2'1"8
1'1"8
3"13 9"14"12 1'1"1310'4"4
10'9"
11'2"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C2
Ply: 1
Qty:6
SEQN:175964 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T79 /
DrwNo:193.21.0723.01954
JB /DF 07/12/2021
3'
3'1'
4"1 1'7"11'11"138'1"
9'4"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C2
Ply: 1
Qty:6
SEQN:175964 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T79 /
DrwNo:193.21.0723.01954
JB /DF 07/12/2021
3'
3'1'
4"1 1'7"11'11"138'1"
9'4"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C3
Ply: 1
Qty:2
SEQN:175965 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T38 /
DrwNo:193.21.0723.01671
JB /DF 07/12/2021
5'
5'1'
4"1 2'5"12'9"138'1"
10'2"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C3
Ply: 1
Qty:2
SEQN:175965 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T38 /
DrwNo:193.21.0723.01671
JB /DF 07/12/2021
5'
5'1'
4"1 2'5"12'9"138'1"
10'2"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C4
Ply: 1
Qty:10
SEQN:175966 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T89 /
DrwNo:193.21.0723.05297
SSB /WHK 07/12/2021
1'
1'1'
4"1 9"11'1"1310'9"
11'2"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 148 /-/-/142 /99 /44
D 10 /-1 /-/15 /11 /-
C -/-13 /-/30 /30 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.000 D - -
Creep Factor: 2.0
Max TC CSI:0.066
Max BC CSI:0.009
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C4
Ply: 1
Qty:10
SEQN:175966 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T89 /
DrwNo:193.21.0723.05297
SSB /WHK 07/12/2021
1'
1'1'
4"1 9"11'1"1310'9"
11'2"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C5
Ply: 1
Qty:5
SEQN:175967 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T42 /
DrwNo:193.21.0723.06578
SSB /WHK 07/12/2021
3'
3'1'
4"1 1'7"11'11"138'1"
9'4"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 191 /-/-/156 /99 /95
D 50 /-/-/28 /0 /-
C 63 /-/-/39 /70 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.077
Max BC CSI:0.067
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C5
Ply: 1
Qty:5
SEQN:175967 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T42 /
DrwNo:193.21.0723.06578
SSB /WHK 07/12/2021
3'
3'1'
4"1 1'7"11'11"138'1"
9'4"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 113 /-/-/73 /46 /74
C 55 /-/-/34 /6 /-
B 74 /-/-/49 /76 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.105
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C5A
Ply: 1
Qty:1
SEQN:175984 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T56 /
DrwNo:193.21.0723.06093
SSB /WHK 07/12/2021
3'
1"8
1"8
3'1"8
3'
4"1 1'7"18'1"
9'4"9
A
B
C
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 113 /-/-/73 /46 /74
C 55 /-/-/34 /6 /-
B 74 /-/-/49 /76 /-
Wind reactions based on MWFRS
A Brg Width = 1.5
C Brg Width = 1.5
B Brg Width = 1.5
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.002 C - -
HORZ(TL):0.003 C - -
Creep Factor: 2.0
Max TC CSI:0.105
Max BC CSI:0.094
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C5A
Ply: 1
Qty:1
SEQN:175984 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T56 /
DrwNo:193.21.0723.06093
SSB /WHK 07/12/2021
3'
1"8
1"8
3'1"8
3'
4"1 1'7"18'1"
9'4"9
A
B
C
5
12
2X4(A1)
07/12/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C6
Ply: 1
Qty:2
SEQN:175968 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T27 /
DrwNo:193.21.0723.01703
JB /DF 07/12/2021
5'
5'1'
4"1 2'5"12'9"138'1"
10'2"9
A
B
C
D
5
12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 261 /-/-/199 /128 /145
D 89 /-/-/50 /2 /-
C 117 /-/-/76 /126 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:20.00
TCDL:7.00
BCLL:0.00
BCDL:10.00
Des Ld:37.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.006 D - -
HORZ(TL):0.010 D - -
Creep Factor: 2.0
Max TC CSI:0.295
Max BC CSI:0.228
Max Web CSI:0.000
VIEW Ver: 20.02.00A.1020.21
Job Number:21-0651
/GROZA BUILDERS, INC. / /LATORTUGA /HOOD RESIDENCE
Truss Label:C6
Ply: 1
Qty:2
SEQN:175968 /JACK
FROM:
Cust: R 761 JRef:1X707610001 T27 /
DrwNo:193.21.0723.01703
JB /DF 07/12/2021
5'
5'1'
4"1 2'5"12'9"138'1"
10'2"9
A
B
C
D
5
12
2X4(A1)
07/12/2021
COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
07/12/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
07/12/2021COA #0 278