Loading...
HomeMy WebLinkAboutConcrete Drawings1. IN SOME CASES, THE PRECAST BEARING MAY VARY SLIGHTLY FROM THE DIMENSIONS SHOWN ON THE SHOP DRAWINGS. THE MINIMUM END BEARING REQUIRED FOR PRECAST IS 2/" ON CONCRETE AND 2" ON STEEL. 2. SPANCRETE RESERVES THE RIGHT WITHOUT NOTICE TO CHANGE THE LAYOUT OR STRAND PATTERN DUE TO AVAILABLE RAW MATERIALS 3. PRESTRESSED PLANK TOLERANCES: WIDTH: LENGTH: +/- y2" FULL WIDTH UNITS: +/- �4" THICKNESS +/- 4" SAW CUT UNITS: +/- y2" SQUARENESS 4. f'ci = 3500 PSI f'c = 5000 PSI STRAND IS PULLED TO 75% OF ULTIMATE UNLESS NOTED OTHERWISE 5. ALL WATERPROOFING OR WATERPROOFING MEMBRANES ARE BY OTHERS. 6. BEARING SURFACES SUPPORTING PRECAST OR PRESTRESS UNITS MUST BE LEVEL & SMOOTH OR SPANCRETE IS NOT RESPONSIBLE FOR VERTICAL ALIGNMENT OF OUR MATERIAL. 7. ALL VERTICAL REBAR MUST BE LOCATED IN THE EXACT MIDDLE OF THE BEAM. 8. PROPER PREPARATION OF THE SURFACE FOR TOPPING BOND IS CRITICAL. THE SLAB SURFACE MUST BE CLEANED AND FREE OF DEBRIS AND LAITANCE. THE SURFACE SHOULD BE THOROUGHLY SATURATED, PRIOR TO TOPPING PLACEMENT, BUT ALL STANDING WATER MUST BE REMOVED. THE TOPPING SLAB SHOULD BE PROPERLY CURED TO PREVENT CURLING OR OTHER LOCALIZED DELAMINATION. 9. SPANCRETE WILL NOT BE HELD RESPONSIBLE FOR ANY SEVERED STRANDS WITHOUT PRIOR WRITTEN CONSENT OF SPANCRETE. 10. ALL PLUMBING STACKS,VENTS, ELECTRICAL,OR HEATING PIPES MUST NOT BE HIGHER THAN THE UNDERSIDE OF ANY PRESTRESSED SLAB UNIT, UNLESS OTHERWISE SPECIFIED. 11. IT IS RECOMMENDED THAT WEATHER PROTECTION OF THE SPANCRETE PLANK SYSTEM IS TAKEN IMMEDIATELY FOLLOWING GROUTING OF THE JOINTS. FURTHER, IF WETCUTTING / CORING IS PERFORMED, IT MAY BE NECESSARY TO RELIEVE WATER COLLECTION IN THE AFFECTED PLANK HOLLOW CORES BY DRILLING A 1/" PILOT HOLE NEAR THE SUPPORT. 12. THE DESIGN LOADS OF THE SPANCRETE SLAB SYSTEM MUST NOT BE EXCEEDED DURING THE CONSTRUCTION PHASE. FLOOR SPANS FROM 25' TO 28' MAY HAVE A MAX. OF 1 CUBE OF BLOCK (OR EQUIVALENT) % DISTANCE FROM EACH END. LOADS HEAVIER THAN THE ABOVE MAY BE APPLIED ONLY AFTER DECKS HAVE BEEN SHORED AT MID -SPAN DOWN TO GRADE 13. ANY REBAR SHOWN ON THESE SHOP DRAWINGS IS SUGGESTED ONLY AND IS THE SOLE RESPONSIBILITY OF THE ENGINEER OF RECORD TO INDICATE SIZE AND LOCATION FOR REQUIRED REINFORCING. 