Loading...
HomeMy WebLinkAboutCreekside Lot 113 Code 172.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: ��eI-zez/ Permit No. Project: 3��� /G0©1067'0002 (6ecek_-5/Gv) Address: ��/2 POTD'ElaC Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural �J Service/Ground I Storm Piping & Test I I Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: -'�AW 5;qv7le��_, (17Z) Inspection Results:,kAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 1/F1� y/sD BUrI/O/ ®� SHvT/ LS �cJ c.✓+/t/1�E 2. 3. 4. 5. 6. 7. Inspector's Name: -/U1W �' ill �6G' Lic.#: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com