HomeMy WebLinkAboutAPPROVED A0.0 GENERAL NOTESMATERIAL LEGEND
ABBREVIATIONS
ANCHOR
ACOUSTICAL
AIR CONDITIONING
AL OR ALUM
BLK'G
ANOD.
BD
B.F.F.
BLK
CEM
C.J.
CLG
COL
CL
CONC
CONT
COVER'G
DTL/DTLS
DIM
DBL
ELECT/ELEC
D/W
E.A.
EXH.
ELEV.
EL.
EXIST.
EXP.
F.E.
EXT.
F.D.
FIRE EXT. CAB.
F.O.I.C.
FLUOR
GWB
FIN.
GA
GYP. BD.
GALV.
GL
GS
HM
CER
C.F.V.
ACOUSTICAL CEILING PANEL
ABOVE FINISH FLOOR
ALUMINUM
BLOCKING
ANODIZE
BOARD
BELOW FINISH FLOOR
BLOCK
CEMENT
CERAMIC
CONTRACTOR FIELD VERIFY
CONTROL JOINT
COLUMN
CEILING
CLOSET
COVERING
CONTINUOUS
CONCRETE
DIMENSION
DOUBLE
DETAILS
DISH WASHER
EACH
ELECTRICAL
ELEVATION
ELEVATOR
EXHAUST
EXISTING
EXTERIOR
EXPANSION
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FLUORESCENT
FINISH
GAUGE
GYPSUM WALL BOARD
GYPSUM BOARD
HOLLOW METAL
GALVANIZED
GALVANIZED STEEL
GLASS
A
A/C
ACOUST
A.F.F.
ACP
HT
I.D.
HORIZ
INSUL.
H.B.
INTERM
JAN.
MANUF.
MIN
MAT
MAX
MTL
NEOPR
NIC
O.S.
O.C.
O.D.
L.P.
PTN
PJ
PNL
PL
RM
P.T.
PLAM
PLYWD
REQ'D
REINF.
R.D.
SHT
SIM
STD.
SCH
STL
S.S.
SECT
SPEC'S
STRUCT
PH.
SC
TEMP
VCT
VERT
VEST.
WH
JANITOR
INTERIOR DIMENSION
HEIGHT
HORIZONTAL
HOSE BIBB
INSULATION
INTERMEDIATE
MINIMUM
MANUFACTURER
MATERIAL
MAXIMUM
METAL
NOT IN CONTRACT
OUTSIDE DIMENSION
OVERFLOW SCUPPERS
NEOPRENE
ON CENTER
PARTITION
PANEL JOINT
LIGHT POLE
PLATE
PLYWOOD
PANEL
PLASTIC LAMINATE
PRESSURE TREATED
REINFORCING
REQUIRED
ROOM
ROOF DRAIN
SCHEDULE
SHEET
STEEL
SECTION
SIMILAR
SPECIFICATIONS
STRUCTURE
TELEPHONE
SOLID CORE WOOD
TEMPERED
VINYL COMPOSITION TILE
VERTICAL
VESTIBULE
WATER HEATER
STAINLESS STEEL
STANDARD
SYMBOLS LEGEND
CENTER LINE
PROPERTY LINE
1t
1t
SIM
1
A101
SECTION MARK
WINDOW TAG
DOOR TAG
ngvd
??.??'
SITE TERRAIN ELEV.
WATER METER
ELECTRICAL METER
1
Room name
101
SIM
DATUM FLOOR ELEV.A101
1
?KEYNOTE TAG
BREAKLINE
LP
4"
1i
CHANGE OF ELEVATION
12
WALL TYPE TAG
RAIN WATER
SLOPE ARROW
+ ?? PSF
- ?? PSF
N
NORTH ARROW 0 GRID BUBBLE TAG
WINDOW PRESSURE
5
1i
Name
Elevation LEVEL HEAD CIRCLE
ROOF SLOPE TAG
CURTINE WALL TAG
CALLOUT HEAD TAG
REVISION TAG
ROOM TAG
ELECTRICAL PANEL
LOW POINT
ELEVATION
SPOT ELEVATION
69. REFERENCE TO ANY DETAIL OR
DRAWING IS FOR CONVENIENCE ONLY
AND DOES NOT LIMIT THE APPLICATION
OF SUCH DETAIL OR DRAWING. ANY
INFORMATION ON THESE DRAWINGS
APPEARING TO BE UNCLEAR OR
AMBIGUOUS SHALL BE REFERRED TO
THE ARCHITECT FOR INTERPRETATION
AND CLARIFICATION.