14. WHERE A CONCRETE TOPPING IS INDICATED ON THE DRAWINGS, SPANCRETE SHALL DESIGN THE PLANK TO CARRY ANY ADDITIONAL TOPPNG LOAD REQUIRED FOR LEVELING THE PRECAST SURFACE DUE TO CAMBER OR DEFLECTION OF THE PRECAST PLANK. THE CUSTOMER SHALL TAKE THIS ADDITIONAL LEVELING CONCRETE INTO ACCOUNT WHEN ESTIMATING THE CONCRETE TOPPING 15. THE CUSTOMER WILL BE RESPONSIBLE FOR EXTRA CHARGES IF OFF-LOADING EACH TRUCK/TRAILER TAKES MORE THAN ONE (1) HOUR AFTER THE ARRIVAL AT THE JOBSITE BECAUSE OF ANY POOR JOBSITE CONDITIONS SUCH AS TRAFFIC, LACK OF SPACE, POWER LINES ETC.. 16. SPANCRETE WILL COORDINATE DELIVERIES AND FURNISH A LOAD SCHEDULE FOR EACH DELIVERY. WHEN DELIVERIES ARE TO BE MADE OUT OF HIGHLANDS COUNTY, FLORIDA, SPANCRETE MAY NOT INCUR ANY LATE CHARGES FOR MATERIAL DELIVERY. 17. ONCE PRODUCTS ARRIVE AT THE JOBSITE AND ARE ACCEPTED BY THE BUYER OR HIS AGENT, SPANCRETE WILL NOT BE RESPONSIBLE FOR ANY VISIBLE CRACKS, SPALLS, OR OTHER DAMAGES. THE CUSTOMER, OR HIS AGENT, WILL SIGN A DELIVERY TICKET FOR EACH LOAD DELIVERED. 18. IF ANY PORTION OF SPANCRETE MATERIALS OR WORK IS DEEMED UNSOUND, DEFECTIVE, OR IMPROPER BY CUSTOMER OR THE ARCHITECT, THEN A STRUCTURAL ENGINEER, MUTUALLY AGREED UPON BY BOTH PARTIES, SHALL INSPECT AND MAKE THE FINAL DECISION AS TO THE STRUCTURAL INTEGRITY OF SAID UNITS OR WORK. 19. FORMING AND POURING OF THE CAMBER GAP AT NON -BEARING WALLS IS BY OTHERS. 20. UNDER NO CIRCUMSTANCES ARE CHARGES BY THE CUSTOMERS ERECTION CONTRACTOR THE RESPONSIBILITY OF SPANCRETE UNLESS BY MUTUAL AND WRITTEN AGREEMENT. 21. BEAMS AND KNOCKOUT BLOCK MUST BE CURED IN ACCORDANCE WITH LOCAL BUILDING CODE, OR MINIMUM OF 48 HRS. OR SPANCRETE WILL NOT INSTALL PRECAST PLANK. A MINIMUM OF 75% OF 3000 P.S.I. IS REQUIRED. 22. GENERAL CONTRACTOR AGREES TO PROVIDE AND MAINTAIN FOR THE DURATION OF THE PRECAST INSTALLATION, STABILIZED ACCESS, ACCEPTABLE TO SPANCRETE SO TRUCKS AND CRANE CAN MOVE UNDER THEIR OWN POWER TO VARIOUS POINTS OF ERECTION WITH NO OVERHEAD OBSTRUCTIONS. CUSTOMER ACCEPTS ALL LIABILITY FOR DELIVERIES BEYOND THE CURB LINE, INCLUDING ALL UNDERGROUND UTILITIES AND COSTS FOR LOSS OF TIME, SPANCRETE RESERVES THE RIGHT TO STOP DELIVERIES AND/OR ERECTION IN THE EVENT SUCH CONDITIONS ARE NOT PROVIDED. 