Loading...
HomeMy WebLinkAboutCreekside Lot 112 Pre Power.pdfg]UNIVERSAL& ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: [ ! Permit No. of Z6 Project: C, u i/l Address: C� T✓ Check one: Regular Inspection: f 1� ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping &Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: (06" r.�-p- r C%lA . Inspection Results: AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed )-Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: �! %%/" — Lic.#: /�/i/ 7? S OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com