Loading...
HomeMy WebLinkAboutMisc. LettersS_ . RECEIVED OCT 0-7 2020 10/7/2021 St. Lucie County Permitting Mr. Mark Fick 9309 S Indian River Drive Fort Pierce, FL 34982 a `iRi, _ den, _G 'e St. Lucie County Planning and Development 2300 Virginia Avenue Fort Pierce, FL 32982 Re: Level 3 Remodel of 9309 S Indian River Drive/ID 3519-441-0002-000-1 Dear Mr. Darden: Attached please find the plans and other documents for the above -referenced residential project. As per our phone conversation, we still have three outstanding code inspections on SLC2101- 0336, which are the insulation, electrical final, and final inspections (141,280 and 999). Because the material for these final items would have to be removed and discarded for the new permit, we are requesting that SLC2101-0336 be closed out with issuance of the new permit. I will be acting as the Owner/Builder, so if any additional information is needed, please feel free to contact me by phone or email, which are provided below. Sincerely, Mark L. Fick 936-443-3403 far nerfick0gmail.com RECEIVED Mark and Lawrence Fick O C T 0 7 2020 9309 S Indian River Dr, Fort Pierce, FL St. Lucie Countv Permit»;, - LEVEL 3 REMODEL in 2 PHASES PHASE 1 (see drawings A2.1, ME2.21: Remove and replace exterior doors and windows (g(DC qC(qD1 windows next to bedroom #1 window,0F 15 and glass block above cookD1 be replaced in phase 2 under a separate Home Depot permit. Remainder previously replaced under SLC2101-0336 or SLC2108-0832. Shore up front porch and carport. Rework front porch, carport, and soffit profiles per. A4.1 & A4.2. Install new Galvalume roof (under separate permit). Through FPL, install underground service to new meter location. Disconnect and remove existing electrical from phase 1 area and rough in new electrical and plumbing. Install insulation and drywall and new plumbing and electrical fixtures in Phase 1 area. Install new septic tank, drain field, and water well under separate Health Department permits. Install new propane tank, and lines under separate permit. Disconnect old electrical meter and connect new meter. PHA SF 2- Remove existing electrical, plumbing, and pertinent interior walls (shore as necessary) from remainder of house. Install window ®assembly under a separate Home Depot permit. Repair exterior stucco around all replaced windows and doors. (And all other areas as necessary) Cut into slab to install DWV lines for bath 1&2. Connect DWV lines to new septic tank. Backfill, install vapor barrier and rebar, and pour concrete into slab voids. Install new interior walls per remodel floor plan. Rough in electrical and plumbing. Install insulation and drywall and new plumbing and electrical fixtures in remainder of house. Install mini -split air conditioning system under a separate permit. 2alcrr�•zr rrurs +—f�r�lt2 WIfJ ffEi•:JfE WALLMPF—L_EOrND �_— ul5rl.,, t44._ ixiVt cc CYU _ x`Y vIR'PhR FA511::T+ I: z+:;tis o:r• ac Lrrfm rf uy NNe4LL'x/ f_IiC N NL. �w SLaca v�av Fc xb O ripl G R-P.L O ,.�.�Fu3T.0?Pix te,lEl./HAY �_ 0 x om At.2 -0- E%ISr D•-D' J -> s 1 Ed! I—f-- tl II � gg qr \\Sfi e CeryvH a �c,;�1 i = lm urRX I L-1 I II I I 1 1 II Lill, nnttu� _ 11 11 11 gtchanl DNing lk e927d• li Y of I I I I I II Co 1 1 I , PORCH LY I 1 II � 1 � --- r\ f� hBedRovm#2 BedRoom#1 i mt. at3T ; i tt MULTI -PURPOSE RM. Enty L:r �y It .,.4j 1 1 I I I FLOOR"-P_LAN KEY NOTES . xn. W+:rw ++ u:s1We rruPea �-- -, o13Y,Lt +A♦>: MW� e:10 [rn.m+G a•[Inn: �_ i�cv+ usrin D:ae o+ mmd arvml3. Wm PI m. ++ fa"¢r_ W.m sro• -- +rrtxc w r+u Wm w F[Yxrcam: n+F or nnsva: sur a nwawn Y:+ncavAL enu urr. Yesu.R. ee A law Lr+ln-WAr n91 c r .• 1A�ria+rl+. --- M rcn e�rErRCm M�YrF'o'+rn lP[Yutx Jtilb lat2li%c-w— R2tt+. no1 1 Lru+iL•L llrt AMC U' 4 .—Ir, icUr 1p YeR>t !A+rv[ A+rJ C4YE Irt CF 1 art aW Hc- rnw Tr[ ¢+:trl[ unm c;r4 1 a np ALI11-3 (sl _re W/ I 1 C /Y c_r..D D![Y4 L'I rV ue,i 3-IrY n+V. [[.V lD 3F.i A, LP1iR KP 1¢x C([R 'Jila`:r. NS1A1L 4 1 Da:LLc sWn, ttcr. c:m .xt44nv+/ :u15 I, 1 S. [.•�Sn+Y. a?'D +P/.C{YC. 31C x: nxno. 1 YD rsx CCSL Ir•- e+ (-e [lN4YKH rrF C4•FlOFenoHl Icuss r-AR¢- rrn IM1V„F as I 1: PRIW R:N? s-.D J>WS AS P.NpEa 41 nrt nllePCED rflr G 1 1, (+q W9RSE DF L]AS: P_DO! IN .1 lw Cl E-16 ttt1+rvG la Iwl LKm 1 C NCW NLL ErzsvuJr ND F[Y 1 o:YlYS SKI[Y lKenal. 