23. IT WILL BE THE RESPONSIBILITY OF THE CUSTOMER TO PROVIDE AND INSTALL REBAR CAPS ON ALL VERTICAL REBAR PRIOR TO THE ERECTION OF THE HOLLOWCORE SLABS. ONLY REBAR CAPS DESIGNED TO PROVIDE IMPALEMENT PROTECTION, SUCH AS THOSE CONTAINING STEEL REINFORCEMENT SHOULD BE USED. MUSHROOM STYLE CAPS ARE NOT ACCEPTABLE. 24. OPENINGS 12" OR LESS ARE BY OTHERS. 25. OPENINGS TO BE LAID OUT BY RESPECTIVE TRADE OR GENERAL CONTRACTOR. 26. TUCK POINTING BETWEEN THE BOTTOM RISER AND STAIR LANDING IS BY OTHERS. 27. UNLESS AGREED TO IN ADVANCE, ELEVATOR AND STAIR CAP INSTALLATION IS BY OTHERS. 28. SPANCRETE IS NOT RESPONSIBLE FOR MISALIGNMENT OF THE STAIR SYSTEM IF CORBELS OR OTHER SUPPORTS ARE INSTALLED INCORRECTLY. 29. CORBELS ARE FOB JOBSITE ONLY TO BE INSTALLED BY THE CUSTOMER PRIOR TO ERECTION OF PRECAST STAIR AND LANDING SLABS. 30. SPANCRETE WILL GROUT LONGITUDINAL KEYWAYS ONLY. SPANCRETE'S SCOPE DOES_ NOT INCLUDE: 31. INSTALLATION AND MAINTENANCE OF BARRICADES, GUARDRAILS, OR OTHER SAFETY DEVICES AFTER SPANCRETE'S PORTION OF THE PROJECT, OR SUBDIVIDED AREAS AND PORTIONS THEREOF, ARE ERECTED AND TURNED OVER TO GENERAL CONTRACTOR, AT WHICH TIME THE GENERAL CONTRACTOR SHALL ACCEPT RESPONSIBILITY FOR THE PROJECT, AND/OR EACH SUCH AREA OR PORTION AS COMPLETED, INCLUDING BUT NOT LIMITED TO ALL SAFETY REQUIREMENTS RELATED THERETO. 32. CONCRETE TOPPING, EDGE POUR, BUTT JOINT POUR, GROUT DAM, SOLID SLAB KEYWAY, POUR STOP, NON -SHRINK NON-METALLIC GROUT. 33. SPANCRETE WILL COMPLY WITH OSHA SAFETY STANDARDS FOR FALL PROTECTION, 1926 SUBPART M. 34. GENERAL CONTRACTOR/OWNER MUST PROVIDE ADEQUATE LEVEL ACCESS FOR THE CRANE ALONG WITH 65' LONG SEMI -TRAILER RIGS TO OPERATE UNDER THEIR OWN POWER. CUSTOMER IS RESPONSIBLE FOR CHARGES RESULTING FROM DELAYS DUE TO UNSUITABLE SOIL, SITE, ACCESS OR OTHER JOBSITE CONDITIONS. 35. A SECURED STAGING AREA FOR ONE HALF (1/2) OF THE NECESSARY LOADS FOR EACH MOBILIZATION MUST BE PROVIDED BY GENERAL CONTRACTOR WITHIN ONE (1) MILE RADIUS OF THE JOBSITE. 36. TRAFFIC CONTROL, SUPERVISION AND STREET BARRICADES TO BE ARRANGED IN ADVANCE AND PROVIDED BY THE GENERAL CONTRACTOR. 37. DAMAGE TO EXISTING LANDSCAPING, DRIVES, SIDEWALKS, CURBS, FOUNDATIONS, SLABS, UNDERGROUND UTILITIES AND OTHER INSTALLATIONS TO FACILITATE ERECTION WILL NOT BE THE RESPONSIBILITY OF SPANCRETE. 38. ALL OVERHEAD OBSTRUCTIONS, INCLUDING POWER LINES, MUST BE REMOVED BY OTHERS PRIOR TO OUR ARRIVAL. 