70. THE CONTRACTOR SHALL PROVIDE
SITE AND BUILDING ACCESS TO THE
ARCHITECT, CITY FIELD INSPECTORS,
AND ANY OTHER PERSON REQUIRED OR
ENTRUSTED WITH INSPECTIONS OF THE
PROJECT.
71. COORDINATE WORK OF TRADES AND
SCHEDULE ELEMENTS OF ALTERATIONS,
DEMOLITION AND RENOVATION WORK BY
PROCEDURES AND METHODS TO
EXPEDITE COMPLETION OF THE WORK.
72. CUT, MOVE, OR REMOVE ITEMS AS
NECESSARY TO PROVIDE ACCESS OR TO
ALLOW ALTERATIONS AND NEW WORK
TO PROCEED. INCLUDE SUCH ITEMS AS:
A - REPAIR OR REMOVAL OF
HAZARDOUS OR UNSANITARY
CONDITIONS
B - CLEANING OF SURFACES AND
REMOVAL OF SURFACE FINISHES AS
NEED TO INSTALL NEW WORK AND
FINISHES.
73. ASSIGN THE WORK OF MOVING,
REMOVAL, CUTTING & PATCHING TO
TRADES QUALIFIED TO PERFORM THE
WORK IN A MANNER TO CAUSE THE
LEAST DAMAGE TO EACH TYPE OF
WORK, AND PROVIDE MEANS OF
RETURNING TO APPEARANCE TO NEW
WORK.
74. PERFORM CUTTING AND REMOVAL
WORK TO REMOVE MINIMUM
NECESSARY AND IN A MANNER TO AVOID
DAMAGE TO ADJACENT WORK.
75. CUT FINISH SURFACES SUCH AS
MASONRY, GYPSUM WALLBOARD,
STUCCO, WALLCOVERING, TILE,
PLASTER, OR METALS, BY METHODS TO
TERMINATE SURFACES ON A STRAIGHT
LINE AT A NATURAL POINT OF DIVISION.
76. CONTRACT DOCUMENTS WILL NOT
DEFINE PRODUCTS OR STANDARDS OF
WORKMANSHIP.
59. "SIM." SHALL MEAN COMPARABLE
CHARACTERISTICS FOR THE CONDITIONS
NOTED. VERIFY DIMENSIONS AND
ORIENTATION ON PLANS AND
ELEVATIONS.
60. ALL ITEMS SHOWN AS FURNISHED BY
OWNER REQUIRE BUILDER COORDINATION.
61. DO NOT SUPPORT ANY
CONSTRUCTION FROM THE OWNER'S
STRUCTURE OR PENETRATE ANY FLOOR
SLABS WITHOUT APPROVAL FROM THE GC
PRIOR TO CONSTRUCTION. DO NOT
SUSPEND ANY ITEMS FROM THE BOTTOM
CHORD OF ROOF JOIST AND JOIST
GIRDERS WITHOUT PRIOR WRITTEN
APPROVAL OF THE STRUCTURAL
ENGINEER OF THE PROJECT.
62. THE CONTRACTOR SHALL MAINTAIN,
FOR THE ENTIRE DURATION OF THE
WORK, ALL EXITS,S AND ALARMS IN
CONFORMANCE WITH ALL APPLICABLE
CODES AND ORDINANCES.
63. DURING ALL PHASES OF WORK, DO
NOT DISTURB THE DELIVERIES AND
FUNCTIONS OF ADJACENT NEIGHBOR.
COORDINATE WITH BUILDER.
64. PROVIDE NON-COMBUSTIBLE
BLOCKING AND/OR SUPPORT FRAMING TO
ASSURE A COMPLETE INSTALLATION OF
FINISHES, TRIM, AND MILLWORK AS
INDICATED IN THE DOCUMENTS AND
REQUIRED BY THE ARCHITECT, PRODUCT
MANUFACTURERS, AND AS REQUIRED
FOR INSTALLATION. PROVIDE ADEQUATE
BLOCKING AS REQUIRED TO SUPPORT
BASE AND UPPER WALL CABINETS,
LAVATORIES, TOILET FIXTURES, AND
ACCESSORIES, ELECTRIC PANELS,
ACCESS LADDERS, ETC.
65. THE BUILDER SHALL
CONFIRM ALL LOCATIONS FOR BLOCKING
FOR ALL FIXTURES AND CASEWORK AS
REQUIRED BY THE FIXTURE
MANUFACTURER.
