ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Code 7th Edition (2020)
Based on Section 1525 of the Florida Building Code-Building
INSTRUCTION PAGE File CVY
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Required Sections of Attachments Required
Roof System the Permit Application See List Below
Form
Low Slope Application A, B,C 1,2,3.4.5,6,7
Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7
Asphaltic Shingles A, B, D 194,56,7
Concrete or Clay Tile A, B, D, E
Metal Roofs A, B, D
Wood Shingles and A, B, D t,,2;4,5,6,7
Shakes
Other As Applicable 11;2,3,4,5,6,7
ATTACHMENTS REQUIRED As Applicable):
1. Fire Directory Listing Page
2. From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3. Design Calculations per Chapter 16,or if applicable,RAS 127 or RAS 128
4. Other Component of Product Approval
5. Municipal Permit Application
6. Owners Notification for Roofing Considerations(Reroofing Only)
7, Any Required Roof Testing/Calculation Documentation
Form RooflnfoFeb21 Rev Feb 18,2021
ST. LUCIE WORKS
REVIEWED FOR
CODE COMPLIANCE
Section A (General Information)ST. LUCIE COUNTY
Master Permit No. Q i` 0 — � Process No. OCC
Contractors Name: 0W%9C1- MO O 1�`�C� License# ®
�
Job Address 1 I I-a_- cTwx��4 v-st- 3`1r 0cr 3
ROOF CATEGORY
❑Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
❑Asphaltic Shingles t1A}et3('anel/Shingles ❑Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE-
❑ New roof ❑ Repair ❑ Maintenance ❑ Reroofing ❑Recovering
-ROOF SYSTEM INFORMATION ' S Lo
Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) Total (SF)
Section B(Roof Plan)
Sketch Roof Plan: Illustra a all levels and ections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of secti ns and levels,cle rly identify dimensions of elevated pressure zones and location of parapets.
r
St. LUCIE WORKS
Section C(L Slope Roof) Surfacing:
Fill in specific roo ssembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment:
manufacturer Zone 1':—" oc @ Lap,#Rows ®' '0
(If a component is not u d,identify as"NA") Zone 1:—" oc @ Lap,#Rows ® moo
System Manufacturer: Zone 2:—" oc @ Lap,#Rows ® 0
Zone 3:`" oc @ Lap,#Rows ®. °
Product Approval No.:
Number of Fasteners Per Insulation Board:
Design Wind Pressures,From RAS 128\Calculations: Zone 1': Zone 1: Zone 2: Zone 3:
Zone 1':—Zone 1: Zone 2: Illustrate Components Noted and Details as Applicable:
Max. Design Pressure,from the specit approval Woodblocking, Gutter, Edge Termination, Stripping,
system: Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing,Coping, Etc.,
Deck: Indicate: Mean Roof Height, Parape eight, Height of Base
Type: Flashing,Component Material, terial'Thickness, Fastener
Type,Fastener Spacing or Su it Manufacturers Details that
Gauge Thickness: Comply with RAS 111 a Chapter 16..
Slope:
Anchor/Base Sheet&No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
FT.
Insulation Base Layer:
Base Insultation Size and Thickness: Parapet
Base Insulation Fastener/Bonding Material: Height
Top Insulation Layer:
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Ma rial:
Mean
Base Sheet(s)&No.ofIng
Roof
Base Sheet Fastener/Berial: Height
Ply Sheet/Faster/Bonding
ly(s):
Ply Sheet Material:
Top Ply:
Top Ply Fastener/Bonding Material:
• ST. LUCIE WORKS
Section D (Steep Slope Roof System)
Roof System Manufacturer:
Notice of Acceptance Number:
Minimum Design Wind Pressures,If Applicable(From RAS 127 or Calculations):
Zone 1: Zone 2e: Zone 2n: Zone 2r: Zone 3e: Zone 3r:
Deck Type:
Type.Uhded4ment: p" S
Roof Siope:
�? insulation:
Fire Barrier:
RidggVent'ilatian? Fastener Type&Spacing: &�, �
Adhesive Type:
Type Cap Sheet
Mean Roof Height: Roof-Coverings
Type&Size Drip -�
Edge: —
ST. LUCIE WORKS
Section E(Tile Calculations)
For Moment based tile systems,choose either Method 1 or 2.Compare the values for Mr with the values from Mf.If the Mf values
are greater than or equal to the Mrvalues,for each area of the roof,then the tile attachment method is acceptable.
Method 1'Moment Based Tile Calculations Per RAS 12T
\ofResistan
XX Product Approval M
xk = _y-[ _. Product ApprX
x� = _)=AAJC =M Product Appr
xX = _)-Mg: =M Product Appr
x`.� _ �:--Mg: =M.. Product App
X -W. ^Mrs Product ApprMethod 2"Simplified Tile Calculations Per Table Below
Required Mtan (Mr) From Table Below Product Approval Mf
Mr required Moment Resistance*
Mean Roof Height Roof Slope 15' 20' 25' 40'
2:12 .4 36.5 38.2 39.7 42.2
3:12 32. 34.4 36.0 37.4 39.8
4:12 30.4 32.2 33.8 35.1 37.3
5:12 28.4 30.1 31.6 32.8 34.9
6:12 26.4 28.0 2 .4 30.5 32.4
7:12 24.4 5.9 7.1 28.2 30.0
*Must be used in conjunction with a list of moment ased tiles tems
• For Uplift based tile systems use Method 3. Compar the v es for F with the values for Fr If the F'values are greater than or
equal to the Fr values,for each area of the roof,then th ..e attachment method is acceptable.
Method 3"Uplift B e Tile Calculations Per RAS 12T
(Zone 1: x L =x W:= ) -W: s r =Fri Product Approval F'
(Zone 2e: x L =x W:= )-W: cos r =Frze Product Approval F'
(Zone 2n: x L =x W:= )-W: cos r Frzn Product Approval F'
(Zone 2r: x L =x W:= )-W• cos r =Fr Product Approval F'
(Zone 3e: x L =x W:= ) cos r =Fr3e Product Approval F'
(Zone 3r: x L =x W:= W: cos r =Fr3r Product Approval F'
Where to Obtain Information
Y
Description Symbol Where to find
P
Design Pressure Zones 1,2e,2n,2r,3e,3r From applicable table in 4S 127 or by an engineering analysis
prepared by PE based on AS 7
Mean Roof Height H Job Site
Roof Slope B Job Site
Aerodynamic Multipli r a Product Approval
Restoring Moment ue to Gravity Mg Product Approval
Attachment Resistance Mf Product Approval
Required M9rftent Resistance Mg Calculated
-Min imu Attachment Resistance F' Product Approval
Required Uplift Resistance Fr Calculated
Average Tile Weight W Product Approval
Tile Dimensions L=length W=width Product Approval
All calculations must be submitted to the building official at the time of permit application.