39. PRECAST MUST BE INSTALLED PRIOR TO ANY STEEL OR FRAMING ABOVE. 40. ALL PLANKS & OR PRODUCTS ARE PRECAST/PRESTRESSED STRUCTURAL CONCRETE, MADE TO CONCRETE TOLERANCES, AND ARE NOT DESIGNED TO MEET ARCHITECTURAL SPECIFICATIONS. NO HAND FINISHING OR ON-THE-JOB CAULKING IS INCLUDED, UNLESS OTHERWISE SPECIFIED AND AGREED UPON. CUSTOMER IS TO PROVIDE WATER ON THE JOBSITE FOR GROUTING OF KEYWAYS. 41. ONLY SUCH WALL PLATES, ANCHORS, BOLTS AND ANY OTHER NECESSARY ITEMS AS ARE CAST INTO AND BECOME A PART OF THE PRECAST UNITS ARE TO BE FURNISHED UNDER THIS CONTRACT, UNLESS SPECIFIED ELSEWHERE ON THIS DOCUMENT. 42. SPANCRETE ASSUMES NO LIABILITY FOR DELAYS OR CANCELLATIONS FROM ANY ACT OF GOD NEGLECT OR DEFAULT OF THE CUSTOMER OR HIS DUTY AUTHORIZED AGENT, OR BECAUSE OF ANY DELAY OR CANCELLATION DUE TO UNFORESEEABLE CAUSES BEYOND THE CONTROL OF SPANCRETE ALL CL41MS SHALL BE DEEMED WAIVED UNLESS THE CUSTOMER MAKES OBJECTION PROMPTLY UPON DELIVERY OF MATERIAL, AND IMMEDIATELY CONFIRMED IN WRITING. 43. TENTATIVE DELIVERY DATES WILL BE DETERMINED AT TIME OF AWARD. DELIVERY IS CONDITIONAL ON RECEIPT OF FINAL AND COMPLETE ARCHITECTURAL AND STRUCTURAL DRAWINGS, AND PROMPT RETURN OF FINAL APPROVED SPANCRETE SHOP DRAWINGS. 44. OUR APPROVED SHOP DRAWINGS REPRESENT OUR CONTRACTUAL RESPONSIBILITY TO THE BUYER AND ALL CONFLICTIONS WITH OR OMISSIONS ON THE BUILDING PLANS ARE NOT OUR RESPONSIBILITY. 45. ANY ALTERATIONS BY OTHERS TO THE ORIGINAL SYSTEM AS SHOWN ON SHOP DRAWINGS WITHOUT PRIOR CONSENT SHALL VOID THE WARRANTY ON THIS PROJECT. 46. THESE SHOP DRAWINGS ARE CONTINGENT UPON THE PROJECT BEING CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND DOCUMENTS, WITHIN ACCEPTABLE CONSTRUCTION TOLERANCES. OUT -OF -TOLERANCE CONDITIONS WILL NOT BE THE RESPONSIBILITY OF SPANCRETE; ANY ASSOCIATED COST WILL RESULT IN A CHANGE ORDER. 47. STANDARD DRAFTING & ENGINEERING FEES HAVE BEEN INCLUDED FOR (1) "APPROVED AS NOTED" REVISION. ADDITIONAL DRAFTING AND ENGINEERING DUE TO BUILDING REVISIONS OR EXCESSIVE FIELD CHANGES WILL RESULT IN A CHANGE ORDER BILLED TO THE CUSTOMER ON A PER HOUR BASIS. 48. PRODUCTION AND DELIVERY CONTINGENT ON RECEIPT OF FULLY EXECUTED CONTRACT/PURCHASE ORDER, CREDIT APPLICATION, COPY OF NOTICE OF COMMENCEMENT AND FINAL APPROVED SHOP DRAWINGS. 