66. NOT USED.
67. THE BUILDER IS
RESPONSIBLE FOR COORDINATING THE
WORK OF ALL UTILITY COMPANIES AND
PERFORMING ALL WORK REQUIRED BY
THEM. THE CONTRACTOR IS RESPONSIBLE
FOR PROPER COMPACTION OF UTILITY
TRENCHES, BOTH INTERIOR AND
EXTERIOR. THE CONTRACTOR SHALL PAY
FOR AND OBTAIN ALL PERMITS AND
CERTIFICATES OF OCCUPANCY.
68. UNLESS OTHERWISE INDICATED, EACH
SUBCONTRACTOR IS RESPONSIBLE FOR
ADEQUATELY BRACING AND SUPPORTING
ALL ITEMS FROM THE ROOF STRUCTURE
FOR GRAVITY LOADS AND TO RESIST
MOVEMENTS AS REQUIRED BY ALL
APPLICABLE CODES. (ANY BRACING W/ A
SIGNIFICANT VISUAL IMPACT IS SUBJECT
TO ARCHITECTURAL REVIEW AND
APPROVAL. THIS INCLUDES BUT IS NOT
LIMITED TO ALL ITE MS BRACED TO,
SUSPENDED FROM, OR SUPPORTED BY
ROOF STRUCTURE.
49. THESE DRAWINGS ARE PREPARED FOR
PURPOSES OF CONSTRUCTION ONLY.
THESE DRAWINGS ARE NOT TO BE USED
FOR MAINTENANCE PURPOSES AS ACTUAL
CONDITIONS MAY VARY FROM THOSE
SHOWN ON DRAWINGS DUE TO CHANGE
ORDERS, ALTERATIONS BY OTHERS, FIELD
CONDITIONS, ETC.
50. THESE DRAWINGS AND RELATED
DOCUMENTS DETAIL THE WORK FOR THIS
SPECIFIC BUILDING & SPACE INDICATED
BY JOB NAME AND NUMBER AND
LOCATION. THE DOCUMENTS REMAIN THE
PROPERTY OF THE ARCHITECT AND MAY
NOT BE USED FOR ANY OTHER PROJECT
OR PURPOSE WITHOUT WRITTEN
AUTHORIZATION OF THE ARCHITECT.
51. DO NOT SCALE DRAWINGS. PROMPTLY
CONTACT THE ARCHITECT IMMEDIATELY
FOR CLARIFICATION OF ANY ERROR,
OMISSION, OR DISCREPANCY.
52. ALL WORK SHALL BE NEW.
53. ALL FRAMING LUMBER, PLYWOOD, AND
CONCEALED WOOD SHALL BE
FIRE-RETARDANT TREATED (FRT). NO FRT
IN CEILING PLENUM
54. PROVIDE FRT WOOD BLOCKING 8" FOR
ALL HOOKS, TOILET ROOM ACCESSORIES
AND ANY OTHER WALL MOUNTED
EQUIPMENT.
55. ANY DRILLING, WELDING, OR OTHER
ATTACHMENT TO THE STRUCTURAL
SYSTEM SHALL BE SUBJECT TO APPROVAL
BY THE BUILDER & STRUCTURAL ENGINEER
PRIOR TO THE COMMENCEMENT OF SUCH
WORK.
56. THE ARCHITECT HAS MADE NO
INVESTIGATION TO DETERMINE IF
ASBESTOS OR ANY OTHER MATERIALS IS
PRESENT IN THE EXISTING WORK. THE
ARCHITECT ASSUMES NO RESPONSIBILITY
WITH REGARD TO ASBESTOS OR ANY
OTHER HAZARDOUS MATERIAL. NO
WARRANTY OR REPRESENTATION, EITHER
EXPRESSED OR IMPLIED, IS MADE BY
THESE PLANS AS TO THE SUITABILITY OF
REMOVING ANY HAZARDOUS MATERIALS
INCLUDING ASBESTOS. ALL PERSONS
USING THESE PLANS MUST PROCEED AT
THEIR OWN RISK WITH REGARD TO ALL
MATERIALS INCLUDING ASBESTOS. IF ANY
MATERIAL SUSPECTED OF BEING
HAZARDOUS IS ENCOUNTERED, LEAVE
INTACT AND UNDISTURBED AND NOTIFY
THE ARCHITECT IMMEDIATELY.
57. "TYPICAL" MEANS THAT THE SITUATION
IS REPRESENTATIVE FOR SIMILAR
CONDITIONS THROUGHOUT THE PROJECT.
UNLESS OTHERWISE NOTED, DETAILS ARE
KEYED AND NOTED AS "TYP" ONLY THE
FIRST TIME THEY APPEAR.
