Loading...
HomeMy WebLinkAboutApproved 6904 Santa Clara Blvd - Solar PV Plans i i i i 2' Gutter Ground Access Point 2' Gutter Ground Access Point 2' Gutter Inverter Type: Enphase IQ7PLUS-72-2-US Y Access Pathway PV Panel: (32) Silfab-SIL 360 NX R-2 0 Racking: Iron Ridge XR-100 ( ) ° Total Wattage: 11,520W # Modules 4 -COGEN Disconnect Roof Type: Composition Shingle Wind Load: 8 to 20 Deg Pitch: 20' Located adjacent to Fastener Type: Use Sunmodo NanoMounts o Utility meter Azimuth: 1 Sheet Index Utility Meter S-1 Cover Sheet/Site Plan O S-2 Detail E-1 One-Line 2' Gutter E-2 Electrical Code oz— S-IA Mounting Plan 17 General Notes: ° R-3 -Enphase IQ7PLUS-72-2-US Micro Inverters 7 1 # Modules (5) are located on roof behind each module. o -First responder access maintained and Pitch: 20 from adjacent roof. 2' Gutter—I 1 Azimuth: 181° 3'-3" -Wire run from array to connection is 40 feet. # Modules (23) Pitch: 20' Azimuth: 181° ® Layout Subject to Change Based on Site Conditions SOLAR BEARRESIDENTIAL&CO-ERCIAL EFFICIENCIES G\GENgEN�4 6101 Johns Rd Ste 8 5T"" FRONT OF HOUSE p. Godwin Engineering and Tampa, FL 33634 Design, LLC 8378 Foxtail Loop 727-471-7442 System meets the requirements of NFPA 70th Edition, Chapter 11.12 Install will be done to Manufacturer Spec Pensacola, FL 32526 Donnie C Godwin Meets All Editions of Florida Fire Prevention Code 2020 7th Edition Customer Info: D. Chad Godwin, PE 2021 .1 1 .1 0 Legend Meets all requirements of NFPA-1 7th Edition and NFPA-101 Chad@godwineng.com g � Chimney '00'06- 14:40:17 First responder access Satellite ❑0 Utility Meter O Vent Pipe Represents all Fire Clearance Ist Responder Access RUBEN MOLINA Date: 11/09/2021 PV Disconnect including Alternative methods minimum n�l N of 36" unobstructed as per Section R324 of the 2018 IRC 6904 SANTA CLARA BLVD Drawn by: x Meets the requirements of the following- (2020 FL Residential Code & FBC, 7th Edition (2018 International FORT PIERCE, FL Revised by: Residential Code) - 2nd Printing modified by the FL Building Standards, 2020 Florida Building Energy 34951 Rev #: 00 Conservation Code 7th edition, County of St. Lucie Code, 2017 National Electric Code.) Rev Date: Page: S-1 Compass for Aerial Solar Module 3f6— r x Ou rFE7C HERO 6-OLT 3f8-15 FLANGE "U T ��� 3—5/8 11 Ironridge XR-100 General Notes: (Optional) General Notes: - Sunmodo Nano Mount are secured to plywood decking - Sunmodo Nano Mount are secured to rafters 16 O.C. in Zone 1, @ 16 O.0 in Zone 2e, Install will be done to Manufacturer Spec @ @ 48" O.C. in Zone 1, @ 48" O.0 in Zone 2e, JGNAU OODy.i @ 16" O.C. in Zone 2n, @ 16" O.C. in Zone 2r & @ 24" O.C. in Zone 2n, @ 24" O.C. in Zone 2r, @ 16" O.0 in Zone 3 e Godwin Engineering and 9,S9,ATE oFo 11 • 1' • • Design, LLC @ 24 O.0 in Zone 3e & @ 24 O.C. in Zone 3r -No Mounts to be Installed in Zone 3r µo 8378 Foxtail Loop using 5/16" x 4.75" stainless steel Lag bolts. using (4) #6.3mm x 76.2mm stainless steel Lag bolts. Pensacola, FL 32526 Donnie vCuGodwin - Subject roof has One layer. - Sub•ect roof has One layer. D. Chad Godwin, PE 2021 .11 .10 j y Chad@godwineng.com - All penetrations are sealed. - All penetrations are sealed. '00'06- 14:40:31 Roof Section Pitch Roof Rafter and Spacing Overhang Notes: R 1 -R3 4/12 2"x4" @ 24 O.C. 12" Truss SOLARp IAI BEAR -Roof Height 15' Customer Info• 6101 Johns Rd, Ste 8 g Inverter Type: Enphase IQ7PLUS-72-2-US Tampa, FL 33634 -Per 2020 FBC, the Roof Mounted PV System PV Panel: (32) Silfab-SIL 360 NX 727-471-7442 will be subject to the following design criteria: Racking: Iron Ridge XR-100 RUBEN MOLINA Date: 11/09/2021 Design Wind Speed(Vult) - 160mph 3 sec gust, Total Wattage: 11,520W 6904 SANTA CLARA BLVD Drawn by: RM Exposure Category - C Roof Type: Composition Shingle Wind Load: 8 to 20 Deg FORT PIERCE FL Revised by: Rev #• 00 -Designed as per ASCE7-16 Fastener Type: Use Sunmodo NanoMounts 34951 Rev Date: Page: S-2 Enphase Output Ckt Per String To Overcurrent Protection Device Photovoltaics: AC Max Output Current 13.31 Enphase IQ Trunk Cable (32) Silfab-SIL 360 NX AC Max Output Current * 1.25% 16.6 Q-12-240 Overcurrent Protection A 20 #12AWG THHN-THWN-2 No. of Current Carrying Cond <4 UL 9703 Inverters: Conductor Gauge(AWG) 10 (32) Enphase IQ7PLUS-72-2-US Micro Inverters Enphase Total Output Ckt Grounding Conductor Circuits: AC Max Output Current 38.72 Romex shall be used for interior building Fto be bare#8 Awg 2 circuits of 11 Modules AC Max Output Current* 1.25% 48.4 and attic runs only. Do not use romex in O ( )(1) circuit of(10) Modules Overcurrent Protection(A) 50 conduit or outdoor environments. NEMA 3R No. of Current Carrying Cond <4 Junction Box Roof Maximum Inverters Per 20A Circuit (13) Conductor Gauge (AWG) 6 #12 Romex for Home runs under 100' Black-L1 #10 Romex Cable for Home runs over 100' Red-L2 NEC LABEL NOTES: (1)Line 1 Green-Ground 1. THE WARNING SIGN(S)OR LABEL(S)SHALL COMPLY (1)Line 2 WITH NEC 110.21(B) Per Circuit 2. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT (1)EGC WHERE THEY ARE INSTALLED. 3. LABELS TO BE A MIN LETTER HEIGHT OF 3/8"AND WARNING PERMANENTLY AFFIXED. ELECTRIC SHOCK HAZARD Meter 4. LABELS SHALL ALSO COMPLY WITH THE SPECIFIC DO NOT TOUCH TERMINALS. REQUIREMENTS OF THE AUTHORITY HAVING TERMINALS ON BOTH THE LINE AND JURISDICTION. LD LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION O Main Distribution Panel 200A Main • • gava • Line Side Tap RATED AC OUTPUT CURRENT: 38.72A NOMINAL OPERATING VOLTAGE: 240VAC Manual Lockable Disconnect 60A Service Rated Fused Disconnect o n n i e C Enphase Combiner Box Neutral to Ground Bond AC Disconnect O``�ONp:0'GOpr''i (1)-2oA Breaker 5oA Fuse Godwin Engineering and } \�ENSPh�' Per Circuit Design, LLC Godwin ;* : *; ' No 81360 3C2c4uoiV 8378 Foxtail Loop 2021 .11 =9- S9. STATE OF :�� 10/15A Breaker for Envoy Located Adjacent to Utility Meter N 'P% F Disconnect Pensacola, FL 32526 10 S , #6 AWG THWN Solar Combiner Box #6 AWG THWN D. Chad Godwin PE THIS ITEMMASSEENE E RONIGA«. #X-IQ-AMl-240 (1)Line 1 (1)Line 1 ' GOGGWMUSING oGI ALSGNATURE"AND (i Line tral (1)Line 2 Chad@godwineng.com 14:40:41 AND„ow„sIpEREos�„EpA„sE E (1)Neutral 1 1 ` THESIGNATUREMUSTBEVERIFIED0 #8(1)EGC 00 0V— ANrE�EGTRGNIGGGRIEs in @least 3/4"Conduit Typically in @ least 3/4"Conduit Typically In Compliance with NEC 705.12(B) Refer to NEC 312.8 for Conditions taps v switch SOLAR BEAR and over current devices Enclosures. RFsoFNTA.s oMMFRA�FFFIER�IF: If the conditions are not met a tap box will 6101 Johns Rd Ste 8 System meets the grounding requirements of NEC 690.43 need to be installed and revision com feted. Tampa, FL 33634 Including the label below GEC NOTES Customer Info• Note: - Ungrounded system per 690.41(A)(4) 727-471-7442 -All wiring to meet the 2017 NEC and - GEC must be installed per 250.64 Date• 11/09/2021 - GEC must be continuous un-spliced or irreversibly spliced from In Case of Emergency Call Florida electric codes. inverter to existing service ground system or continuous from the RUBEN MOLINA RM Inverter Type: Solar Bear 60A Disconnect Drawn b arrays to the existing service ground system. y Enphase IQ7PLUS-72-2-US - GEC must be min#8 AWG and installed in conduit 6904 SANTA CLARA BLVD Revised b • PV Panel: at 727-471-7442 -Type of conduit to be determined - If GEC is not in conduit,it must be#6 min FORT PIERCE FL Rev #• 00 silfab-s i 36o Nx EC #: EC 13006630 on site by contractor. Disconnects will be Visible,lockable,adjacent to and within 10'of utility meter 34951 Rev Date: Total Wattage: All Labels&Markings for photovoltaic system will be 11,520W Meets 11.12.2.1.5 Install will be done to Manufacturer Spec reflective and meet all requirements for NFPA 11.12 Page: E-1 The Placard shall be permanently -A placard will be added with Enphase Total Output Ckt REEMEMERGENCY RESPONDER riveted...,and shall be made of red, instructions and locations to beSOLAR PV SYSTEM IS weatherproof,hard plastic,with in compliance with 690.12, To Overcurrent Protection Device EQUIPPED WITH RAPID SHUTDOWN engraved white block lettering. 690.56(B)and NEC 705.10 Design Temperature(OF) 94 TURN RAPID SHUTDOWN Max Ambient Temp. Range °F 87-95 310. B 2 A R N I N SWITCH TO TH In compliance with NEC 1 sO( �(a� POSITION TO SHUTT DOWN Rapid Shutdown Built in Temp.Rating of Conductor 750C ELECTRIC SHOCK HAZARD THE ENTIRE PV SYSTEM. Per Code NEC 690.12 250.58,NEC 690.8, <4 310.15 a DO NOT TOUCH TERMINALS. NEC 250.24 No. of Current Carrying B Cond ( )(3)O AND LOAD SIDES MAY H THE LINE ENERGIZED AC Max Output Current 38.72 690.8(A)(3) IN THE OPEN POSITION. 690.17E NEC690.56(C)(1)AND NFPA111.12.2.1.1.1.1,11.12.2.1.4 PV AC disconnect is Coductors have a min AC Max Output Current* 1.25% 48.4 690.8(B) lockable in the open position apacity of 60 amperes Overcurrent Protection(A) 50 NEC 690.35 per code NEC 705.22(6) Per Code NEC 230.79(D) Amb. Temp Correction Factor 0.94 310.15(B)(2)(a) Z�WARN I N Raceway Fill Adjustment Factor 100% 310.15(B)(3)(a) Everything will be built to Code without all Specifics labeled on plan Cond. Gauge AWG 6 310.15(B)(16) THIS SERVICE METER Cond.Allowable Ampacity(Amps) 65 § IS ALSO SERVED BY A System is in complaince with FFPC 1:11.12 7th Edition. Cond.Adjusted Ampacity(Amps) 61.1 65*.94*1=61.1 PHOTOVOLTAIC SYSTEM Smoke Detectors will be added as per FBC 553.883 All Exterior equipment is A minimum of Nema-R3 Rated 705.12(B)(3) In compliance with 230.71 All Interactive System(S) Points of interconnection ! Markings shall placed on all Conduits, Combiners, with other sources shall be marked at an accesible Combiner box in compliance WARN ING:PHOTOVOLTAI MEW Raceways,Enclosures, ures,Junction Bo Boxes,and Cable Assemblies location at the disconnecting means as a power Per Code NEC 705.12 POWER SOURCE POWER SOURCE at every 10',turns,and above and below penetrations in source and with the rated ac output current and the 3* 20A< 125A OUTPUT CONNECTION compliance with NFPA nominal operating AC voltage. Per NEC 690.54 * DO NOT RELOCATE THIS p g 9 No other loads to be added SOLAR PV SYSTEM EQUIPPED OVERCURRENT DEVICE TEXT WITH RAPID SHUTDOWN Disconnect means shall be provided for all Disconnect is in compliance 230.72 Permanent sticker added to disconnect 3/81N MIN. 705.12(B)(2)(3)(b) disconnecting all ungrounded conductors that supply or ass throu ht the building or structure Per Code TURN RAPID p g g In Case of Emergency Call SHUTDOWN SWITCH T 2017 NEC Section 225.31 & Section 225.32 Supply side disconnect adjacent to Msp Solar Bear Apply to Main Disconnect 3/16 IN MIN.TEXT THE"OFF" DOWN POSITION TAN 8 AWARNIN SHUTat 727-471-7442 SYSTEM AND REDUCE PHOTOVOLTAIC POWER SOURCE E04. Construction documents specify PV system circuits EC#:EC13006630 SHOCK HAZARD IN THE Over Current Protection Device is "Next size up" ARRAY. installed on or in buildings include a rapid shutdown function Based on Inverter Maximum Continuous Output NEC 690.31 (G)(3) that controls specific conductors in accordance with NEC Current Rating 2017 NEC 240.4(B) Line Side Tap will be done in Main Distribution Panel inside of home article 690.12. Figure 690.56(C)(1)(a) Label for PV Systems that E05.These construction documents specify that a label is equipment-All new e ui ment Labels will be placed Shut down the array and the conductors leaving the array located adjacent to In the correct location -Markings Shall Be reflective,Weather Resistant and suitable for the environment. provided with the method to initiate rapid shut down per Per Code NEC 690.56(B) -Markings Shall be red with white lettering with minimum 8"Capital Letters DUAL POWER SUPPLY 690.12(4). Meter on exterior wall SOURCES:UTILITY GRID AND Donnie C 690.56(C) &690.53 Note: PV SOLAR ELECTRIC SYSTEM Godwin Engineering and `ONPD E06. Construction drawings specify buildings or structures Metallic conduits, raceways or flexible metal conduit g g Godwin �.`�,,� �EIVgF., with both utility service and a PV system,complying with NEC exceeding6 feet in length are not permitted in accordance -Subject PV Systems has been designed No a,asc 9 p Design, LLC e*. article 690.12 shall have a permanent plaque or directory with NEC article 690.31(G). to meet the requirments of the NEC 2017, INVERTER OUTPUT CONNECTION: 2021 .11 . DO NOT RELOCATE THIS 8378 Foxtail Loop '9 STATE OF including the following wording: "PHOTO VOLTAIC SYSTEM and those set forth by the Florida Solar =0• 4o Include required label for metallic raceways and conduits to Energy Center Certification, Including OVERCURRENT DEVICE O EQUIPPED WITH RAPID SHUTDOWN"as per NEC article Pensacola FL 32526 P , 690.56(C). sheet E-1 per NEC article 690.31(G)(3). D. Chad Godwin PE 1- Maximum Number of Module Strings, ! WARNI , '"��Eo�sE�Eoa.�10E'��Ao Add required label to sheet E-1 per NEC article 705.10. 