49. ACTUAL DELIVERY DATES WILL BE ASSIGNED UPON RECEIPT OF FINAL APPROVED SHOP DRAWINGS. DELIVERY DATES MUST BE CONFIRMED IN WRITING AT LEAST SEVEN (7) DAYS IN ADVANCE OR DELIVERY WILL BE MADE AT THE NEXT AVAILABLE DATE. 50. IF DELIVERY DATE IS CANCELLED THREE (3) DAYS FROM THE SCHEDULED DELIVERY DATE, CUSTOMER MUST ACCEPT CHARGES FOR UNLOADING TRUCKS. 51. ONCE THE PROPOSAL./CONTRACT AGREEMENT HAS BEEN DULY EXECUTED BY ALL PARTIES, SAME SHALL CONSTITUTE AN IRREVOCABLE ORDER. IF CONTRACTOR, OR ONE OF ITS AUTHORIZED AGENTS, CANNOT RECEIVE: MATERIALS WITHIN 30 DAYS OF THE CONFIRMED DELIVERY DATE, THEN SPANCRETE CAN BILL CUSTOMER FOR MATERIALS FABRICATED AND OR STORED. 52. CUSTOMER IS RESPONSIBLE FOR ALL GENERAL CONSTRUCTION, F.A.A. PERMITS, ETC. 53. CUSTOMER MUST VERIFY ALL DIMENSIONS AND SLAB LAYOUT ON THESE DRAWINGS. SPANCRETE WILL CAST ALL SLABS ACCORDING TO THE APPROVED SHOP DRAWINGS SIGNED BY THE CUSTOMER. 54. STAIRS MANUFACTURED BY SPANCRETE ARE CAST IN METAL FORMS FOR A NON -TEXTURED FINISH. 55. THE UNTOPPED SLAB SYSTEM INDICATES FLOOR SLABS THAT WILL ACCEPT GOOD QUALITY CARPET WITH A MIN. OF 916" HEAVY PAD, DIRECTLY APPLIED TO THEIR SURFACE. NOTE: ONLY LENGTHWISE SLAB BEAMS ARE GROUTED 56. SPANCRETE ASSUMES NO RESPONSIBILITY WHATSOEVER FOR SUCH CONSTRUCTION NOT BEING IN ACCORDANCE WITH BUILDING CODES OR ADEQUATE TO SAFELY SUPPORT THE DEAD AND LIVE LOADS TO BE SUPERIMPOSED ON THE CONSTRUCTION BY OTHERS. 57. IF SHOP DRAWINGS ARE SUBMITTED AND APPROVED, DIMENSIONS, PLATE ANCHORS, BOLTS, INSERTS, ETC., SHOWN ON SUCH APPROVED DRAWINGS ARE FINAL. WE ARE TO FABRICATE TO SUCH DIMENSIONS AND DETAILS UNLESS AMPLE NOTICE IS GIVEN OF CHANGES TO BE MADE IN WRITING. 58. SPANCRETE WILL PROVIDE A PRODUCT WARRANTY TO CONTRACTOR, COVERING A PERIOD OF ONE YEAR FROM COMPLETION OF CONTRACTED WORK. WARRANTY SHALL LIMIT DEFECTS TO THOSE WHICH ARE DIRECTLY ATTRIBUTED TO ACTS OR OMISSIONS OF SPANCRETE ANY ALTERATIONS TO THE ORIGINAL SYSTEM AS PER SPANCRETE SHOP DRAWINGS SHALL NULL AND VOID THIS WARRANTY. APPROVER NOTE THE CUSTOMER IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS. ERRORS RESULTING DUE TO INCORRECT DIMENSIONS ARE THE CUSTOMERS RESPONSIBILITY. THESE SHOP DRAWINGS WERE COMPLETED USING DRAWINGS DATED 06/30/13 SERIES EXPLANATION