58. "HOLD" DIMENSIONS INDICATE THAT
PREFABRICATED SYSTEMS ARE TO BE
INSTALLED THAT REQUIRE A MINIMUM
DIMENSION. MAINTAIN THIS DIMENSION.
THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR CONTACTING ALL
SUBCONTRACTORS AND VENDORS TO
COORDINATE CONSTRUCTION
REQUIREMENTS, DELIVERY SCHEDULE,
40. ANY WORK INVOLVING THE CUTTING,
PENETRATION THROUGH, NEW ROOF
PENETRATIONS, TRENCHING OR MODIFICATION
OF STRUCTURAL ELEMENTS OF THE BUILDING
SHELL, OR THE INTERRUPTION OF OWNER/BASE
UTILITY SYSTEMS, ETC. SHALL BE COORDINATED
WITH THE BUILDER PRIOR TO THE COMMENCEMENT
OF WORK. IF SO STIPULATED IN THE BUILDERS
CONSTRUCTION CRITERIA, PERMISSION SHALL
BE SECURED IN WRITING. IF REQUIRED, THE
BUILDERS DESIGNATED CONTRACTOR SHALL
BE CONTRACTED TO PERFORM THE WORK. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR
TO BE FAMILIAR WITH ALL OF THE
REQUIREMENTS OF THE BUILDERS
CONSTRUCTION CRITERIA, TO SECURE
PERMISSION AS REQUIRED BY THE BUILDER
AND TO ONLY OPERATE DURING HOURS
DESIGNATED.
41. ALL FINISHES MUST MEET FLAME SPREAD
RATINGS. IT SHALL BE THE RESPONSIBILITY OF
THE BUILDER TO SUBMIT FLAME
SPREAD RATING INFORMATION TO THE LOCAL
BUILDING OFFICIAL IF SO REQUESTED.
42. THE BUILDER SHALL PROVIDE
A PORTABLE FIRE EXTINGUISHER WITH A
RATING OF NOT LESS THAN 3A 40BC WITH A
SEVENTY-FIVE FOOT TRAVEL DISTANCE TO ALL
PORTIONS OF THE BUILDING OR AS DIRECTED
BY THE FIRE DEPARTMENT FIELD INSPECTOR.
43. THE BUILDER SHALL BE
RESPONSIBLE FOR CHECKING IN AND
VERIFYING ALL SHIPMENTS OF
OWNER-SUPPLIED MATERIALS. THIS INCLUDES
VERIFYING PACKING LISTS AGAINST ORDER
FORMS AND BILLS OF LADING. THE
CONTRACTOR WILL BEAR THE COST OF
EXPEDITED FREIGHT CHARGES IF MISSING
ITEMS ARE NOT IDENTIFIED AT THE TIME OF
PACKAGE RECEIPT. THE CONTRACTOR IS
RESPONSIBLE FOR FILING DAMAGE REPORTS
FOR GOODS RECEIVED DAMAGED. THE
CONTRACTOR SHALL MAINTAIN AN ENVELOPE
CLEARLY MARKED "PACKING SLIPS" FOR ALL
LADING, PACKING SLIPS, USER MANUALS,
WARRANTY INFORMATION, AND PAPERWORK.
UPON COMPLETION OF THE PROJECT, THIS
ENVELOPE SHALL BE GIVEN TO THE OWNER.
44. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE DAILY CLEANUP OF THE
PROJECT SITE AS WELL AS THE FINAL CLEANUP
JUST PRIOR TO TURNOVER. ALL TOOLS,
MACHINERY, EQUIPMENT, AND MATERIALS
SHALL BE REMOVED AND THE PREMISES SHALL
BE LEFT IN A NEAT AND ORDERLY MANNER.
45. DO NOT SCALE THE DRAWINGS
CONSULT THE ARCHITECT OF ANY
DISCREPANCY.
46. THE ARCHITECT HAS ENDEAVORED TO
SPECIFY AND/OR INDICATE MATERIALS THAT DO
NOT CONTAIN HAZARDOUS MATERIALS OR
ITEMS IN VIOLATION OF APPLICABLE CODES AND
LAWS OR REASONABLE BUILDING PRACTICES.
ALL CONTRACTORS, SUBCONTRACTORS, AND
VENDORS SHALL LIKEWISE ENDEAVOR TO
PROVIDE MATERIALS THAT DO NOT CONTAIN
HAZARDOUS COMPONENTS. NOTIFY THE
ARCHITECT OF ANY MATERIALS SPECIFIED OR
INDICATED FOR USE ON THE PROJECT SITE
THAT CONTAIN HAZARDOUS MATERIALS AND/OR
ASBESTOS.
