Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTermite Treatment (2)St Lucie County Inspections RECEIVED,
2300 Virginia Avenue
Ft Pierce, FL' 34952 DEC 20
(772)462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT
JOB ADDRESS � t,% � �s Z1 ...�
BUILDER f )��
PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC.
PEST CONTROL LICENSE ##
JB 94495
We,, the undersigned, hereby certify that we have pretreated the above -described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 1 Zoo
Percentage of solution:
Date of treatment: 12 - 7 — o!_
V .COON
1st Treatment
Re -treat
el�Kist
-
lTreatment
❑ Re -treat
❑ Driveway
❑ 1st Treatment
❑ Re -treat
❑ Pools
❑ 1st Treatment
❑ Re -treat
❑ Other
❑ 1st Treatment
❑ Re -treat
Chemicals used: P ""u %C
Total gallons used: z©
Time of Treatment: 3 =06
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certiftcates.as.each required protective. treatment is .
completed, providing a copy for the person the permit is issued to and
another copy for -the building permit files. The Treatment Certificate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used, percent concentration
and number of gallons used, to establish a verifiable record of protective
treatment. If the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications..
Perimeter for Final Inspection
Signature of exterminator
NOTE:
There must be a completed form for each required treatment or re -treatment and this form must be -on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will
fail and a re -inspection fee charged.
Revised 6113102 dmg