1 4:40:5 a°-,";ES°EPEs FSTMGs a�- E07. Construction documents specify PV power circuit labels Maximum number of modules per string, POWER SOURCE OUTPUT CONNECTION: Chad@godwlneng.com AND ° ON shall appear on every section of the wiring system that is Include required label to sheet E-1 per NEC article 705.12(B) Maximum Output, Module Manufacturer and DO NOT RELOCATE THIS OVERCURRENT ^"°E E°^°"°�PEs separated by enclosures,walls, partitions,ceilings, or floors. OO O6- Photovoltaic AC disconnect shall be capable of being locked model number, inverter manufacturer and model WAR E08. Construction documents specify all warning sign(s)or in the open position per NEC article 705.22(6). number, as applicable. DEDICATED SOLAR PANE labels)shall comply with NEC article 110.21 (B). Label NOT CONNECT ANY Photovoltaic AC Overcurrent protection shall be located NEC 705.10 A permanent plaque or directory,denoting the location of LOADS warnings shall adequately warn of the hazard. Labels shall be within 10 feet of the point where conductors are connected to all electric power source disconnecting means on or in the premises,shall permanently affixed to the equipment, and Labels required the service per NEC 705.31. be installed at each service equipment location and at the location(s)of TOVOLTAIC S SOLAR BEAR shall be suitable for the environment. the system disconnect(s)for all electric power production sources capable EQUIPPED WIT .E.G-AL_.....R-L Ell-E-ES of being interconnected.One sign required for each PV system. RAPID SHUTDOWN 6101 Johns Rd, Ste 8 Plans Satisfy NEC 250.94&NEC250.53(A)(2) System meets the grounding requirements of NEC 690.43 Tampa, FL 33634 GEC NOTES Customer Info: Note: - Ungrounded system per 690.41(A)(4) 727-471-7442 -All wiringto meet the 2017 NEC and - GEC must be installed per 250.64 Date• 11/09/2021 - GEC must be continuous un-spliced or irreversibly spliced from In Case of Emergency Call Florida electric codes. inverter to existing service ground system or continuous from the RUBEN MOLINA RM Inverter Type: Solar Bear Drawn b arrays to the existing service ground system. y Enphase IQ7PLUS-72-2-US 60A Disconnect - GEC must be min#8 AWG and installed in conduit 6904 SANTA CLARA BLVD Revised b • PV Panel: at 727-471-7442 -Type of conduit to be determined - If GEC is not in conduit,it must be#6 min FORT PIERCE FL (32) EC #: EC 13006630 Disconnects will be Visible,lockable,adjacent to Rev #: 00 Silfab-SIL 360 Nx on site by contractor. and within 10'of utility meter 34951 Rev Date: Total Wattage: All Labels&Markings for photovoltaic system will be 11,520W Install will be done to Manufacturer Spec reflective and meet all requirements for NFPA 11.12 Page: E-2 OL — Proposed Mounting locations 42'-3" 421-311 Iron Ridge Rail XR-100 17' 2 0 0 0 0 1 Q 0 XR-100 14' 15 16�_2n O O L O- O L O 17�-1On 0 L 0 0 L 0 7- O O Q = R-1 R-2 Splice Bar 6 2' Gutter 2' Gutter # Modules (4) 2' Gutter Sunmodo Nano Mounts 68 # Modules (23) Iron Ridge UFO's 76 Pitch: 20° Pitch: 20° Iron Ridge Sleeves/End Caps 24 Azimuth: 181° Azimuth: 1° 3'-311 Combiner 3 Iron Ridge Ground Lugs 6 Silfab-SIL 360 NX 32 6'-011 Enphase IQ7PLUS-72-2-US 32 12'-911 Plans satisfy zones FBC-1510.7.1 60A Fused Disconnect 1 Install will be done to Manufacturer Spec 50A Fuses 2 R-3 ``GNpD OOp(yp. 20A Breakers 3 © ',:. No 8136D :. Enphase Combiner Box 1 �� o © # Modules (5) Godwin Engineering and 13 -1 L Pitch: 200 Design, LLC Azimuth: 181° 8378 Foxtail Loop µo am„E.po,«oaEs a Pensacola, FL 32526 Donnie C Godwin D. Chad Godwin, PE 2' Gutter Chad@godwineng.com 2021 .1 1 .10 Zone 1 & 2e:Max cantilever is 16" as per manufacturer spec '00'06- 14:41 :22 Max Cantilever = Max Span * 6)=48"*(3)=16" Zone 2n, 2r, 3e & 3r: Max cantilever is 8" as per manufacturer spec. Max Cantilever = Max Span * (3)=24"*(3)=8" SOLAR REAR Customer Info: 6101 Johns Rd, Ste 8 Inverter Type: Enphase IQ7PLUS-72-2-US Tampa, FL 33634 PV Panel: (32) Silfab-SIL 360 NX 727-471-7442 Racking: Iron Ridge XR-100 RUBEN MOLINA Date: 11/09/2021 Total Wattage: 11,520W 6904 SANTA CLARA BLVD Drawn by: RM Roof Type: Composition Shingle FORT PIERCE, FL Revised by: Wind Load: 8 to 20 Deg 34951 Rev #: 00 Fastener Type: Use Sunmodo NanoMounts Rev Date: Page: S-1 A Electrical Specifications SIL-360 Test Conditions STC NOCT Module Power(Pmax) Wp 360 258 ���� Maximum power voltage(Vpmax) V 36.6 33.1 Maximum power current(lpmax) A 9.9 7.8 �� Open circuit voltage(Voc) V 44.5 40.4 I \� , ' NXShort circuit current(Isc) A 10.5 8.2 S " If a Module efficiency % 19.7 17.6 Maximum system voltage(VDC) V 1000 SOLAR Series fuse rating A 20 Power Tolerance Wp 0 to+10 Measurement conditions:STC 1000 W/m2•AM 1.5•Temperature 25'C•NOCT 800 W/m=•AM 1.5•Measurement uncertainty<3% a.A •Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by 0 to+10W. AUxOMATEO ..