HomeMy WebLinkAboutAPPROVED Trotter rev sheets 11-18-21Southeastern Metals 2-4 ga 5v Crimp Metal Roofing
per product approval FLU 11115.1 over Folgglass self
roofing underlagment over 19/32" CDX plyWOOd att
to trusses per sheeting attachment diagram on roof
installed
adhered
plan
FRONT
INDEX OF SHEETS
SHEET NO.
DESCRIPTION
1.
FRONT AND REAR ELEVATIONS
2.
LEFT AND RIGHT ELEVATIONS
3.
FIRST FLOOR PLAN
4,
SECOND FLOOR PLAN
5.
SECOND FLOOR/LOWER ROOF FRAMING PLAN
4.
ROOF PLAN
�•
D-1
DETAILS
8.
0-2
TYPICAL SECTIONS
9.
E-I
ELECTRICAL - FIRST FLOOR
10.
E-2
ELECTRICAL - SECOND FLOOR
12
6 [SLOPE,
INN
ME
0 0
5/8" thick light textured
stucco on tgplcal concrete
block construction
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
INN
ELEVATION
F_
ELEVATION
F_
Product Approval Submittal Affidavit
Opening Schedule Swing Doors, Overhead Doors, Sliding Doors, Windows & Skylights
Opening
Type
NOA/FL
NUMBER
Product
Model
#
Manufacturer
Glass
Attachment method
TEST
Date
Maximum
Design Pressure
of Approved Tests
I.
FLU 5823.2
Single Hung
8100
Impact
Custom Windows
and Doors
7/8
Type "A"
�Lu 11a823 shalllto 2°xyptdh od to product approval
2.
FL# 13010.2
Fixed Glass
8150
Impact
Custom Windows
and Doors
7/8
T�JPe ��A��
FLU 1113010 2ailnto 2"x adhere
tbuckoduct approval
+ 61.5 PSF
-
3
FL# 20468.5
Fiberglass
door
Smooth star
Opaque
Therms-Tru
Installation shall strictly adhere to product approval
FLU 20468.5 into 2"x pt wood buck
± 0.0 PSF
4.
FLU 20838.1
SGD
8800 PVC
Impact
CustomWindows oorsImpact
1" Overall
Installation shall strictly adhere to product approval
FLU 20838.1 into 2"x pt wood buck
±65.0 PSF
5•
FLU 16546.5
Garage Door
MODEL 73 W6
CLOPLAY
Attach track per product approval and track
and mfg. recomendation -attach buck using 5/8"
x 6" s eeve anchors at 24" o.c.
+36.0/-42.0 PSF
Product
NOA/FL
NUMBER
Model #
Manufacturer
Attachment Method
Ex Iration
Date
DesiST gn Pressure
of Approved Tests
Mullions
FLU 9520.1
Tube Mullion
Custom Windows
and Doors
Installation shall strictly adhere to product approval
FLU 9520.1
+ 65.0 PSF
Roof
FLU 11022.5
1.0 Nail Strip
26 ga. steel
16" wide roof panel
Standing Seam
Extreme Metal
Fabricators. LLC
Roofing installed with min. fastener spacing as follows:
Zone 43 - Max spacing = 12" o.c. with #10 x 1 1/2" Hex -Washer
wood screw to penetrate 3/14" min/ thru deck
with Max row spacing = 6 o.c. over peel and stick underlagment
-228 psf corner
Siding
STUCCO
ON BLOCK
5/8" thick trowel on stucco
with light texture finish
Soffit
STUCCO
ON LATH
I/2" thick light textured trowel on stucco
finish applied to 1/2" dense glass screwed to
soffit framing using 410 x 2" SS screws at
6" o.cfield and ecicies
Hurricane
Panels
ALL Product
Testing by: Miami -Dade
County Building Code Compliance Office / Product Control Division
I have reviewed the above and
approved it by my seal below. ( Architect or Engineer of Record )
No
LOPE 3
LOPE 3
E
E0
0
0
REAR ELEVATION
Southeastern I'letals 2-4 ga 5v Crimp I'letal Roofing installed
per product approval FLU 11115.1 over Folgglass self adhered
roofing underlagment over 19/32" COX plgWOod attached
to trusses per sheeting attachment diagram on roof plan
o �6
Daniel
Braden
SCALE: 1/4" = 1'-0"
PERMITTING INFORMATION (FORM 100)
2R 2E
Florida Building Code Residential: ITH Edition and ASCE 1-16 for Wind Loading
Building Design is: Enclosed Risk Categorcq: II Wind Speed: 160 mph ultimate
2E 3
Mean Roof Height: 12'-8" Roof Pitch: 5:12 (20°-27)
2R
Internal Pressure Coefficient: +0.I8
2E
SubJectabilitcg to damage from: Weathering: Negligible Termites: Very HeavyLa
L2R
Width of Roof End Zone: 4'-0"
2E �
Wind Exposure Classification: C
4
Adjustment factor for Exposure Height Using Allowable Stress Design and
Load Combination per ASCE 1-10 Section 2.4 DL+LL; DL+0.6WL; 0.6DL+0.6WL
5
Exp Height AdJ Factor: 1.21 x Load Factor 0.6 = 0126 applied below
Components il Cladding Wind Pressure (NET) Roof Zone: I. +25.0/-45.0 psf
HIP ROOF 2:12
TO 4:12 PITCH
Roof Zone: 2E +25.0/-62.0 psf
and 2R 3E
E:1 = Roof Zone I
Components il Cladding Wall End Zone Width: 4'-0"
Walls Zone 4
Components il Cladding Wind Pressure (NET) Wall Zone: 4. +35.0/-31.0 psf
Wall Zone: 5. +35.0/-48.0 psf
EM = Roof Zone 2E/2R
Components il Cladding Wind Pressure (NET) on Garage Door:
Walls Zone 5
END ZONE
Zone 5 = 16'-O" x �'-O" CAD _ +29,0/-35.0 PSF
Shear Walls Considered for Structure? Yes
= Corner Zones
Continuous Load Path Provided? Yes
Roof Zone 3
Are Components an Cladding Details Provided? Yes
Minimum Soil Bearing Pressure: 2,500 psi, Presumptive: X B9 Test: psi
This Building Shall Have the Following:
APPROVED SHUTTERS: IMPACT GLASS: X BOTH: NEITHER:
Digitally signed
R.by Daniel R.
Braden
Date: 2021.11.18
18:54:30-05'00'
'-9" = Fini
vim
SCALE: 1/4" = 1'-0"
Floor
KIM
AI? 9770
�•� Fh'E D ARG � �%
O
� �
M M U
GD 00 E
O
_
t
�
U
=00
rA
M
M
7t
4
':; 7t
t�r"�
U O W
-
�A r-
N
m
W
W
O
W
=
U
O
'
z
w
OC)
0
v
CL
<
0000 0000 s
Q
i- i- L
Z
#
1
N CV
v
0-
IUU����r
�3
ch
~
W
x v
-1
N
at
DATE DRAWN
5-6-21
DRAWN BY:
CHECKED BY:
H
ID, R.E3.
MODEL:
^Q
H
SHEET
�
l
W
.
F-I
OF 10.
JOB NUMBER:
G4
21-121
0
copyright
LEFT ELEVATION
SCALE: 1/4" = 1'-0"
RIGHT ELEVATION
SCALE: 1/4" = 1'-0"
Installed
adhered
ched
,Ian
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails -
( 24" o.c.) supporting Max.
1810lbs. uplift
Galt' -Alum Metal drip on
I" x 4" Drip on
I" x 8" Fascia on _
2" x 6" Sub -Fascia /
24"
5/8" thick stucco on 3/8" hi -rib lath /
attached to horizontal and vertical wood
framing with nails or staples to provide
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
cont 2" alumn vent
45 bar vert. w/
30" overlap
5/8" thick light textured
stucco on typical concrete
block construction
#5 bar vert. w/
30" overlap
I" Block recess for
waterproofing at
slab (Optional)
Grade
Digitally signed
Daniel R.byDanielR.
Braden
Braden Date: 2021.11.1
18:54:13-05'00'
12
6 I SLOPE R-38 Blown Insulation
PRE-ENGINEERED TRUSSES
AT 24"o.c. TYPICAL
(shop drawings by manufacturer)
5/8" drywall w/ smooth finish
1/2" drywall over I" x
furring
strips at W' o.c. with
I" foam
insulation on typical 8"
Block walls
All drywall is per FBC
102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Type 11tT,
onlyy.
Provide Our—O—Rock
at alr wet
areas (ex. showers, tubs
etc...)
I
Fill cell with concrete and
(1) 1t5 bar vert. (typical).
Max. spacing shall not exceed
32" unless otherwise noted
see foundation plan notes for
spacing at openings
Typical flooring over 15/32" CDX plywood screwed to
trusses or joists thru 23/32" CDX plywood sub -floor.
Typical Install 15/32" plywood with 48 x 2.5" wood screws at 4" o.c.
Baseboard max. spacing over 15 lb felt. Install 23/32" CDX plywood
screwed and glued to trusses or joists with 48 x 2" screws
/ at 12" o.c.
&I
W' deep pre-engineered wood - I
floor trusses at 24" o.c. �i p
N
R-30 batts insulation
5/8" drywall w/ smooth finish
See floor truss attachment
detail on framing plan
1/2" dr wall over I" x furring
strips at W' o.c. with I"
foam
insulation on typical 8"
Block walls
All drywall is per FBC
102.3.1 and
shall meet all pertaining
"tT'
ASTM codes.
Mortar to be Type
only. -
Provide Our-O-Rock at alr wet O
areas (ex. showers, tubs
etc...)
0
TYPICAL SECTION
Typical
Baseboard
F-24
Fill cell with concrete and
(1) #5 bar vert. (typical).
Max. spacing shall not exceed
32" unless otherwise noted
see foundation plan notes for
spacing at openings
4" concrete slab with fibermesh OR
6"xC 1*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
SCALE : 1/2" = I'—O"
O �
� � O
00 E
,Ly
�
t
r=W w
—
00
rA
M
2
O
� =
V
F=p
'
r..� c�3
C/1 r— con un
W
N
w
o
O
LLl
L-3
"
O
LLI..Z>
Lo0o"
v
O
00�
CL
I
L
Z
0000
#
1
Z
NN �
v
U
O
rr�
LU
0
m
LLJI
QJ X
J
1L
U
~L
<
'T-
E
_bk+
W
DATE DRAWN
5-6-21
DRAWN BY:
CHECKED BY:
H
D.fR.B.
MODEL:
Q
Q
SHEET
W
OF 10.
JOB NUMBER:
G4
21-121
0
eapyright
ROOF FL�4N
TYFICAL ROOF DOTES: Scale 1/4" = I'-0"
— Overhangs shall be 2'-0" unless otherwise noted on this sheet
— roof pitch shall be �:12 unless otherwise noted on this sheet
— Truss shop drawings to be provided bg manufacturer
— Ang changes to this plan shall be submitted to the
architect for approval in writing prior to starting construction.
— ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MIANUFACTURER
— Architect to review Truss Shop Drawings Prior
to construction for layout and uplift verification
— Contractor to provide for Form Board Surveg and to provide
Form Board Surveg to Truss Company prior to truss construction
— Contractor to provide the Architect with truss shop drawings including
ALL truss cut sheets showing ALL truss reactions prior to START
OF FOUNDATION WORK for strapp and footing size verification.
— TRUSS DEFLECTION SHALL NOT EXCEED 0.5ON ANY TRUSS.
HiP ROOF SHEETING
14TT�4CH1IENT DET�4iL
I. Minimum
Nail Size =
8d angular ring shank (min. 2.5"
long)
2. Minimum
Screw Size = 48 x 2.5"
3. MAX.
Sheathing Thickness 19/32" CDX Plywood
4. Use nails
or screws
based on pressure for roof
stated
in permit info box
on these plans for zone 3
O
4 FT(LE)
3�
F
F
k
2
4 FT
2R I
0
0 2
2R— 4 FT
2
—
p F�
LL
FT 2E 4 FT
Ke
Area
Edge
Field
Fastener
Pressure
Zone
I
8d x
2.5"
ring
shank
%
psf
Zone
2E,
2R
4"
4"
8d x
2.5"
ring
shank
IIZ
psf
Zone 3E
Zone
2E,
2R
IOd x
3"
ring
shank
163
psf
Zone 3E
Zone
2E,
2R
48 x
Screw
2.5"
wood
263
psf
Zone 3E
TRUSS BRACING NOTES
Contractor to brace all top and bottom chords in floor
and roof trusses in the following manner:
- install first row of truss bracing 34" from exterior walls
and spaces 12" o.c. thereafter top and bottom chords
- install bracing on any top or bottom chord which is longer
than 12" in clear span.
All truss bracing to be 2" x 4" wood and shall be attached to
top of bottom chord and on bottom of top chord of trusses.