1 ' t7 ADD —E ulul:',3+ P;AF LDS r . L ALL .NICi •� 1 I I \ - RICHARD E. -L- • ATWOOD ARCHrrECT nn.d ro Graphic Designer �� I! LIC. e AR Wg444 1 e J I 3 I A,., I Interior Kitchen Elevation Fort Farce, R 349e2 i A3._• SGaLE Ua•-r-o• Ne• HALF s¢M 407-304-0264 1 reededigll-gmaj=m I 1 .T ^1 `:I IJ+ ssl { E Remodel for Ell, M/M Mark Flck I „ \ I,, li ,•�� � �i i / . / \ RESIDENCE Interior Kitchen Elevation r�RVER DF°� SCALE 1/a-rb• r1/e• ElLF SIZE) LNINr, AREA Laodb.W "°"'QF t PROPOSED FLOOR PLAN rul[adX—dA W&n AL UnN-ma ea IT SCALE : ,/e.r-o•0/e•HALF sm mtpat - 63780 IT AJ._ R-h 24100 Pr g underroer-SWSOFT - A1.2 11g"r'" zo-sox PHASE 1 & 2 PROPOSED FLOOR PLAN A3,2 + 8-31-11 u.n X tlmNM October 21, 2021 Mark L. Fick 9309 S. Indian River Dr. Ft. Pierce, Florida 34982 936-443-3403 farmerfick@gmail.com Dear Ms. Waters, In reference to permit #2110-0207 I am enclosing documents to respond to your comments. 1st comment "title block to indicate 2007 NEC per 2020 FBC 107." iResponse: Have amended title block. See new page A0.1. -�--� 2nd comment "clarify MDP & meter in the same room as shower and laundry sink per 240.24(E)." Ej &-, 'w! D ? 3rd comment "per FPL/FPUA electric service standards please provide authorization for meter location as shown on plans." Response: laundry, laundry sink and outside shower are roofed over but part of the exterior of the house (extension of the carport). They will have privacy panels around them (see attached and note 8 page A4.1), but a person will be able to walk up to the meter and shutoffs unobstructed. 4th comment "needs separate permit for fuel tank n 5th comment "needs subcontractor agreement for interior gas piping n 6th comment "needs gas schematic for interior piping. No details on plans per FBC 107." Response: see attached documents. V 7th comment "needs details for overhang extension note 15 on A4.1 per FBC 107." Response: see new page A4.2. e < r+ 8th comment "needs detail of rework roof at utility room. See note 4a on A4.1, per FBC 107." Response: see new page A4.2. Stz.e 1 ed ei^ c VII�th comment "needs details/installation instructions for kitchen exhaust flue per FBC 107." Response: see attached documents and new page M3.1. V 10th comment "needs energy talcs & manual J per FBC 107." Response: see attached documents. 11th comment "needs shoring details per note 3 on A4.1 " Response: see attached documents. 12th comment "needs slab repair detail at new DW V." Response: see new page A4.2. 13th comment "separate permit required for phase 2 work area. " Response: We are providing documents for the whole remodel in the hope that it can be accomplished under one permit. That would require that we rough in the plumbing and electrical on the south part of the house, hook up the south phunbing to the new septic tank, and the south electrical to the new underground electrical service. Then we would do the same for the north part. That would require two separate rounds of plumbing/electrical rough in inspections, and two separate rounds of plumbing. electrical final inspections. Would it be possible to do partial electrical and plumbing inspections, and pay for the extra inspections? plumbing rough in partial/electrical rough in partial (extra cost) plumbing final partial /electrical final partial (extra cost) . plumbing rough m/electricai rough in plumbing final/electrical final L . . .T If we are required to have two permits, can we start the second permit about 3 months after the first, with the first still open? Please let me know if you need anything else from me. Respectfully, Mark Fick Alphanette Waters Plans examiner St. Lucie County Dear Ms. Waters, This letter is in regards to commen(2�+,p[E7, 1st Comment "Clarify MDP & meter in the same room as shower and laundry sink per 240.24(E) damp location/not in bathroom. Needs 36" clearance at electrical equipment. NEC 110.26" Response: Per our phone conversation, the area in front of the Meter and MDP is a dedicated electrical space and will not be encroached upon by any doors. We eliminated the swing door from the attached plan pages A1.2, A2.1, A3.2, A4.1, A4.2, M3.1 and E3.1. The shower has more than 39" of clearance from the equipment and the door will swing inwards. 5th Comment: "Needs detail of rework roof at utility room. See note 4A on A4.1. Per FBC 107. Needs grade and size & attachment of ledger." Response: See page A0.1(structural lumber & framing notes), A4.2(detail at utility roof). 7th Comment "Separate permit required for phase 2 work area." Response: Agreed. Respectfully, Mark L. Fick 9309 S. Indian River Dr. Ft. Pierce, FI.34982- farmerFick@gmail. com 9364433403 S % Nt"�t77 1 CI-0 S tZ GUT Vi 0 P-1L O vs� i;-r ;t TT� Ns PIZ iIm I-1� (,&-)( 'T H I -t J�SS`) AuVGL 0E- 7—LA► S T�EpM l—f -J O ( -- U 3 �S