HomeMy WebLinkAboutWater and Soil Content305
521 NW Enterprise Drive o Port St. Lucfe,-Florida 34986
e
-rFRNATtO�'
03:54;34 p.m. , 11-05-2013 1 /1
(772) 924-3575 .. (772) 924.3580 (fox)
IN -PLACE DENSITY AND WATER CONTENT OF SOIL AND SOIL
AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) - ASTM 6938
Project: Masterpiece Builders - Various Projects Project ID: 13-2000.00
Address: Various Projects Report ID: „ D-0002
Client: Masterpiece Builders -Date: 11/112013
Permit No: NIA 1308-0210 Field Tech- Mark Barkley Test Mode: Direct Transmission
Area Tested: 4900 Watersong Way, Fort Pierce -Foundation Pad
Soil Description: Gray fine sand
Proctor / LBR ID: P-1 Max Density (PCF): 108.0 Opt Moisture (%): 11.0% Test Standard: D 1557
Compaction Required (%): 95.0%
Probe
Depth
(in)
Elev
Wet
Density
(PCF)
Dry
Density
(PCF)
Moist.
(°%)
Compaction
Location
��p
Results
Northeast Corner
12
0-1
112.4
1016
8.5%
95.9%
Pass
Center Area
12
0-1
113.7
104.1
9.2%
96.4%
Pass
Southwest Corner
12
0. 1
112.5
103.9
8.3%
96.2%
Pass
Testing Gauge Information: Manufacturer: Troxler Model: 3430 ^ S/N:
Density Standard (DS): 2044 Moisture Standard (MS):
Remarks: Depths are below slab grade. , II M
_.,V, O _......,1
L-CUMIU 1U1 �10VCU,U,,.
PR = Proofroll
1, 2, 3 =1 st, 2nd, 3rd Lift
SL = Springline
FL = Final Lift
SG = Subgrade
BG = Below Grade
BC = Basecourse
BOF = Bottom of Footing
TOP = Top of Pipe
FG = Finished Grade
Fast report shall not be reproduced, except in full, without the written approval of GFA international
Environmental o Gootechnical a Construction Materials Testing o Special and Threshold Inspections •
Florida's Leading Engineering Source
www.teamgfo.com
RECEIVED NOV 05 2013
ory
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL 'TREATMENT
PERMIT #: 1'0K_L)2-1V JOB ADDRESS: I to , UJ
BUILDER/CONTRACTOR:
PEST -CONTROL CONTRACTOR: rlacl
PEST CONTROL LICENSE #: -,s% e r e,`7's ,
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: If1cib
Percentage of solution: C) o
Date of Treatment: i l - t -1 -,
Footing
1st Treatment
Re -Treat
Driveway
1't Treatment
Re -Treat
Other
1't Treatment
Re -Treat
Chemicals used: GS e�-
Total gallons used: `aab
Time of Treatment: I i
Slab
ist Treatment
Re -Treat
Pools
1t Treatment
Re -Treat
Perimeter for Final Inspection
ligiture of E terminator
Pt ace --;qA -(cl
Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of protective Treatment for prevention of termites A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment: If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval,
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.