Loading...
HomeMy WebLinkAboutSHAHEEN roof infoST. LUCIE WORKS V ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code th Edition (2020) Based on Section 1525 of the Flo ida Building Code -Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OFTHE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B,C 1,2,8A.6,6,7 Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D 12.4,6,6,7 Concrete or Clay Tile A, B, D,E 1,2,3,4,5,6,7 Metal Roofs A, B, D 1,2A4,6,67 Wood Shingles and Shakes A, B,D 12,4rA6,7 Other As Applicable 1,2,$4,6,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or ifapplicable, RAS 127 or RAS 128 4. Other Component of Product Appirc val S. Municipal Permit Application 6. Owners Notification for Roofing Co siderations(Reroofing Only) 7. Any Required Roof Testing/Ca lculaton Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': _ Zone 1: Zone 2: _Zone 3: Max. Design Pressure, from the specific product approval system; Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No. of Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: urfacing Fastener Spacing for Anchor/Base Sheet Attachment: one 1':_" oc @ Lap, # Rows_ ® oo Zone 1:_" oc @ Lap, # Rows _ ® _" oo Zone 2:_" oc @ Lap, it Rows _ ® —" oc, Zone 3:_" oc @ Lap, If Rows— ® —' o0 Number of Fasteners Per Insulation Board: Zone 1':Zone 1:—Zone 2:_Zone 3:_ Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, CounterFlashing, Coping, Etc.. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Complywith RAS 111 and Chapter 16.. ST LUCIE WORKS Section D (Steep Slope Roof System) Roof system Manufacturer: OWENS CONRING DURATION Notice of Acceptance Number: FL#10674.1 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: -57 Zone 2e: -57 Zone 2n:_:].1_Zone 2r: -91 one 3e:9_Zone 3r:-128 Deck PLYWOOD Type Underlayment PEEL&STICK-0WENS OMNS CORNING TRFBUILT FtY935a9.1 Roof Sbpe: 5 12 Insulation: Fire Barter: Ridge Ventilation? Fastener Type&Spacing: Is- FIELD /C' PERIMETER, eD RING SHANK NNLS Adhesive Type: . Type Cep Sheet: Mean RooPHeight: '15' FT Roof Covering: SHINGLES Type & Sim Drip Feiw ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mr. lithe Mf values are greater than or equal to the M,values, for each area of the ri`of, then the tile attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RA512T (Zone 1: _X),_= _I_MU: _=pm_ Product ApprovalM (Zone 2e: _xa_= )- Mg: _=Mo�_ Product Approval M (Zone 2n: -_XL_= )-Mg:_=M�_ Product Approval Mr (Zone 2r: _X1_= _-)- Mg: _=MQ,_ Product Approval Mf (Zone 3e: `x1_= I-Mg:_=MI- Product Approval Mr (Zone 3r:-XX_=_)-Mg:_=Kim- Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below_Product Approval Mf_ Mr required Moment Resistance* Mean Roof Height Roof Slope 35' 20, 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 -Must be used in conjunction with a list of moment based the systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the F, values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: _x L x W:=) -W: cos r=Fr. Product Approval F' (Zone 2e: x L_=x Wr=-W:cos r Fa• Product Approval F' (Zone 2n: _x L x W:rr _W: cos r F,z" Product Approval F' (Zone 2r: _x L =x W:= 1-W: Cos r =F,zr, Product Approval F' (Zone 3e: xL =x W:= -W: cos =Fu Product Approval F' (Zone 3r: _x L=x W:=) -W: cos r=F,sr Product Approval F' Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, So, 2g 3e, 3r From applicable table In RAS 127 or by an engineering analysis prepared by PE based on AKE 7 Mean Roof Height H lob ite Roof Slope B lob Site Aerodynamic Multiplier a Pro Juct Approval Restoring Moment due to Gravity Mr Pro Juct Approval Attachment Resistance Mr Pro luct Approval Required Moment Resistance Ms Cal ulated Minimum Attachment Resistance F Pro luct Approval Required Uplift Resistance F, Calculated Average Tile Weight W Pro Juct Approval Tile Dimensions L=length W=width Pro uct Approval All calculations must be submitted to the building ofgcialat the time fper itapplicatlon.