47. WORK TO BE PERFORMED UNDER THIS
CONTRACT IS DEFINED BY ALL INFORMATION
INCLUDED IN THIS SET OF DOCUMENTS.
CONTRACTOR SHALL BE FAMILIAR AND FOLLOW
ALL CONSTRUCTION DRAWINGS.
48. ALL LABOR, MATERIALS, FINISHED
EQUIPMENT AND THE FINAL FINISHED PRODUCT
AS INDICATED BY THE PLANS, SPECIFICATIONS,
AND OTHER CONTRACT DOCUMENTS SHALL BE
SUPPLIED BY THE CONTRACTOR AS PER
GOVERNING STATE AND LOCAL CODES AND ANY
AND ALL OTHER REGULATIONS AND CODES
HAVING LOCAL JURISDICTION, AND ALL WORK
AS REQUIRED BY INSPECTION AGENCIES
HAVING JURISDICTION.
1. CONTRACTOR TO VERIFY ALL DIMENSIONS,
STUB-UPS, AND OTHER INFORMATION
CONTAINED HEREIN BEFORE BEGINNING ANY
WORK. CONTACT ARCHITECT IF ANY
DISCREPANCIES OCCUR.
2. IF ANY SUBSTITUTIONS ARE PROPOSED AND
APPROVED FOR SPECIFIC EQUIPMENT, THE
BUILDER WILL BE RESPONSIBLE
FOR ALL COORDINATION INCLUDING HVAC,
PLUMBING, AND ELECTRICAL.
3. WORK SHALL BE DONE IN ACCORDANCE WITH
ALL APPLICABLE CODES AND ORDINANCES IN
THE BUILDING AND ZONING CODE FOR LOCAL
AND THE FLORIDA BUILDING CODE.
4. CONTRACTOR SHALL INCLUDE ALL PERMITS,
LABOR, MATERIALS, & EQUIPMENT TO PROVIDE
FIRST CLASS AND COMPLETE INSTALLATIONS.
ALL MATERIALS AND EQUIPMENT SHALL BE NEW.
5. CONTRACTOR SHALL COORDINATE ROUGH-IN
REQUIREMENTS AND FINAL CONNECTIONS TO
EQUIPMENT. INSTALLATION SHALL MEET ALL
CODES AND BE IN ACCORDANCE WITH
EQUIPMENT MANUFACTURER'S
RECOMMENDATIONS. VERIFY AND PROVIDE AS
REQUIRED, ALL DISCONNECTING MEANS,
OVERLOAD PROTECTION, GROUNDING, ETC. TO
ASSURE PROPER INSTALLATION.
6. HAULING DEBRIS, JACK-HAMMERING OR WORK
PRODUCING LOUD VIBRATING NOISES, IS TO BE
DONE ONLY DURING HOURS COORDINATED WITH
GENERAL CONTRACTOR.
7. ACCEPTANCE OF WORK SHALL BE SUBJECT TO
GC, APPROVAL OF WORK IN PLACE AS WELL AS
SHOP DRAWINGS AND SAMPLES OF MATERIALS
AND EQUIPMENT. ALL SUBMITTALS SHALL BE
CHECKED & DIMENSIONS VERIFIED BY
CONTRACTOR BEFORE SUBMITTAL TO
ARCHITECT.
8. HAZARDOUS MATERIALS: IT IS NOT EXPECTED
THAT HAZARDOUS MATERIALS WILL BE
ENCOUNTERED IN THE WORK. IF MATERIALS,
SUSPECTED OF CONTAINING HAZARDOUS
MATERIALS, ARE ENCOUNTERED, DO NOT
DISTURB AND IMMEDIATELY NOTIFY GENERAL
CONTRACTOR.
9. WHEN UNANTICIPATED MECHANICAL,
ELECTRICAL OR STRUCTURAL ELEMENTS THAT
CONFLICT WITH INTENDED FUNCTION OR DESIGN
ARE ENCOUNTERED, INVESTIGATE AND
MEASURE THE NATURE AND EXTENT OF
CONFLICT AND PROMPTLY SUBMIT TO THE
ARCHITECT IN WRITING.
10. SITE ACCESS AND TEMPORARY CONTROLS:
CONDUCT AND DEBRIS-REMOVAL
OPERATIONS TO ENSURE MINIMUM
INTERFERENCE WITH ROAD, STREETS, WALKS,
WALKWAYS AND OTHER ADJACENT OCCUPIED
FACILITIES. CONTRACT TO COMPLY WITH ALL
CODES AND OBTAINED PERMITS REQUIRED FOR
TEMPORARY BARRIERS, ETC.
