HomeMy WebLinkAboutTruss Wind Load Compliance (2) 05/23/2066 14:05 7724621735 ST HJCTE Cn PAGE 01:
St. Lucre.'Ccun``r : 7
Building and Zoning Department
2300 Virginia•Avenue
Pout Pieme','L 34982
Design Celrtifiication•.for.Wind:Load CompllanceJ.
TAS Certification is to be completed by the project'desigti'aicbiteet,ar engineer: Tbis Certificatirta mast be submitted with all '
aep llcations for building permits involvint'the construction of new residence(s'ingle or multi-family),n►sidential,addiiion,any.
accessory structure requiring a building i ermit,and any nonresidential structure:,This Certtfication:shall,not applyi a Interior
renovations(provided that no structtiral-.walls,colurrihs or-othei t6iW component is beingeffected)And certain other-'minor building
permits. For further assist#nce,please.contact the Building lnspestipn Office-at 462,-M3 or 4624t?2.. r
Pro'ectName 1� NC7 M OfficeElRe,0h
StreerAddre 4933 W 'fERSoNG.WA Penhitxumher
s FY l V Ucca e ,3--SFl-1:
- - ".Construction •, -
certification Sialetnent: L ;..
i certify that,to the best of my kri,owlledge and.belief,these plans and spe4 icatioins•liaue-been'designcd to-
comply with the applicable structural portion of-the Building:Codes-cvrres tt -ildopted and'enforced•by St.Lucie
County: L also certify-that staictural kirtetf9 depicted-on these plans proiii&ad 6ti:iesistance to the wind
loads and forces specified by current code provisions.
Deshm Parameters and Assumptions Used; (Please check or complete tlte;appropriate,box.)
1.FCfida Building;Cede 2884 Edit 1f If�SCE'T=98r'
2. itng.BuildDesign .is.(checLow) Enclosed ✓ Partialty.Enclosed'•. Opetr Burning-
, � . ,: ...r. ;;'•
3.Building Height: dot-�o r 4.Wind-Speed.-Used-in._Uset�in.Buildift Desig®: J!3 second geest
;,`Sh,Wiod Exposure Classification!(refer to•exposure tables in,
uilding'Codc.identiied in Line 0)1):
33.3 PSF
Avexagt Wind Velotity.Pmsuu'on-�R.xteirio r.Faceao€'Strsctafe` -
3,.Peak Wind Velocity Pressure on Exterier 1Faces of Structnre.
8.Importance/Use Factor(obtain from Building Code):
0.Loader. Floor. PSF RooUdead ,2 P5F Reegfive3 O PSF
10,Were-Shear.Walls.Considered-for Stsuctare(cbectcone): Yes, y" No ' •WNe,attmeb explanatioa.
I1.Is a Continuous Load Path Provided(check one): Yes_Y"' No (if No,ettach explsnatnon)
12.Are Component and Cladding Detail Provided(check one):Yes No (if No,atttich explanation)
M Minimum Soil.Bearing.Pressure;,.-�PSII'
As witnessed by my seal,I hereby eertifythatthe-ihfermafion includedtvitb this certification is true and
correct,to the.best of my knowledge and belief;
Name: Certification.#: 20.311 [Seal Here)•
Design Film: JAMES bU9400 e, f M . D_ ate: 1.2/0 ,
r. SLCCDV Form 9 02010, ;;.Lo/ l