°nM Temperature Coefficient Isc +0.064%/°C Temperature Coefficient Voc -0.28%/°C Temperature Coefficient Pmax -0.36%/°C NOCT(±2°C) 46°C OperatingINDUSTRY LEADING WARRANTY Mechanical temperats and ure Components •-4o/ moo , All our products include an industry Metric Imperial leading 25-year product workmanship Module weight 20±0.2 kg 44±0.4lbs and 30-year performance warranty. Dimensions(H x L x D) 1832 mm x 1000 mm x 38 mm 72.13 in x 39.4 in x 1.5 in a D Maximum surface load(wind/snow)* 4000 Pa rear load/5400 Pa front load 83.5/112.8 Ib/ftA2 35+YEARS OF SOLAR INNOVATION Hail impact resistance o 25 mm at 83 km/h o 1 in at 51.6 mph g y Leveraging over 35+ ears of worldwide Cells 66-Si mono-PERC-5 busbar 66-Si mono-PERC-5 busbar 158.75 x 158.75 mm 62.25 x 62.25 in experience in the solar industry,Silfab Glass 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, is dedicated to superior manufacturing DSM anti-reflective coating DSM anti-reflective coating Cables and connectors(referto installation manual) 1200 mm o 5.7 mm,MC4 from Staubli 47.2 in, o 0.22(12AWG),MC4 from Staubli processes and innovations such as Bifacial and Back Contact technologies, Backsheet High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, fluorine-free PV backsheet to ensure our partners have the latest in Frame Anodized Aluminum(Black) ® solar innovation. Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box UL 3730 Certified,IEC 62790 Certified,IP67 rated NORTH AMERICAN QUALITY •/ NX mono ' RC • Silfab is the leading automated solar Module product workmanship warranty 25 years** module manufacturer in North America. Linear power performance guarantee 30 ears1. p p g >_97.1%end 151 year >_91.6%end 12 h year >_85.1%end 25th year >_82.6%end 301h year, Utilizing premium quality materials and _ _ = strict quality control management to deliver ULC ORD C1703,UL1703,CEC listed***•UL 61215 1/1 1/2,UL 61730 1/2, e the highest efficiency,premium quality Product IEC 61 21 5-1/-1-1/-2***.IEC 61730-1/-2***,CSAC22.2#61730-1/-2,IEC62716 PV modules. Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed UL Fire Rating:Type 2 Factory IS09001:2015 .3 All states except California California eee Modules Per Pallet:26 eee Modules Per Pallet:26 1.5"[36mm] _ H.Pallets Per Truck:34 ee Pallets Per Truck:32 e o .:e Modules Per Truck:884 .ee Modules Per Truck:832 E • D,.inage(x8) E N *A Warning.Read the Safety and Installation Manual for mounting specifications and before handling, m umng Hae(m)N installing and operating modules. S - **12 year extendable to 25 years subject to regis- tration and conditions outlined under"Warranty'at o • •, • _ • • • • 1 1 • ,• • • • •, www.silfabsolar.com. 'ff E - • • �-•. • • • • • • • • progress. e ***Certification and CEC listingin • • • • ,• •, • • •• • • • • PAN files generated from 3rd party performance s E • • data are available for download at: N E 3 www.siIfabsolar.com/downloads. _ ' " C • • • • • • •- • - -• • • ••. - • •.• • • • • • •• • E o o •.• •. • • • �111• • • •. • • • • • • .• -• • •• • C C ° Silfab Solar Inc. • • •. • :1 _ i 240 Courtneypark Drive East 1.02"[26mm] } o Mississauga ON L5T2Y3 Canada • • • • • • • S i I fa b Tel+1 905-255-2501 1 Fax+1 905-696-0267 04.2..(x2) Grounding H.I. ar SOLAR info@silfabsolar.com I www.silfabsolar.com 910 ® Silfab Solar Inc. 39.37"3 [100 mm] o 37" 000mm] 800 Cornwall Ave _ Bellingham WA 98225 USA Tel+1 360-569-4733 Data Sheet Enphase IQ 7 and IQ 7+ Microinverters Enphase Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Region:AMERICAS Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V Max DC short circuit current(module Isc) 15 A 15 A The high-powered smart grid-ready Overvoltage class DC port II II Enphase Enphase IQ 7 MicroW and Enphase IQ 7+ MicrOTM DC port backfeed current 0 A 0 A Q 7 a n d I Q 7 dramatically simplify the installation process while PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit achieving the highest system efficiency. OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Microinverters Part of the Enphase IQ System,the IQ 7 and Peak output power 250 VA 295 VA p y Maximum continuous output power 240 VA 290 VA IQ 7+ Microinverters integrate with the Enphase Nominal(L-L)voltage/range2 240 V/ 208 V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V IQ Envoy'M, Enphase IQ BatteryTM, and the Enphase Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Enlighten TMmonitoring and analysis software. Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz IQ Series Microinverters extend the reliability AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms standards set forth by previous generations and Maximum units per 20 A(L-L)branch circuit3 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III undergo over a million hours of power-on testing, AC port backfeed current 0 A 0 A enabling Enphase to provide an industry-leading Power factor setting 1.0 1.0 warranty Of up to 25 years. Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Easy to Install Connector type(IQ7-60-2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) Connector type(IQ7-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). • Lightweight and simple Adaptors for modules with MC4 or UTX connectors: • Faster installation with improved,lighter two-wire cabling PV2 to MC4:order ECA-S20-S22 -PV2 to UTX:order ECA-S20-S25 • Built in rapid shutdown compliant(NEC 2014&2017) Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Productive and Reliable Cooling Natural convection-No fans Approved for wet locations Yes • Optimized for high powered 60-cell and 72-cell*modules Pollution degree PD3 • More than a million hours of testing Enclosure Class II double-insulated,corrosion resistant polymeric enclosure • Class II double insulated enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor • UL listed FEATURES Communication Power Line Communication(PLC) FNPHASE 4� Monitoring Enlighten Manager and MyEnlighten monitoring options. ' - Smart Grid Ready Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break h+ Complies with advanced grid support,voltage and disconnect required by NEC 690. frequency ride through requirements Compliance CA Rule 21 (UL 1741-SA) 1990 Mug • Remotely updates to respond to changing UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, grid requirements CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and • Configurable for varying grid profiles NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC • Meets CA Rule 21 (UL 1741-SA) and DC conductors,when installed according manufacturer's instructions. U *L The IQ 7+Micro is required to support 72-cell modules. 1.No enforced DC/AC ratio.See the compatibility calculator at httos://enphase.com/en-us/support/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. ® 0=� E N P H AS E To learn more about Enphase offerings,visit enphase.com E N P H AS E. To learn more about Enphase offerings,visit enphase.com �./ �./ ©2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 Data Sheet Enphase IQ Combiner 3 Enphase Networking MODEL NUMBER IQ Combiner 3 X-IQ-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy"printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-M1 (4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Enphase The Enphase IQ Combiner 3T" with Enphase Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). IQ EnvoyT" consolidates interconnection Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. IQ Combiner 3 into a single enclosure and BRK-10A-2-240 Circuit breaker,2 pole,10A,Eaton BR210 equipment g BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 (X-I AM1-240-3) g y BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 Q- streamlines PV and storage installations b EPLC-01 Power line carrier(communication bridge pair),quantity 2 providing a consistent, pre-wired solution for XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) residential applications. It offers up to four XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS 2-pole input circuits and Eaton BR series Rating Continuous duty busbar assembly. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Smart Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy • Includes IQ Envoy for communication y MECHANICAL DATA L and control Flexible networking supports Wi-Fi, Dimensions(WxHxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets). 1 1 Ethernet,or cellular Weight 7.5 kg(16.5 Ibs) • Optional AC receptacle available for PLC Ambient temperature range 40°C to+46°C(40°to 115°F) 11! bridge Cooling Natural convection,plus heat shield • Provides production metering and optional Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction ,I consumption monitoring Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors I 60 A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors I' Simple Neutral and ground: 14 to 1/0 copper conductors h r Always follow local code requirements for conductor sizing. Reduced size from previous combiner Altitude To 2000 meters(6,560 feet) • Centered mounting brackets support single INTERNET CONNECTION OPTIONS stud mounting Integrated Wi-Fi 802.11b/g/n • Supports back and side conduit entry Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) • Up to four 2-pole branch circuits for 240 VAC Cellular Optional,CELLMODEM-01 (3G)or CELLMODEM-03(4G) or CELLMODEM-M1 (4G based LTE-M) �I plug-in breakers(not included) (not included) • 80 A total PV or storage branch circuits COMPLIANCE Compliance,Combiner UL 1741 CAN/CSA C22.2 No.107.1 Reliable 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) • Durable NRTL-certified NEMA type Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 3R enclosure UFive-year warranty *Consumption monitoring is required for Enphase Storage Systems. o ` UL listed To learn more about Enphase offerings,visit enphase.com LISTED E N P H AS E ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H A S E To learn more about Enphase offerings,visit enphase.com �./ 2018-09-13 %.0# /lam IRONRIDGE XR Rail Family XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific Solar Is Not Always Sunny design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, fgrl but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing ; i enough to buckle a panel frame. XR Rails are the structural backbone preventing ,z XR10 XR100 XR1000 these results. They resist uplift, protect against buckling and safely and efficiently ®�®® � XR10 is a sleek,low-profile mounting XR100 is the ultimate residential XR1000 is a heavyweight among transfer loads into the building structure. ®� �® rail,designed for regions with light or mounting rail. It supports a range of solar mounting rails.It's built to handle Their superior spanning capability / ® ® � no snow.It achieves spans up to 6 feet, wind and snow conditions,while also extreme climates and spans up to 12 Q �®requires fewer roof attachments, while remaining light and economical. maximizing spans up to 10 feet. feet for commercial applications. e�/���� reducing the number of roof 6'spanningcapability 10'spanningcapability 12'spanningcapability penetrations and the amount ®� Moderate load capability Heavy load capability Extreme load capability Clear&black anodized finish Clear&black anodized finish Clear anodized finish of installation time. y Internal splices available Internal splices available Internal splices available ® ® Rail Selection I ® The table below was prepared in compliance with applicable engineering codes and standards.* Values are based on the following criteria:ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 & 2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. \ Force-Stabilizing Curve 90 Sloped roofs generate both vertical and lateral 120 forces on mounting rails which can cause them None to bend and twist.The curved shape of XR Rails 140 XR10 XR100 XR1000 is specially designed to increase strength in both directions while resisting the twisting.This unique 160 feature ensures greater security during extreme weather and a longer system lifetime. 90 120 � 20 140 160 9 30 0 160 Compatible with Flat&Pitched Roofs Corrosion-Resistant Materials 90 XR Rails are IronRidge offers All XR Rails are made of 6000-series 40 compatible with a range of tilt leg aluminum alloy,then protected with an , 160 FlashFoot and options for flat anodized finish.Anodizing prevents surface other pitched roof ■■■ roof mounting and structural corrosion,while also providing . I 80 160 attachments. applications. a more attractive appearance. 120 160 'Table is meant to be a simplified span chart for conveying general rail capabilities.Use approved certification letters for actual design guidance. GODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop, Pensacola, FL 32526 1 (850)712-4219 1 chad@godwineng.com November 10,2021 To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: Molina-Residential PV Roof Mount Installation 6904 Santa Clara Blvd Fort Pierce, FL 34951 Plan Reviewer, This letter is regarding the installation of a new roof mounted Solar PV System on the existing residential structure at the address above. I have reviewed the attachment plan and have determined that the roof mounted PV system is in compliance with the applicable sections of the following Codes as amended and adopted by the jurisdiction: 2020 Florida Building Code 