HomeMy WebLinkAboutTemporary Power Lot 2 Pag.1.pdfSt LucieJounty- Planningand Ilevelopment Services
Building aod Code Regulations' 2300 Virginia Avenue
Fort Pierce, FL 34983
772-462-1553
Fax772-462-6443
VENETIAN ADMINISTRATION LLC
(Name of Tenant or Owner)
The Tenant or Owner requests St Lucie County Development Services Department to release the
electrical power at 4415 N Hwy AlA. Fort Pierce FL. 34949 , (address, including suite number,
as posted on the electric meter and the building) for building permit # 1901-0541. for the purpose
of construction and testing building systems, including afu conditioning refrigeration, lighting,
power and control circuits \ryith the following stipulations:
1. lncomplete or untested circuits are NOT to be energized without properly licensed electrical
personnel on the jobsite and no systems will rpmain energized boyond the testing purpose without
proper inspection by the St Lucie Couuty Building Department appropriately licensed person(s).
2. A11 panels and disconnects not in use must be locked in the "OFF" position or fuses removed.
3. Proper procedures for lockout/tagout will be in place.
4. The electrical equiprment room (where applicable) will remain locked at all times with the key
in the possession ofthe electrical contzctor.
5. All final inspections relative to the closeout ofthis project must be requested and passed in a
timely marurer as determined by the Building Official.
6. The building may not be occupied before a Certificate of Occupancy (C.O.) is issued.
7. No stocking of materials, other than those required for qonstruction is permitted by this
agreement
8. No bn-site occupaney or training of personnel employed by the occtpant, business entity or
owner is permitted by this agreement
9. No fumihre, racks, fumishings or other personal or corporate property is permitted on site by
this ageement.
10. Construction power will remain covered by the requirernents for GFCI protection and all other
requirernents of the governing Codes.
Violation of this agneement may result in the immediate termination of the electrical power
without prior notice or warning to the affected parties. This form requires all of the following
signatures prior to power being released. The undersigned acknowledge that the operation ofair
conditioning e4uipment while construction is in progress may create or increase the risk of
contamination or premature failure of ttre equipmenl
The undersigned acknowledges the above listed stipulations, agrees to the terms of this agreement
and agrees to hold the City of West Palm Beach harmless from any damages that may arise as a
result of the release of power to the premises. The undersigned hereby requests power to be
released for this project. This form does not guarantee po\iler, which is at the discretion and
control of the electrical utility.
Rev.078012020