A: ERECT TEMPORARY PROTECTION, SUCH
AS WALKS, FENCES, RAILINGS, CANOPIES AND
COVERED PASSAGEWAYS, WHERE REQUIRED.
B: PROTECT EXISTING SITE IMPROVEMENTS
AND LANDSCAPING THAT ARE TO REMAIN.
77. PRESENCE OF A PRODUCT,
FINISH, OR TYPE OF
CONSTRUCTION, REQUIRES
THAT PATCHING, EXTENDING
OR MATCHING BE PERFORMED
AS NECESSARY TO MAKE
WORK COMPLETE AND
CONSISTENT TO IDENTICAL
STANDARDS OF QUALITY.
78. WHERE NEW WORK ABUTS
OR FINISHES FLUSH WITH
EXISTING WORK, MAKE A
SMOOTH AND FLAWLESS
TRANSITION. PATCHED WORK
SHALL MATCH EXISTING AND
ADJACENT WORK IN TEXTURE
AND APPEARANCE SO THAT
THE PATCH OR TRANSITION IS
INVISIBLE AT A DISTANCE OF 5
(FIVE) FEET.
79. WHEN FINISHED SURFACES
ARE CUT IN SUCH A WAY THAT
A SMOOTH TRANSITION WITH
NEW WORK IS NOT POSSIBLE,
TERMINATE EXISTING
SURFACE IN A NEAT MANNER
ALONG A STRAIGHT LINE AT A
NEUTRAL LINE OF DIVISION
AND PROVIDE TRIM
APPROPRIATE TO FINISHED
SURFACE.
80. GYPSUM WALLBOARD:
PAINT LEVEL FINISH 4
27. EXTERIOR CAULKING SHALL BE VINLOX
SEALANT (GUN-GRADE) OR AN APPROVED
EQUAL.
28. PROVIDE A MINIMUM OF 1/2" CEMENTITIOUS
BACKER BOARD AT PARTITIONS SLATED TO
RECEIVE CERAMIC TILE / STONE AND ALL WET
AREAS.
29. FLOORS AND WALLS: PROVIDE AN EVEN
SURFACE OF UNIFORM FINISH COLOR, TEXTURE
AND APPEARANCE.
30. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE SCOPE OF WORK AS
DEFINED IN THE CONTRACT DOCUMENTS,
INCLUDING, BUT NOT LIMITED TO THESE
CONSTRUCTION DOCUMENTS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO
PROPERLY NOTIFY THE ARCHITECT AND
CONSTRUCTION MANAGER OF ANY CONFLICTS,
ERRORS OR OMISSIONS IN THESE DRAWINGS.
31. THE CONTRACTOR IS RESPONSIBLE FOR
ALL COORDINATION BETWEEN
SUBCONTRACTOR, VENDORS, ETC. AS
NECESSARY TO COMPLETE THE WORK IN
ACCORDANCE WITH THE INTENT OF THE
CONTRACT DOCUMENTS. IN THE CASE OF
INCONSISTENCIES OR DISCREPANCIES BETWEEN
THE DRAWINGS, THE MOST STRINGENT NOTE OR
CONDITION SHALL APPLY.
32. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY EXISTING SITE
CONDITIONS PRIOR TO THE START OF.
ANY CONSTRUCTION WORK THE CONTRACTOR
SHALL BE RESPONSIBLE FOR NOTIFYING THE
BUILDER OF ANY UNCOVERED CONDITIONS
EFFECTING THE CONSTRUCTION, FIXTURING,
ETC.
33. FIELD VERIFY ALL DIMENSIONS AND
CONDITIONS PRIOR TO BEGINNING
CONSTRUCTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR COSTS INCURRED IF HE/SHE
DOES NOT NOTIFY THE CONSTRUCTION
MANAGER OR ARCHITECT IN A TIMELY MANNER.
34. IT IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR TO MAINTAIN COMPLIANCE WITH
INSURANCE REQUIREMENTS OF THE OWNER AS
STIPULATED IN THE CONTRACT DOCUMENTS.
35. THE CONTRACTOR SHALL MAINTAIN
A CONSTRUCTION SET ON-SITE AT ALL TIMES. AT
THE COMPLETION OF THE PROJECT THE
CONTRACTOR SHALL PROVIDE THE AS-BUILT SET
TO THE BUILDER.
36. SUBSTITUTIONS WILL NOT BE ALLOWED
UNLESS REQUESTED IN WRITING TO THE
CONSTRUCTION MANAGER. APPROVAL MUST BE
IN WRITING.
