Loading...
HomeMy WebLinkAboutTermite TreatmentSt Lucie Couuney Inspections 2300 Vir ' is Avenue AUG 2 12 Ft Pierce, FL 34982 St Puubl' (772) 462-2172 ty, FL " CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #<SCC -- QC07- 0�? a JOB BUILDER � �� ►�t�c�G-� (�l tti-� PEST CONTROL ,CONTRACTOR b S � e^)� c-�\1 PEST CONTROL LICENSE #__:� � - 1� � 14 \ S We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 3` s Chendcals used: ' /R4-,ze'4 Percentage of solution: , ( Date of treatment: �?—) 7- 07 ❑ Footing ❑ 1st Treatment ❑ Pze-treat ❑ Slab 1st Treatment Q Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat U Pools ❑ l.st Treatment ❑ Re -treat ❑ Other 'total gallons used: Time of Treatment: FBC104.2.6 Certificate of protective Treatment forprevention of termites, A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Cert&ates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files- The Treatment Certfftcate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. if the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ 1st Treatment ❑ Re -treat perimeter for Final Inspection 1 — ... - Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this forge must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. ,Reiised 6113102 dmg