FOR LOAD TABLES 750-10 8 06 T PRESTRESS STRAND COVER SPANCRETE CROSS SECTION SPANCRETE THICKNESS PRESTRESS STRAND DIAMETER IN 1/16 INCHES NUMBER OF PRESTRESS STRANDS/UNIT 2" STRUCTURAL TOPPING SPANCRETE TO HAVE STANDARD MACHINE CAST FINISH ON UNDERSIDE OF PLANK. PLANKS WILL HAVE A "BLOCK LIKE" TEXTURE AND MAY REQUIRE SURFACE PREPARATION BY OTHERS TO RECEIVE CEILING FINISH. NN,ETHFA/100010111a i LIVE LOADS: 40 PSF CUSTOMER SIGNATURE DEAD LOADS., 70 PSF CUSTOMER SIGNATURE WIND LOADS: FIRE RATING PER IBC TABLE 721.2.3(2): 1 HR. TO PROVIDE AN ACCURATE:- SCHEDULE FOR DELIVERY, SPANCRETE NEEDS TO DETERMINE THE METHOD THAT WILL BE USED TO ESTABLISH THE FINAL DIMENSIONS OF THE PRECAST PRODUCTS TO BE SUPPLIED BY SPANCRETE. PLEASE NOTE THAT OPTION #2 WILL BE ASSUMED BY SPANCRETE AS THE SELECTED OPTION IF NEITHER OPTION IS SIGNED. OPTION # 1 - CUSTOMER GUARANTEES PROJECT TO BE IN ACCORDANCE WITH CONTRACT DRAWINGS AND DOCUMENTS UNDER THIS OPTION, YOU, THE PURCHASER, WILL GUARANTEE THE PROJECT WILL BE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND DOCUMENTS PROVIDED TO SPANCRETE BY YOU, WITHIN ACCEPTABLE CONSTRUCTION TOLERANCES. WHERE DIMENSIONS OR OTHER INFORMATION ARE NOT PROVIDED ON THE DRAWINGS AND SPANCRETE HAS REQUESTED THIS INFORMATION, YOU MUST PROVIDE SUCH DIMENSIONS IN A TIMELY MANNER. THIS OPTION WILL TYPICALLY ALLOW SPANCRETE TO BEGIN PRODUCTION EARLIER THAN OPTION #2. OPTION #2 - CUSTOMER REQUESTS FIELD SITE MEASUREMENT PRIOR TO COMMENCING PRODUCTION UNDER THIS OPTION, SPANCRETE WILL FIELD VERIFY THE DIMENSIONS FOR OUR PRODUCTS PRIOR TO ANY FABRICATION. HOWEVER, UNTIL THE JOBSITE IS AVAILABLE FOR SUCH A JOB MEASUREMENT BY SPANCRETE PERSONNEL, NO FABRICATION WILL COMMENCE, AND THUS THE PRODUCTION LEAD TIMES AND DELIVERY SCHEDULE WILL BE CONTINGENT UPON THE AVAILABILITY AND ABILITY TO FIELD MEASURE. ACCORDINGLY, THE PROJECT SCHEDULE WILL NOT BE FINALIZED UNTIL THAT TIME. ]HE BELOW PLANK SECTIONS ARE TO BE USED AS A GUIDELINE FOR CORE -DRILLS: 1% I• I I I i � � 3„ 2V9„ 2kg" 1/9" Y„ 3 ,)" dV" 3,9" Vg" .,V?" ,g" 3v2" V " .3„ 3 FO.0 0.0 0.0 0 0.0 0.0 0 .0 4Y' 7" 7" 1Ov" 7" 7" 4%V 1Y4" o" 2Y4" 4'-O" 6" STRAND LAYOUT 1.25E-6606T WEIGHT: = 48 P.S.F. WEIGHT: = 192 P.L.F. CORE -DRILLS: PERFORMED BY OTHERS LOCATIONS TO BE SUBMITTED TO SPANCRETE PRIOR TO