Re: March 29, 2012 Grade. .Beam and Reinforced. Slab .Inspection
Steel . Insp'ection for Kress Residence, located at 5032 Watersong
Way, .St. Lucie,. .Fl.
Dear Mario,
Per your request, I inspected the first . f-loor' grade beams and
slab on the- above project and reviewed the pile logs "completed by
Nutting Engineers . All,wor•k has been completed--per the approved
plans and the requirements of the Florida Building Code and is
acceptable to install .the concrete.
If you have any questions, please contact me at the below
address .
Sincerely, .
J es"..D'. Bushouse,, :P.E.
o.fessional:Engineer' 4203,1
State of Florida
th
_11176-& W% 4" ;:Court, Boca :Raton;:Florida .33432
Phone:(561).417-389.1. Fax: (561) 395=8630
216`E. :Magnolia Street,.Arcadia, Florida 34266
Phone: (863) 491-8242 Fax: (863) 49:1-8243
jim@jamesbushouseinc.com
r
3341 SE Slater Street "' Office: (772) 287-2829
Stuart, FL 34997 or: (561) 622-6343
License # CCC 1326574 Fax: (772) 287-7763
License # CRC1326582 NtN_.code red roo1ers.cum
Code Red Roofers, Gutters, and Fence, Inc.
September 18, 2012 •� /� j
Mario Arbucci
Oceanfront Builders of the Treasure Coast
3462 SE Dixie Hwy
Stuart, FL 34997
Re: Kress Residence
5032 Watersong Way
Ft Pierce, FL 34949
Dear Mario,
I am writing today in an effort to resolve remaining roof work issues at the above referenced address. We have
completed our work, but have yet to receive our final payment. We understood that you had some minor issues,
mainly cosmetic in nature that you wanted to address. However, when we met with you at a site visit yesterday,
you refused to innumerate any punch list items. There were not any defects apparent with any of the roof work.
You indicated you were pleased with the workmanship and appearance of the upper roof, but had remaining
issues with the lower roof. Our inspection turned up no problems with any of the roof areas. The lower roof
installation is consistent with that of the upper roof, and with roofs on theother-.homes at Watersong. We used
the same materials and the same installation methods. The roof passed final inspection by the Building
Department on September 7`h, meeting all code regulations and requirements for the county.
Although we have made best efforts throughout the term of this contract to meet your requirements, even those
outside of the normal procedures followed by most of our customers, you have not held up your end of our
contract by making timely payments. It has left us wondering if you ever intended to honor the contract
between us.
As you are aware, we have filed a lien on the property in an attempt to recover the balance rightfully due for our
work. As this has not incited you to honor our demand for payment, we feel we will be forced to take further
action, including but not limited to contact with the Better Business Bureau and the Florida Department of }
Business and Professional Regulation. Please be assured that these will be last resort actions and we prefer to
close our contract in a professional and amiable manner.
We are asking that you pay the balance due within one week's time.