Loading...
HomeMy WebLinkAboutTermite Treatment r' Planning &Development Services Building &Code Regulation Division O ® 2300 Virginia Ave • o Fort Pierce, FL 34982 �._,,,f rr, cog"Nir - 772-462-2172 Fax 772-462-6443 -- CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: _A 110 -ham! • JOB ADDRESS: 16117 G'trz' �c i6ds Po a( BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: �s PEST CONTROL LICENSE #: T 5 l We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Chemicals used: . Percentage of solution: a o6Total gallons used: Date of Treatment: FS Time of Tre ment: t V Footing Sla 1st Treatment 1st Treatment Re-Treat Re-Treat Drivew Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter for al Inspection 1st Treatment Re-Treat o� SignZure4 Efxterminator i6atg Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection fee charged FBC 104.2.E Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall pro vide the product used, identity of the applicator, time and date of the treatment,site location,area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014