HomeMy WebLinkAboutFECFORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Meth&4,,,,)
2 2021
ProjectName: BOWMAN ADDITION
BuilderName:
Street: 6505 FORT WALTON RD.
Permit Office: ST. LUCIE COUNTY
Permitting p=partm
City, State, Zip: FT. PIERCE, FL,
PermitNumber:
St. Lucie 4cunb,
Owner: DUANE & ALLISON BOWMAN
Jurisdiction: 6611000
DesignLocation: FL, Fort Pierce
County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing Addition
10. WallTypes(1152.0 sqft.)
Insulation Area
2. Single family or multiple family Detached
a. Frame -Wood, Exterior
R=11.0 1152.00ft'
b. N/A
R= ft2
3. Number of units, if multiple family 1
c. N/A
R= ft2
4. Number of Bedrooms (Bedrms In Addition) 3(1)
d. N/A
R= ft2
11. Ceiling Types (1175.0 sqft.)
Insulation Area
5. Is this a worst case? No
a. Roof Deck (Unvented)
R=20.0 1175.00 ft
6. Conditioned floor area above grade (ft') 1175
b. N/A
R= ft2
Conditioned floor area belowgrade (ft2) 0
c. N/A
R= ft2
7. Windows(138.5 sqft.) Description Area
12. Ducts
a. Sup: Attic, Ret: Attic, AH: EXISTING
R ft2
6 35
a. U-Factor: Sgl, U=0.79 81.00 ft2
SHGC: SHGC=0.50
b. U-Factor: Sgl, U=0.30 48.00 ft2
13. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.23
a. Central Unit
23.0 SEER:14.00
c. U-Factor: Sgl, U=0.29 9.60 ft2
SHGC: SHGC=0.24
Area Weighted Average Overhang Depth: 2.000 ft.
14.Heatingsystems
kBtu/Efficiency
Area Weighted Average SHGC: 0.389
a. Electric Strip Heat
17.0 COP:1.00
8. Skylights Area
c. U-Factor:(AVG) N/A ft2
15. Hotwatersystems -Replacement equipment
SHGC(AVG): N/A
a. Electric
Cap:40 gallons
9. Floor Types (1175.0 sqft.) Insulation Area
EF:0.950
a. Slab -On -Grade Edge Insulation R=0.0 1175.00ft'
b. Conservation features
b. N/A R= ftZ
None
c. N/A R= ft2
16. Credits
CF, Pstat
Glass/Floor Area: 0.118 Total Proposed Modified Loads: 34.41
PASS
Total Baseline Loads: 34.64
I hereby certify that the plans and specifications covered by
Review of the plans and'C7g
this calculation are in compliance with the Florida Energy
specifications covered by this
N' '
Code.
calculation indicates compliance
'�
with the Florida Energy Code.
rrr/f�'��n •`;Jr
PREPAR D 34�*W04JI020
DATE:'2'�02
Before construction is completed,A
this building will be inspected�;,f�o
compliance with Section
,s
'T
I hereby certify that this building, as designed, is in compliance
Florida Statutes.�9
with the Florida Energy Code.
p.y
OWNER/AGENT:
BUILDIQFC AL:
DATE:
DATE: ..�i
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires
an envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
2/23/2021 10:40 AM 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Softw Qj a 4
FORM R4ns_gngn INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: BOWMAN ADDITION Bedrooms: 3
Address Type:
Street Address
Building Type: User Condit!onedArea: 1175
Lot#
OwnerName: DUANE & ALLISON BOWMA Total Stories: 1
Block/Subdivision:
# of Units: 1 Worst Case: No
PlatBook:
BuilderName: RotateAngle: 0
Street:
6505 FORT WALTON R
Permit Office: ST. LUCIE COUNTY CrossVentilation: No
County:
St. Lucie
Jurisdiction: 6611000 Whole House Fan: No
City, State, Zip:
FT. PIERCE,
FamilyType: Detached
FL,
New/Existing: Addition
Comment:
CLIMATE
/ Design Temp
Int Design Temp Heating
Design
DailyTemp
v DesignLocation TMY Site 97.5 % 2.5 %
Winter
Summer DegreeDays Moisture
Range
FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90
70
75 299
62
Low
BLOCKS
Number Name Area Volume
1 Entire House 1175 9400
SPACES
Number Name Area Volume Kitchen Occupants
Bedrooms InfilID Finished Cooled Heated
1 EXISTING 875 7000 No 0
2
1 Yes
Yes
Yes
2 NEW MASTER 180 1440 No 2
1
1 Yes
Yes
Yes
3 WIC 25 200 No 0
1 No
Yes
Yes
4 LAUNDRY 35 280 No 0
1 Yes
Yes
Yes
5 NEW BATH 60 480 No 0
1 Yes
Yes
Yes
FLOORS
# FloorType Space Perimeter PerimeterR-Value
Area
JoistR-Value
Tile Wood Carpet
1 Slab -On -Grade Edge Insulation EXISTING 95 ft 0
875 ft2
____
0 1
0
2 Slab -On -Grade Edgelnsulation NEW MASTER 27 ft 0
180 ft2
____
0 1
0
3Slab-On-Grade Edge Insulation WIC 1 ft 0
25ft2
__--
0 1
0
4Slab-On-Grade Edge Insulation LAUNDRY 7ft 0
35ft2
____
0 1
0
5 Slab -On -Grade Edge Insulation NEW BATH 15 ft 0
60 ft2
____
0 1
0
ROOF
Roof Gable Roof
Rad
Solar SA Emitt Emitt
Deck Pitch
# Type Materials Area Area Color
Barr
Absor. Tested
Tested
Insul. (deg)
1 Hip Compositionshingles 1239 ft2 0 ft2 Light
N
0.5 No 0.7 No
20 18.43
ATTIC
RBS IRCC
V # Type Ventilation Vent Ratio (1 in)
Area
1 Full attic Unvented 0
1175 ft2
N N
2/23/2021 10:40 AM 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4
FnRIUI'R4nr,_gngn INPUT SUMMARY CHECKLIST REPORT
CEILING
#
CeilingType
Space
R-Value
Ins Type
Area
Framing Frac Truss Type
1
UnderAttic(Unvented)
EXISTING
0
Blown
875ft'
0.1
Wood
2
UnderAttic(Unvented)
NEW MASTER
0
Blown
180ft'
0.1
Wood
3
UnderAttic(Unvented)
WIC
0
Blown
25ft'
0.1
Wood
4
UnderAttic(Unvented)
LAUNDRY
0
Blown
35fF
0.1
Wood
5
UnderAttic(Unvented)
NEW BATH
0
Blown
60ft'
0.1
Wood
WALLS
Adjacent
Cavity Width Height
Sheathing Framing Solar
Below
To Wall Type1
Space
N
Exterior Frame -Wood
EXISTING
11 35
0 8
0
280.0ft'
0
0.25 0.5
0
2
S
Exterior Frame -Wood
EXISTING
11 35
0 8
0
280.0ft'
0
0.25 0.5
0
3
W
Exterior Frame -Wood
EXISTING
11 25
0 8
0
200.0ft'
0
0.25 0.5
0
4
E
Exterior Frame -Wood
NEW MASTE
11 15
0 8
0
120.0ft'
0
0.25 0.5
0
5
S
Exterior Frame -Wood
NEW MASTE
11 12
0 8
0
96.0ft'
0
0.25 0.5
0
6
N
Exterior Frame -Wood
LAUNDRY
11 7
0 8
0
56.0f?
0
0.25 0.5
0
7
N
Exterior Frame -Wood
NEW BATH
11 5
0 8
0
40.0ft'
0
0.25 0.5
0
8
E
Exterior Frame -Wood
NEW BATH
11 10
0 8
0
80.0ft'
0
0.25 0.5
0
DOORS
#
Omt DoorType
Space
Storms
U-Value
Width
Height
Area
Ft
In
Ft In
1
S Insulated
EXISTING
None
.32
3
6 8
20ft'
2
S Insulated
NEW MASTE
None
.32
2
8
6 8 17.8 ft'
WINDOWS
Orientation shown istheentered,Proposed orientation.
Wall
Overhang
V
#
Omt ID Frame Panes
NFRC U-Factor SHGC
Imp
Area
Depth
Separation
IntShade
Screening
1
N 1 Metal Single(Clear)
Yes
0.79 0.5
N
9.0 ft'
2 ft 0 in
1 ft 4 in
None
None
2
N 1 Metal Low-ESingle
Yes
0.29 0.24
N
4.8 ft'
2 ft 0 in
1 ft 4 in
None
None
3
S 2 Metal Single(Clear)
Yes
0.79 0.5
N
48.0 ft'
2 ft 0 in
1 ft 4 in
None
None
4
S 2 Metal Low-ESingle
Yes
0.3 0.23
N
24.0 ft'
2 ft 0 in
1 ft 4 in
None
None
5
W 3 Metal Single(Clear)
Yes
0.79 0.5
N
24.0 ft'
2 ft 0 in
1 ft 4 in
None
None
6
S 5 Metal Low-ESingle
Yes
0.3 0.23
N
24.0 ft'
2 ft 0 in
1 ft 4 in
None
None
7
N 7 Metal Low-ESingle
Yes
0.29 0.24
N
4.8 ft'
2 ft 0 in
1 ft 4 in
None
None
INFILTRATION
#
Scope
Method
SLA CFM 50 ELA
EgLA
ACH
ACH 50
1 Wholehouse ProposedACH(50) .000254 783.3 42.98
80.68
.0902
5
2/23/2021 10:40 AM 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 4
FORM'R405-2020 INPUT SUMMARY CHECKLIST REPORT
HEATING SYSTEM
# System Type
Subtype
Speed Efficiency Capacity
Block
Ducts
1 ElectricStrip Heat/None (Basel
None
COP:1
17 kBtu/hr
1
sys#1
COOLING SYSTEM
# System Type
Subtype
Subtype Efficiency
Capacity
Air Flow
SHR Block
Ducts
1 Central Unit/None (Baseline as
Split
Single SEER:14
23 kBtu/hr
cfm
0.7 1
sys#1
HOT WATER SYSTEM
# System Type SubType
Location
EF Cap
Use
SetPnt
Conservation
1 Electric None
LAUNDRY 0.95 40 gal
60 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert # CompanyName
System Model# CollectorModel# Area
Volume
FEF
None None
ftZ
DUCTS
-- Supply -- -
-- Return ---
Air
CFM 25 CFM25
HVAC #
v # Location R-Value Area
Location
Area LeakageType
Handler
TOT OUT QN RLF
Heat Cool
1 Attic 6 35 ftZ
Attic
5 ftZ Defaultl-eakage
EXISTING
(Default) c(Default) c
1 1
TEMPERATURES
ProgramableThermostat: Y
Ceiling Fans:
CoolingJan Feb Mar
HeatinJan �C)j Feb Mar
Apr
Apr
May Jun Jul
I May Jun Jul
Auge
AuSep
Oct Nov
Oct Nov
Ox
Dec
Dec
H
Ventin Jan [[ 11 Feb X Mar
A r
may Jun Jul
Aug
Se
Oct Nov
Dec
ThermostatSchedule: HERS 2006 Reference
Hours
ScheduleType 1
2 3
4 5 6
7
8 9
10 11
12
Cooling (WD) AM 78
78 78
78 78 78
78
78 80
80 80
80
PM 80
80 78
78 78 78
78
78 78
78 78
78
Cooling (WEH) AM 78
78 78
78 78 78
78
78 78
78 78
78
PM 78
78 78
78 78 78
78
78 78
78 78
78
Heating (WD) AM 66
66 66
66 66 68
68
68 68
68 68
68
PM 68
68 68
68 68 68
68
68 68
68 66
66
Heating (WEH) AM 66
66 66
66 66 68
68
68 68
68 68
68
PM 68
68 68
68 68 68
68
68 68
68 66
66
MASS
Mass Type
Area
Thickness
Furniture Fraction
Space
Default(8lbs/sq.ft.
0 ftZ
0 ft
0.3
EXISTING
Default(8lbs/sq.ft.
ft2
ft
0.3
NEW MASTER
Default(8lbs/sq.ft.
ftZ
ft
0.3
WIC
Default(8lbs/sq.ft.
ftZ
ft
0.3
LAUNDRY
Default 8lbs/s .ft.
ftZ
ft
0.3
NEW BATH
2/23/2021 10:40 AM 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 4
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
RECEIVED
MAR 2 2 2021
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Permitting D.-partment
St. Lucia Ccu-,it,!
a
Project Name: BOWMAN ADDITION Builder Name:
Street: 6505 FORT WALTON RD. Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
x
Owner: DUANE & ALLISON BOWMAN Jurisdiction: 6611000
w
Design Location: FL, Fort Pierce
v
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks orjoints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawispace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope '
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be airtight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extiend behind pipong and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
nkler cover plates and walls or ceilinos.
o.,.,.„ , uiapu lull W, wy waub auan uc in au;uivance wiih me provisions or iCC-400.
2/23/2021 10:41 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software
Page 1 of 1
FORM R405-2020
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 99 RECEIVED
The lower the EnergyPerformance Index, the more efficient the home. MAR 2 2 1011
Permitting C-apartment
6505 FORT WALTON
RD., FT. PIERCE, FL,
St. Lucie -Ou,7t•/
1. New construction or existing
Addition
10. Wall Type and Insulation
Insulation Area
2. Single family or multiple family
Detached
a. Frame - Wood, Exterior
R=11.0 1152.00 ft'
b. N/A
R= ft
3. Number of units, if multiple family
1
c. NIA
R= ft2
4. Number of Bedrooms
3(1)
d. N/A
R= ft2
11. Ceiling Type and insulation level
Insulation Area
5. Is this a worst case?
No
a. Roof Deck (Unvented)
R=20.0 1175.00 ft2
6. Conditioned floor area (ft2)
1175
b. N/A
R= ft2
c. N/A
R= ft2
7. Windows- Description
Area
12. Ducts, location & insulation level
R ft
a. U-Factor. Sgl, U=0.79
81.00 ft2
a. Sup: Attic, Ret: Attic, AH: EXISTING
6 35
SHGC: SHGC=0.50
b. U-Factor: Sgl, U=0.30
48.00 ft2
SHGC: SHGC=0.23
13. Cooling systems
kBtu/hr Efficiency
c. U-Factor: Sgl, U=0.29
9.50 ft2
a. Central Unit
23.0 SEER:14.00
SHGC: SHGC=0.24
d. U-Factor. N/A
ft2
14. Heating systems
kBtu/hr Efficiency
SHGC:
a. Electric Strip Heat
17.0 COP:1.00
Area Weighted Average Overhang Depth:
2.000 ft.
Area Weighted Average SHGC:
0.389
8. Skylights Description
Area
15. Hot water systems - Replacement equipment Cap: 40 gallons
a. U-Factor(AVG): N/A
ft2
a. Electric
EF: 0.95
SHGC(AVG): N/A
b. Conservation features
9. Floor Types
Insulation
Area
None
a. Slab -On -Grade Edge Insulation
R=0.0
1175.00 ft2
Credits (Performance method)
CF, Pstat
b. N/A
R=
ft2
c. N/A
R=
ft2
I certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a new EPL Display Card will be completed
based on installed Code compliant features.
Builder Signature:
Address of New Home:
Date:
City/FL Zip:
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
2/23/2021 10:40 AM 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1