ERECTION. a 8" STRAND LAYOUT 1.00F-8606T WEIGHT: = 61 P.S.F. WEIGHT: = 244 P.L.F. OPENINGS LARGER THAN 12"x12": NONE SHOWN ON CONTRACT DRAWINGS. SIZE AND LOCATION OF ANY OPENINGS MUST BE SUBMITTED TO SPANCRETE PRIOR TO CUTTING. �)'EE CALCULATIONS FOR ESTIMATED CAMBER/DEFLECTION 1. GENERAL NOTES 2. SECTION DETAILS 3. SECOND FLOOR LAYOUT/SCHEDULE 4. THIRD FLOOR LAYOUT/SCHEDULE h `✓ ys# 4 � s-c,�-r1a ai' x,f.�1� 415)N f ' !Uj THIS DO(,UMLIN I AINU I HL HW UKMA I IUIN KLrKLJLN I LU HLKLIN AKL I HL LAULU51VL NKUF'LH I Y OF SPANCRETE, AND ARE NOT TO BE USED, DUPLICATED, OR DISTRIBUTED FOR ANY OTHER PURPOSE OitR PROJECT OR BY ANY OTHER PARTY WITHOUT THE PRIOR WRITTEN PERMISSION OF SPANCRETE IT IS FURTHER PROTECTED BY ANY AND ALL APPLICABLE COPYRIGHT AND/OR OTHER INTELLECTUAL PROPERTY LAWS, AND ANY UNAUTHORIZED USE MAY VIOLATE SUCH LAWS. y PROJECT CUSTOMER: MASTERPIECE BUILDERS 408 COLORADO AVE STUART, FL 34994 P: 772-283-2096 F: 772-283-2770 CONT: JEFF BOWERS PROJECT ARCHITECT: ANNAM CORP. CUSTOM DESIGN 2312 SW 10TH ST BOYNTON BEACH, FL 33426 P: 561-445-9135 F: 561-742-3521 PROJECT ENGINEER: JAMES BUSHOUSE, INC 1176 SW 4TH CT BOCA RATON, FL 33432 P: 561-417-3891 REVISIONS 1 o 0 a� m 1 a 0 � U w _ w w w U W Z LLi � U FIELD CHECK BY: DATE: OCIRCLED DIMENSIONS ARE SITE VERIFIED MEASUREMENTS THAT HAVE CHANGED FROM PREVIOUS SPANCRETE DRAWINGS SEAL CHRIS PFEIL (PE #58731) PFEIL DESIGN. LLC 101 E. KENNEDY BLVD. STE 1490 TAMPA, FL 33602 PH. 813-426-3431 Cq 29272 LLJ 0 � U) Z LL W w i- o Z W Z O o �-- U U O W C� Q U **********ATTENTION********** w co 1. APPROVAL OF THIS SPANCRETE PLANK SCHEDULE AND LAYOUT IS T MANDATORY BEFORE PRODUCTION CAN BEGIN. O J v� 2. PLEASE VERIFY ALL DIMENSIONS, LOADS, SPANS, OVER HANGS, ELEVATIONS, OPENINGS, CHASES, AND BEARING CONDITIONS, ETC. 3. ALL OF THE PLANK LENGTHS, WIDTHS, AND THICKNESS WILL BE IN STRICT ACCORDANCE TO THE PLANK SCHEDULE. DRAWN BY: AML 4. ANY ERRORS OR OMISSIONS IN CONTRACT DRAWINGS, REVISIONS, CHECKED BY: FIELD MEASUREMENTS, CORRESPONDENCE PROVIDED TO SPANCRETE MAS BY THE CUSTOMER IS THE SOLE RESPONSIBILITY OF THE CUSTOMER. DATE: PLANS APPROVED BY:--------------------------- 10-11-13 PRINT NAME:_ JOB NO.: 80300 COMPANY:---- ------------------------ ----- SHEET TITLE:---------------------- DATE: ------------ .. TOTAL OF: