HomeMy WebLinkAboutMisc LetterWe have been trying to get this project together for quite some time now. We've
paid for 2 Surveys and 2 sets of drawings.
There is a request for 2 permits — one to move the building and the other to erect
the carport.
The first set of carport drawings we received shows the posts of the building sunk
in the ground. We do NOT want to bury the posts; rather, we wish to attach them
to the concrete slab we plan to have poured. Thus, we requested a second
drawing which still not come back as we had envisioned. We do realize there may
need to be additional support where the posts are attached to the concrete. We
need the permit department to TELL US WHAT IS REQUIRED to accomplish our
goa 1.