111-11 L _1 _...
usses spaced per truss
nufactures plans
pical splice
ttach bracing to truss chord
ing (2) IOd nails in all
cations
x 4" wood bracing
2" dig. Aluminum rail 2" dig. Aluminum
1" dig. Aluminum Pickets
lUmInUm aIIn
g
D &taIl
Shop drawings bg manufacturer scale 1/2"=I'
Railing Shall compg with FBC R312
(2) SIMPSON HETA 20 hurricane
anchors at each girder supporting
Max. 2500 lbs. uplift. Each Strap
shall have (9) IOd x 1 1/2" nails.
Truss to have 24" of blocking
-2
HTS
20
2
H
O
N
o
HU
212
A
B2
2
BI
BI
BI
N
LBO BI BI L31
O
N
2
4`2HU
B 1
I \ I
Abovip
=
C-2
'.
L31 BI
BI L601'
F272, X 36„
,Attic Accessi
2
12
6 SLOPE
Ill
(n b
�'
O
N
=
C_2
BI
12 ft-
Q �— Q
2 O
BI
W ,� 151 L20
W W
Z
=
Z � L
ON
C-2
-14
I
111 o
O
Q- N
<
B2
BI L20�f'
C-2
BI
------------
24"
L31 gl
24"
O.H.
O.H.
L,oO Bl B1 L 00
BI
BI
L22
BI
I
BI
I L22
N
o
20
HUC
12-
ET
(2) SIMPSON HETA 20 hurricane
anchors at each girder supporting
Max. 2500 lbs. _ uplift. Each Strap
HANGER SCHEDULE
SIMPSON HUC212— 2
Provide Simpson HUC212-2 hanger
w/ (10) 16d nails into Joist
and (10) 16d nails into header
supportingg 3,600 lbs. max. gravity.
and 2,600 lbs. max. uplift.
Metal Sales Manufaturing Inc 5v Metal Roofing
installed per FL 411560.1 over Polyglass Self
Adhered roofing system installed per FL# 5259.1
over 19/32" CDX plgwood attached to trusses
/per sheeting attachment diagram on roof plan
STRAFFING SCHEDULE
HTS 2
Simpson HTS 20 hurricane
anchor at each truss (24" o.c.)
supporting Max. 1,450 lbs.
uplift w/ (24) IOd x 1.5" nails
Additional
45 bars
Lintel
Bar
Clear
"A"
Length
Length
Span
ars
y CLEAR
COVER
2'-10"
2'-8"
i
Precast Lintel
3'-4"
2'-2"
2,43
SFS-OBAT
Additional
4'-0"
" 3'-10
2'-8"
2.u3
u5 bars
CLEAR
4'-6"
4'-4"
3'-2"
2.tt3
COVER 7 One Row of Beam
5'-4"
5'-2"
4'-O"
2,#3
Block Above
r ; y Precast Lintel r y
\
Additional i
-1'-6"
�'-O"
6'-2"
2,#5
COVER t____y 45 bars '�----"
8F16-IBAT SF16-8/2T
8'-4"
T-10"
-1'-0"
2,#5
NOTES:
ALL reinforcing steel is grade 60.
I. MIN. COVERAGE OF STEEL - 1.5"
2. MIN. BEARING REQUIRED 8 EA. END - 4"
3. STANDARD FOR REINF. STEEL = ASTM A615 GRADE 6O
TYPICAL LINTEL SECTION
( PRECAST CONCRETE >
Digitally signed
Daniel R. by Daniel R.
Braden
Braden Date: 2021.11.18
18:53:56-05'00'
STRAFFING SCHEDULE
HETA 20
HETA 20
SiMPSON HETA 20 hurricane
anchor at each truss supporting
Max. 1,810 lbs. uplift. Strap shall
have (9) IOd x 1 1/2" nails.
Attic venting Calculations FSC R80L2
Total Attic Space = 3184 sq. f t.
Venting ratio VISO = 21.22 sq. ft. required
Provide A Continuous 2 wide vent 51 Sf
HTS 20
Galy-Alum Metal drip on
1" x 4" Drip on
I" x 8" Fascia on
2" x �" Sub —Fascia
1/2" thick stucco on 3/8" hi —rib lath
attached to horizontal and vertical wood
framing with nails or staples to provide
no less than I-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
W li co t 2" alumn vent
Bars
r�rriry
e
none 3'-0" high railing
none with pickets °� 5"O.C.
(see details )
e Simpson HTS 20 or equal
e hurricane anchor at each truss
( 24" o.c.) supporting Max.
50 lbs. uplift w/ (20) IOd nails
LINTEL SCHEDULE
Window
Pre-
Rows of
Max
Max
Max
Mark
ounit
Lintel
Cast -Crete
Stressed
BMBlock
Bottom
Top
Load't4
Load
Lotd al
Width
Size
Specification
Steel
Size
Steel
Size
(PLF)
(PLF)
(P F)
L20
2'-0"
T-10"
SFS-OBAT
NO
—
1
u5
3069
1569
I6 2
T-2"
L31
2'-6"
3'-9"
8F8-0B/IT
NO
—
I
u5
2561
1363
16
2'-8"
3'-1"
L45
4`5"
5'-1"
8F8-OB/IT
NO
—
I
u5
1344
1016
411
L50
5'-O"
5'-8"
srS-OBAT
NO
—
I
u5
1105
909
33
L60
6'-e"
C-8"
8F8-OB/IT
NO
—
1
u5
1011
121
53
L10
T-O"
T-O"
8F8-0B/IT
NO
—
1
45
1011
121
53
L80
8'-0"
8'-8"
BPS-OBAT
NO
—
I
u5
699
591
512
L40
9'-0"
9'-8"
8F8-OB/IT
NO
—
1
u5
535
530
401
LI00
10'-0"
10'-8"
8F8-0B/IT
NO
—
1
45
582
414
452
LIIO
10'-0"
ll'-S"
BPI(.-IB/IT
NO
ONE
I
u5
I
u5
1254
410
402
L120
12'-0"
IT-61"
8FI6-IBAT
NO
ONE
1
u5
I
u5
10-15
606
324
1140
14'-O"
14'-8"
SFI6-IB/IT
YES
ONE
I
u5
I
u5
1310
519
284
L140
I6'-0.
IC-8-
SFI6-6/2T
YES
ONE
I
u5
2
u5
950
500
194
L180
I6'-0"
18'-8"
SFI6-8/2T
YES
ONE
I
1 u5
1 2
u5
150
424
1 148
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG, FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
- LINTELS OVER 13'-II" LONG: ARE TO BE PRESTRESSED.
- CONTRACTOR TO VERIFY ALL LINTEL SIZES BASED ON FINAL MASONRY
OPENING SIZES AND ADJUST LINTELS ACCORDINGLY PRIOR TO ORDERING:
ANY/ALL LINTELS
(2) 1 3/4" x 12"
LVL Parallam Beam
1/2" thick stucco on 3/8" hi —rib lath
attached to horizontal and vertical wood
framing with nails or staples to provid
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetrati
into vertical wood framing members
12" x 12" conc. column
block filled W/ conc.
t 4 - 45 bars vert-
W/ stucco finish and
thicken edge to 8"x8"
with concrete and
one 45 bar continuous
12 PRE-ENGINEERED TRUSSES
Slope at 24"o.c. TYPICAL
( shop drawings bg manufacturer )
R-38 Blown Insulation
In bottom chord of trusses
drywall
Simpson post cap
4 x pt post
Tile on torch down membrane roofing
on 19/32" CDX plgwood nailed 6" o.c.
in field � 4" on edge w/ 8d nails
2" x 10" PT Ledge w/
2" sloee _
2" x 10" Joists at 16" o.c.
slmpso E344 post base
rovide Simpson LUS 2107
Joist hanger at each joist
Hook vertical bar over
top bar w/ #5 90' bend bar
w/ a 10" min. lap at top bar
Gam•.. ..•,�
�•� FEED ARG �1%
vJ
U
_
00 E
� �
t
a:r
00
U �
Lm
0 W�MM
t '--
N
C. 0) c�
V�r_ con (A -
N
`�
w
LLl
"
O
..
LLI
00 cq
Z
Lo 00 "
v
O
CL
0000
I_
r >`
Z
0000
#
Z
NN v
r
q)0
U�-
m
L
U
0
�
N
<
3
DATE DRAWN
5-6-21
DRAWN BY:
A.S.K. C.C.U.
CHECKED BY:
D.iZ.6.
MODEL:
^Q
H
SHEET
W
� .
OF 10.
JOB NUMBER:
G4
21-121
0
eapyright
Truss to have 24" of blocking