HomeMy WebLinkAboutInspection Docs File Copv
T L CIS ` `° r REVIEWED Fo-k
CODE C® PLIANCERECEIVED
Section A (Gene; al InformatiR� L CIE COUN'i'Gov 10 z021
I)BOCr�` /
C '/2/st.Lucia County
Master Permit No. Process No. Permitting
Contractors Name:AN l ,n License# C CC 3
Job Address �yg S �^�v�� G� �Df� S F
i'
ROOF CATEGORY
IrLow Slope ❑Mechanically Fa$tened Tile ❑Mortar/Adhesive Set Tiles
❑Asphaltic Shingles ❑Metal Panel/Shi Ilingles ❑Wood Shingles/Shakes
❑ Prescriptive ,BUR-RAS 150
ROOF ROOF TYPE.
❑ New roof ❑ Repair ❑ Maintenance (3 Reroofing ❑Recovering
.ROOF SYSTEM IN,IORMATION
Low Slope Roof Area (SF) 950 Steep Sloped Roof Area (SF) Total (SF) 3S�
Section B ( roof Plan)
iR
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
it
I
i
j .
i
I
I
i
Section C (Low Slope Roof)
Surfacing:
Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment:
manufacturer Zone 1':—" oc @ Lap,#Rows @ oc
(If a component is not used,identify as"NA") Zone 1:_.._." oc @ Lap,# Rows @ "oa
System Manufacturer: �n1yC�fSS Zone 2:_" oc @ Lap,#Rows @ °ao
Product Approval No.:
Zone 3:_.._." oc @ Lap,#Rows @ °oc
Number of Fasteners Per Insulation Board:
Design Wind Pressures, From RAS 128 Or Calculations: j Zone 1': Zone 1: Zone 2: Zone 3:
Zone 1':_Zone 1: Zone 2: Zone 3: Illustrate Components Noted and Details as Applicable:
Max. Design Pressure,from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping,
system: O
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing,Coping, Etc..
Deck: n Indicate: Mean Roof Height, Parapet Height, Height of Base
Type: ply y , 0 6 Flashing,Component Material,Material'Thickness, Fastener
Type,Fastener Spacing or Submit Manufacturers Details that
Gauge Thickness: / C� � Comply with RAS 111 and Chapter 16..
Slope:
Anchor/Base Sheet&No.df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material: j FT.
Insulation Base Layer:
Base Insultation Size and Thickness: S�y,E 11 Parapet
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
I
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Material:
Mean
Base Sheet(s)&No.of Ply(s): Roof
Base Sheet Fastener/Bonding Material: Height
Ply Sheet(s)'&No.of Ply(s): .
Ply Sheet Fastener/Bonding Material:
Top Ply: {-
i
Top Ply Fastener/Bonding Material: