Loading...
HomeMy WebLinkAboutCell Tower - FTP Site No. PIFL067.150' Cell Tower - Caisson Foundation.2...Report Number: Service Date: Report Date: Task: Client Ft. Pierce, FL DiGiorgio Road and Enterprise Road 150 Foot Monopole Cell Tower - Fort Pierce Site No. PIFL067Electrical Design Consultants Attn: Jason Smith 23 Overbrook Ct Newnan, GA 30263 (772) 343-9787 Reg No: 6870 Port St Lucie, FL 34986-2261 645 NW Enterprise Dr Ste 107 HB201044.0002A 10/07/20 11/05/20 Revision 3 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: HB201044 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 4509RW Maschmeyer Material Information 1121 649 Plant: Ticket No.: 104 2472817 Field Test Data Test Air Content (%): Result Specification 7 3/4 8.5 ±1.5 2.25 3 88 N/A 86 N/A N/A 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.):N/A Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:10/07/20 1200 Michael Cohen Sunny 10 10 150' Monopole Cell Tower - Caisson Foundation (Bottom Half) Sample Location: Placement Method:Tremie pipe Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): 150' Monopole Cell Tower - Caisson Foundation (Bottom Half) Placement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 1 A 4.02 12.69 10/08/20 10/10/20 3 72,709 3 5,730 EKY 1 B 4.01 12.63 10/08/20 10/14/20 7 81,211 2 6,430 MG 1 C 4.01 12.63 10/08/20 10/21/20 14 90,070 3 7,130 EKY 1 D 4.01 12.63 10/08/20 11/04/20 28 99,812 3 7,900 EKY 1 E 4.02 12.69 10/08/20 11/04/20 28 96,464 3 7,600 EKY 1 F 4.02 12.69 10/08/20 11/04/20 28 94,098 2 7,410 EKY Average (28 days) 7,640 1 G 10/08/20 Hold Initial Cure:Final Cure:Outside in shade Water Storage Tank Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. First (1st) Set of Test Cylinders The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Ft. Pierce, FL DiGiorgio Road and Enterprise Road 150 Foot Monopole Cell Tower - Fort Pierce Site No. PIFL067Electrical Design Consultants Attn: Jason Smith 23 Overbrook Ct Newnan, GA 30263 (772) 343-9787 Reg No: 6870 Port St Lucie, FL 34986-2261 645 NW Enterprise Dr Ste 107 HB201044.0002A 10/07/20 11/05/20 Revision 3 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: HB201044 Samples Made By: Terracon Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Field testing in accordance with ASTM C31. Services: Reported To: Contractor: Report Distribution: (1) Electrical Design Consultants, jws@graneto.com (1) RW Harris Inc, andy@rwharrisinc.com EDC Client ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C173, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Michael Cohen The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Ft. Pierce, FL DiGiorgio Road and Enterprise Road 150 Foot Monopole Cell Tower - Fort Pierce Site No. PIFL067Electrical Design Consultants Attn: Jason Smith 23 Overbrook Ct Newnan, GA 30263 (772) 343-9787 Reg No: 6870 Port St Lucie, FL 34986-2261 645 NW Enterprise Dr Ste 107 HB201044.0002A 10/07/20 11/05/20 Revision 3 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: HB201044 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 4509RW Maschmeyer Material Information 1229 616 Plant: Ticket No.: 104 2472828 Field Test Data Test Air Content (%): Result Specification 7 1/2 8.5 ±1.5 2.5 3 88 N/A 86 N/A N/A 4,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.):N/A Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:10/07/20 1307 Michael Cohen Sunny 60 10 150' Monopole Cell Tower - Caisson Foundation (Top Half) Sample Location: Placement Method:Other (Please see Comments) Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): 150' Monopole Cell Tower - Caisson Foundation (Top Half) Placement Location: Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By 2 A 4.02 12.69 10/08/20 10/10/20 3 69,339 2 5,460 EKY 2 B 4.01 12.63 10/08/20 10/14/20 7 77,278 1 6,120 MG 2 C 4.01 12.63 10/08/20 10/21/20 14 90,905 3 7,200 EKY 2 D 4.01 12.63 10/08/20 11/04/20 28 94,824 3 7,510 EKY 2 E 4.02 12.69 10/08/20 11/04/20 28 93,458 2 7,360 EKY 2 F 4.02 12.69 10/08/20 11/04/20 28 92,603 3 7,300 EKY Average (28 days) 7,390 2 G 10/08/20 Hold Initial Cure:Final Cure:Outside in shade Water Storage Tank Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Second (2nd) Set of Test Cylinders The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 4CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Ft. Pierce, FL DiGiorgio Road and Enterprise Road 150 Foot Monopole Cell Tower - Fort Pierce Site No. PIFL067Electrical Design Consultants Attn: Jason Smith 23 Overbrook Ct Newnan, GA 30263 (772) 343-9787 Reg No: 6870 Port St Lucie, FL 34986-2261 645 NW Enterprise Dr Ste 107 HB201044.0002A 10/07/20 11/05/20 Revision 3 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: HB201044 Samples Made By: Terracon Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Field testing in accordance with ASTM C31. Services: Reported To: Contractor: Report Distribution: (1) Electrical Design Consultants, jws@graneto.com (1) RW Harris Inc, andy@rwharrisinc.com Michael, O'Connor, P.E. Principal, FL Reg. No. 44082 EDC Client Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C173, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Michael Cohen The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 4 of 4CR0001, 11-16-12, Rev.6