37. ALL WORK COMPLETED UNDER THIS
CONTRACT SHALL COMPLY WITH THE
PROVISIONS OF THE CONSTRUCTION
DOCUMENTS, THE CONSTRUCTION CRITERIA OF
THE OWNER, AND SHALL SATISFY ALL
APPLICABLE CODES, ORDINANCES, AND
REGULATIONS HAVING JURISDICTION. ANY
MODIFICATIONS TO THE WORK REQUIRED BY
SUCH AUTHORITIES SHALL BE PERFORMED BY
THE CONTRACTORS FOLLOWING
WRITTEN NOTIFICATION TO THE ARCHITECT.
CHANGES IN THE SCOPE OF WORK REQUIRED BY
SUCH AUTHORITIES SHALL ONLY BE
CONSIDERED FOR CHANGE ORDERS IF
SUBMITTED IN WRITING PRIOR TO ANY
PERFORMANCE OF THE WORK.
38. OSHA REQUIREMENTS SHALL BE
INCORPORATED INTO THE SCOPE OF WORK
EVEN THOUGH THEY ARE NOT LISTED
SEPARATELY.
39. THESE NOTES SHALL APPLY TO ALL
DRAWINGS AND GOVERN UNLESS OTHERWISE
NOTED. THE GENERAL CONTRACTOR SHALL
ALSO REFERENCE THE NOTES ON EACH
DRAWING SHEET INCLUDING MECHANICAL,
ELECTRICAL, PLUMBING, INTERIOR DESIGN, ETC.
AND INCORPORATE SUCH INTO THE SCOPE OF
THE WORK.
11. TEMPORARY FACILITIES: PROVIDE
TEMPORARY BARRICADES AND PROTECTION
REQUIRED TO PREVENT INJURY TO PEOPLE AND
DAMAGE TO FACILITIES THAT ARE TO REMAIN.
A: PROVIDE PROTECTION TO ENSURE SAFE
PASSAGE OF PEOPLE AROUND DEMOLITION ARE .
12. TEMPORARY PARTITIONS: ERECT AND
MAINTAIN DUST PROOF PARTITIONS AND
TEMPORARY ENCLOSURES TO LIMIT DUST AND
DIRT MIGRATION AND TO SEPARATE AREAS
FROM FUMES AND NOISE.
13. ALL EXISTING REQUIRED MEANS OF EGRESS
SHALL BE KEPT CLEAR & CLEAR OF DEBRIS
OBSTRUCTIONS.
14. ALL NEW INTERIOR & EXTERIOR SURFACES,
FINISHES, EQUIPMENT, AND FLOORS WILL BE
APPROVED BY ARCHITECT / OWNER /
OWNER'S REP.
15. ALL LIFE SAFETY, ENERGY MANAGEMENT,
AND COMMUNICATIONS DEVICES & SYSTEMS
ARE TO BE SUPPLIED BY THE CONTRACTOR. ALL
SYSTEMS MUST MEET APPLICABLE GOVERNING
CODES.
16. CONTRACTOR SHALL SUBMIT MARKED-UP
CLEAN PRINTS OF AS-BUILT CONDITIONS
SHOWING CONCEALED DEVIATIONS FROM
DESIGN. ON-SITE JOB COPY SHALL BE KEPT
CURRENT W/ REVISIONS AS THEY TAKE PLACE.
17. CONTRACTOR SHALL KEEP PREMISES OF
WORK AREA CLEAN DAILY, BROOM CLEAN AT
PROJECT COMPLETION, AND SHALL REMOVE ALL
REFUSE FROM SITE AND DISPOSE OF
ACCORDING TO LAW.
18. CONTRACTOR SHALL WARRANTY ALL NEW
WORK FOR A PERIOD OF TWO YEARS (MINIMUM)
FROM DATE OF ACCEPTANCE AND SHALL REPAIR
OR REPLACE ANY DEFECTIVE WORK INCLUDING
MATERIALS, LABOR, AND EQUIPMENT AT NO
ADDITIONAL COST TO THE OWNER.
19. UNLESS OTHERWISE NOTED, ALL
DIMENSIONS ARE TO FACE OF STUD ON CENTER.
20. PROVIDE ADEQUATE CONCEALED BLOCKING
AND ANCHORING FOR CEILING AND WALL
MOUNTED EQUIPMENT AND ACCESSORIES (i.e.
TOWEL BARS, SOFFITS, FANS, HANDRAILS,
21. CONTRACTOR SHALL PREPARE ALL
WORK AS PER THESE SHEETS AND SHALL ALSO
EXAMINE ALL SITE CONDITIONS AND VERIFY ALL
DIMENSIONS.