71h Edition,FBC ASCE 7 Min. Design Loads for Buildings&Other Structures Per 2020 FBC,the Roof Mounted PV system will be subject to the following design criteria: Design Wind Speed(V,,,t) - 160mph 3sec gust, Exposure Category- C The PV System consist of the modules,railing,and connection hardware.The system will add a dead load of approximately 3 psf to the roof. The existing roof covering is Asphalt Shingle with min. 1/z" plywood decking and 2"x 4" roof trusses 24" O.C. The roofing,decking,and roof trusses are in good condition.The existing structure will be adequate for supporting the additional PV dead load and wind loads. The securement method of the PV system is to be flush mounted to the asphalt shingle roof with the Ironridge railing and Sunmodo NanoMounts.The attachments can be attached up to 48"apart in roof zone 1 &2e,and roof zones 24"apart in roof zones 2n, 2r, 3e,&3r.The mounts should be staggered,where possible,to allow distribution of the design loads evenly to the structure.The mounts shall be installed with a min. 5/16"lag screw with minimum 2-5/16"thread length. Please see attached documents and contact me should you have any questions. Sincerely Donnie C : No 81360 _- Godwin - , �•. STATE OF .:UJ D. Chad Godwin, PE 81360 ;o 4 Exp. 02/28/2023 2021 .1 1 .1 0 eSS1ONAI E 0� '00'06- 14.41 •3/7 THIS ITEM AS BEEN ELECTRONICALLY SIGNED ANDSEALED BY DONNIE CHAD GODWIN USING A DIGITAL SIGNATURE AND DATE.PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES ASCE 7-16 CHAPTER 29 WIND LOADS-Rooftop Solar Panels Minimum Design Loads-Part 1:Enclosed(Gable,Hip,Flat h<60ft,0°<6<45°) Wind Load Parameters-Inputs Wind Load Paramaters Risk Category II Table 1.5-1 Wind Speed(asd) 124 mph FRC R301.2.1.3 Basic Wind Speed(Ult) 160 mph Figure 26.5-1B Effective Wind Area 19.72 It' 26.20 Roof Angle 8'to 20' Wind Directionality Kd 0.85 Table 26.6-1 Roof Type Gable Topographic factor Ka 1.00 26.8 or 26.8.2 Exposure Cat. B,C,or D C Section 26.7 Ground Elevation Factor K, 1.00 Table 26.9-1 Mean Roof Height h 15.00 ft Velocity Exposure Coefficient K, 0.85 Table 26.10-1 Roof attachment 4.75"Lag Screw Array Edge Factor yr 1.50 29.4.4 "Modules are considered Exposed Rafter/Truss Spacing 24 in O.C. Solar Panel Equalization Factor y, 0.68 Fig.29.4-8 No.of Rails 2 Velocity Pressure ch 28.41 psf qh=0.00256 K,K„Kki No.of Modules-Portrait 30 Added Safety Factor 1.2 No.of Modules-Landscape 2 Allowable Pullout per mount 859.2 Ibs Module Model Number SIL-360 NX 0.4h or 0.6h 6.00 ft Flat-0.6h,Gable,Hip-0.4h bldg.least horizontal dim(typ.) 180 10%of least horizontal dim 1.50 ft to%orlepnnor.o;m.-Ah, hi-,.er;::maoec butno1-man eith--fuarthm.or Elevation <5000 ft Roof Zone Set Back a 3.00 ft arc.(n,r roof-o.6h) Est.#of attachment points 68 h2 5 in rva>unp(p-1 he;thr,-roof) PV Dead Load Module and Racking Speas 2h2 30 in mmd):xa"re array,han be from me rom edge Gable Rdfge,or h;pi-ii #of Modules 32 Dimensions,LxWxH(in) ��9732x 9.37 x 1.5 0.25 in mp rw- eis der nof>s.7ft Module W- 44 Ibs Width ft all 1.00 ft eor,:ornai d,.ea"reo g ip ei edge Array W-d, 1408 Ibs Length ft d2 0.25 ft rvorao"fai d�.fa"re from g p-lI.me pearen edg-me pe;a row Micro/optimizer W- 128 Ibs Module Area ft` O.Sh 7.S0 ft -ed-e PV Rail Wwn;; 23 Ibs Module load ratings Notes Total Weight W- 1559 Ibs Ultimate Allowable Total Area AT 631.06 ftz Load Rating-Snow(psf) 113.4 75.6 Eq.1 Point Load=Roof Zone psf TA Dead Load D,, 2.47 psf Load Rating-Wind(psf) 1 -84 1 -56.0 Eq.2 TA=(Module Length/2)*Max Span Weight/attachment 22.9 Ibs Eq.3 "Max span Equation,SF=Allowable pullout/Point Load PVAttachni-Results Eq.4 Max Span=Allowable Pullout/(SF'Roof Zone psf•L/2) Roof Zones-Gable 8°to 20° 1 2e 2, 2n 3e 3r a)The Max span between attachment points must not exceed the rail spans provided by racking manufacture. GCp-Uplift -2.0 -2.1 -2.6 -2.6 =22"S GCp-Down 0.5 0.5 0.5 0.5 b) Allowable Module load ratings are determined by SF=1.5 P=9h(GCp)(7'g)�7',) -55.7 -55.7 -73.1 -73.1 psf 29.4-7 P=gn(GCp)(yr)(y,) 14.5 14.5 14.5 14.5 psf 29.4-7 Max Allowable Span 4 4 2 2 ft "notes Max Cantilever(in) 16 16 8 8 8 8 Max span 33%(in) Donnie C Godwin, No 81360 2021 .1101 STATE OF :��/` 14:41 :46 0 ,,SS1111111i THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY DONNIE CHAD AND SEALED `//�' GODWIN USING A DIGITAL SIGNATURE AND '00'0DAT.PRINTED COPIES OF THIS DOCUMENT ARENOTC V ANDTHESGNAITERE MUSTEEDVERFIEDON ANY ELECTRONIC COPIES