Loading...
HomeMy WebLinkAboutWater and Soil Content305 521 NW Enterprise Drive o Port St. Lucfe,-Florida 34986 e -rFRNATtO�' 03:54;34 p.m. , 11-05-2013 1 /1 (772) 924-3575 .. (772) 924.3580 (fox) IN -PLACE DENSITY AND WATER CONTENT OF SOIL AND SOIL AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) - ASTM 6938 Project: Masterpiece Builders - Various Projects Project ID: 13-2000.00 Address: Various Projects Report ID: „ D-0002 Client: Masterpiece Builders -Date: 11/112013 Permit No: NIA 1308-0210 Field Tech- Mark Barkley Test Mode: Direct Transmission Area Tested: 4900 Watersong Way, Fort Pierce -Foundation Pad Soil Description: Gray fine sand Proctor / LBR ID: P-1 Max Density (PCF): 108.0 Opt Moisture (%): 11.0% Test Standard: D 1557 Compaction Required (%): 95.0% Probe Depth (in) Elev Wet Density (PCF) Dry Density (PCF) Moist. (°%) Compaction Location ��p Results Northeast Corner 12 0-1 112.4 1016 8.5% 95.9% Pass Center Area 12 0-1 113.7 104.1 9.2% 96.4% Pass Southwest Corner 12 0. 1 112.5 103.9 8.3% 96.2% Pass Testing Gauge Information: Manufacturer: Troxler Model: 3430 ^ S/N: Density Standard (DS): 2044 Moisture Standard (MS): Remarks: Depths are below slab grade. , II M _.,V, O _......,1 L-CUMIU 1U1 �10VCU,U,,. PR = Proofroll 1, 2, 3 =1 st, 2nd, 3rd Lift SL = Springline FL = Final Lift SG = Subgrade BG = Below Grade BC = Basecourse BOF = Bottom of Footing TOP = Top of Pipe FG = Finished Grade Fast report shall not be reproduced, except in full, without the written approval of GFA international Environmental o Gootechnical a Construction Materials Testing o Special and Threshold Inspections • Florida's Leading Engineering Source www.teamgfo.com RECEIVED NOV 05 2013 ory Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL 'TREATMENT PERMIT #: 1'0K_L)2-1V JOB ADDRESS: I to , UJ BUILDER/CONTRACTOR: PEST -CONTROL CONTRACTOR: rlacl PEST CONTROL LICENSE #: -,s% e r e,`7's , We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: If1cib Percentage of solution: C) o Date of Treatment: i l - t -1 -, Footing 1st Treatment Re -Treat Driveway 1't Treatment Re -Treat Other 1't Treatment Re -Treat Chemicals used: GS e�- Total gallons used: `aab Time of Treatment: I i Slab ist Treatment Re -Treat Pools 1t Treatment Re -Treat Perimeter for Final Inspection ligiture of E terminator Pt ace --;qA -(cl Note. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC104.2.6 Certificate of protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment: If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval, St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.