IN THE EVENT THAT FURTHER CLARIFICATIONS
OR INTERPRETATIONS NEEDED, CONTRACTOR
22. CONTRACTOR SHALL VERIFY AND SET IN ALL
CAST-IN INSERTS, ANCHORS, BOLTS, PLATES,
ETC. AS MAY BE REQUIRED FOR ATTACHMENT OF
THE VARIOUS BUILDING COMPONENTS PRIOR TO
PLACE OF CONCRETE.
23. CONTRACTOR SHALL VERIFY ALL FIXTURE
LOCATIONS AND CLEARANCES.
24. CONTRACTOR SHALL VERIFY AND
COORDINATE ALL ROUGH OPENINGS FOR
SCHEDULED DOORS, WINDOWS, AND DOOR
HARDWARE
25. ALL ROUGH-IN NAILS, BOLTS, AND
MISCELLANEOUS HARDWARE SHALL BE
GALVANIZED.
26. ALL WOOD IN CONTACT WITH CONCRETE
SHALL BE PRESSURE-TREATED.
CHANDELIERS, ETC.)
IN BATHROOMS PROVIDE 8" BLOCKING AROUND
WALLS AT TOILETS, SHOWERS FOR FUTURE
HANDICAPED HANRAILS. SEE FLOOR PLANS.
CALL THE ARCHITECT AS NECESSARY TO
COMPLETE THE JOB.
81. CORNER BEAD SHALL BE METAL,
TO BE PROVIDED AT ALL CORNERS.
ALL EXTERIOR TRIM SHALL BE OF PVC
MATERIAL CONFORMING TO ASTM
STANDARDS D1784, D1063 & D4216-99.
PVC PRODUCTS SHALL BE USED FOR
ALL EXTERIOR EXPOSURES. CAULK
ALL BUTT JOINTS, INTERSECTIONS &
ENDS.
NARROW FLANGE CASING BEAD MUST
BE USED AROUND OPENING OR
WHERE STUCCO TERMINATES AT A
DISSIMILAR SURFACE. NARROW
FLANGE CASING BEAD SHALL BE
METAL. ALL EXTERIOR ACCESSORIES
SHALL BE OF PVC MATERIALS
CONFORMING TO ASTM STANDARDS
D1784, C1063 & D4216-99. CAULK ALL
BUTT JOINTS, INTERSECTIONS & ENDS.
82. "V" CONTROL JOINT, CONTROL
JOINTS SHALL BE PLASTIC
COMPONENTS, INC. #2058. ALL
EXTERIOR ACCESSORIES SHALL BE OF
PVC MATERIAL CONFORMING TO ASTM
STANDARDS D1784, C1063 & D4216-99.
SHOULD BE USED IN ANY APPLICATION
WHERE A SURFACE AREA IS MORE
THAN 144 SQUARE FEET. CAULK ALL
BUTT JOINTS, INTERSECTIONS & ENDS.
REFER TO DETAIL 7/A600.
GENERAL NOTES
SHEET NUMBER
REVISIONS
This drawing is property of GMK, PALM BEACH,
FLORIDA. Any use of this drawing or the design
information hereon without written authorization of GMK
is strictly prohibited.
c 2021 GMK
PALM BEACH, FLORIDA
GMK
PLANNING - ZONING - DESIGN
G M KAGAN FAIA
205 WORTH AVENUE 201-111
PALM BEACH FL 33480
CELL: 203 988 1838
GMK@GMKPZD.COM
SOSNOWSKI RESIDENCE
Project Location:
3902 DUNESIDE DRIVE
FT PIERCE, FL 34949
CONSULTANTS
Project #: 2002
Architect: GERALD M. KAGAN
DATE : 08-25-2021
SHEET NAME:
SCALE: AS NOTED
PERMIT SET
INTERNATIONAL CONSULTING ENGINEERS &
DESIGN, LLC
4310 WEST BROWARD BLVD.
PLANTATION, FL 33317
T 561.707.6795 F 954.797.2847
CONTACT: JOE SPASOVSKI, P.E.
UNISONSTRUCTURALDESIGN
7522 WILES RD, SUITE B204
CORAL SPRINGS, FL 33067
PHONE: (954) 323-3746
MOBIL: (305) 298-0467
EMAIL:
UNISONSTRUCTURALDESIGN@GMAIL.COM
WEB:
UNISONSTRUCTURALDESIGN.COM
DATE : 10-06-2021
GENERAL NOTES
A0.0
2 10/05/21 BDC COMMENTS
2
3 10/21/21 BDC COMMENTS
3