HomeMy WebLinkAboutTermite Treatment (2) Planning &Development Services
Building &Code Regulation Division
2300 Virginia Ave'
• -Fort Pierce,.FL 34982 ,
772-462-2172 Fax 772-462=6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT.
PERMIT #: lZ J�1 JOB ADDRESS: I LGI
BUILDER/CONTRA•CTOR: u��I .
PEST CONTROL CONTRACTOR. EVICT-A-BUG TERMITE''&_PEST"CONTROL INC.
PEST CONTROL LICENSE #:JB175775
We, the undersigned,;hereby certify that we Have pretreated-the above described construction for
subterranean termites in accordance with the standards•of-the National Pest Control Association.
Stpom feet if area treated: Chemicals used:
Percentage of solution:, ® "�� Total gallons used: l
Date of Treatment: I I Time of Treatment:
Footing Slab ,
lst Treatment ist Treatment.
/ Re-Treat Re-Treat
V Drive ay Pools
ist Treatment 1st Treatment
�Re-Treat Re-Treat
Other/ Q��` Perimeter.for Final Inspection
1st.Treatment
Re-Treat
Signature of Exterminator 'Date
,Note: There must be a.completed form for each required treatment or re-treatment and this form must be on the job
site.to be picked up by the inspector at time of each inspection"or the scheduled inspection will fail and a re-inspection
fee charged.
F11130.04.2:6'Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required,protective treatment is completed,
providing a'copy for the person the permit is issued'to and another copy for the building permit files;The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area
treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of
protective treatment, If the soil chemical barrier method for termitee prevention is used, final exterior treatment shall .
-be completed prior to final building approval.
-St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover,listing all the treatments and dates of applications..
Revised 7/24/2014