HomeMy WebLinkAboutAPPROVED A0.0 GENERAL NOTESMATERIAL LEGEND ABBREVIATIONS ANCHOR ACOUSTICAL AIR CONDITIONING AL OR ALUM BLK'G ANOD. BD B.F.F. BLK CEM C.J. CLG COL CL CONC CONT COVER'G DTL/DTLS DIM DBL ELECT/ELEC D/W E.A. EXH. ELEV. EL. EXIST. EXP. F.E. EXT. F.D. FIRE EXT. CAB. F.O.I.C. FLUOR GWB FIN. GA GYP. BD. GALV. GL GS HM CER C.F.V. ACOUSTICAL CEILING PANEL ABOVE FINISH FLOOR ALUMINUM BLOCKING ANODIZE BOARD BELOW FINISH FLOOR BLOCK CEMENT CERAMIC CONTRACTOR FIELD VERIFY CONTROL JOINT COLUMN CEILING CLOSET COVERING CONTINUOUS CONCRETE DIMENSION DOUBLE DETAILS DISH WASHER EACH ELECTRICAL ELEVATION ELEVATOR EXHAUST EXISTING EXTERIOR EXPANSION FLOOR DRAIN FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FLUORESCENT FINISH GAUGE GYPSUM WALL BOARD GYPSUM BOARD HOLLOW METAL GALVANIZED GALVANIZED STEEL GLASS A A/C ACOUST A.F.F. ACP HT I.D. HORIZ INSUL. H.B. INTERM JAN. MANUF. MIN MAT MAX MTL NEOPR NIC O.S. O.C. O.D. L.P. PTN PJ PNL PL RM P.T. PLAM PLYWD REQ'D REINF. R.D. SHT SIM STD. SCH STL S.S. SECT SPEC'S STRUCT PH. SC TEMP VCT VERT VEST. WH JANITOR INTERIOR DIMENSION HEIGHT HORIZONTAL HOSE BIBB INSULATION INTERMEDIATE MINIMUM MANUFACTURER MATERIAL MAXIMUM METAL NOT IN CONTRACT OUTSIDE DIMENSION OVERFLOW SCUPPERS NEOPRENE ON CENTER PARTITION PANEL JOINT LIGHT POLE PLATE PLYWOOD PANEL PLASTIC LAMINATE PRESSURE TREATED REINFORCING REQUIRED ROOM ROOF DRAIN SCHEDULE SHEET STEEL SECTION SIMILAR SPECIFICATIONS STRUCTURE TELEPHONE SOLID CORE WOOD TEMPERED VINYL COMPOSITION TILE VERTICAL VESTIBULE WATER HEATER STAINLESS STEEL STANDARD SYMBOLS LEGEND CENTER LINE PROPERTY LINE 1t 1t SIM 1 A101 SECTION MARK WINDOW TAG DOOR TAG ngvd ??.??' SITE TERRAIN ELEV. WATER METER ELECTRICAL METER 1 Room name 101 SIM DATUM FLOOR ELEV.A101 1 ?KEYNOTE TAG BREAKLINE LP 4" 1i CHANGE OF ELEVATION 12 WALL TYPE TAG RAIN WATER SLOPE ARROW + ?? PSF - ?? PSF N NORTH ARROW 0 GRID BUBBLE TAG WINDOW PRESSURE 5 1i Name Elevation LEVEL HEAD CIRCLE ROOF SLOPE TAG CURTINE WALL TAG CALLOUT HEAD TAG REVISION TAG ROOM TAG ELECTRICAL PANEL LOW POINT ELEVATION SPOT ELEVATION 69. REFERENCE TO ANY DETAIL OR DRAWING IS FOR CONVENIENCE ONLY AND DOES NOT LIMIT THE APPLICATION OF SUCH DETAIL OR DRAWING. ANY INFORMATION ON THESE DRAWINGS APPEARING TO BE UNCLEAR OR AMBIGUOUS SHALL BE REFERRED TO THE ARCHITECT FOR INTERPRETATION AND CLARIFICATION. 70. THE CONTRACTOR SHALL PROVIDE SITE AND BUILDING ACCESS TO THE ARCHITECT, CITY FIELD INSPECTORS, AND ANY OTHER PERSON REQUIRED OR ENTRUSTED WITH INSPECTIONS OF THE PROJECT. 71. COORDINATE WORK OF TRADES AND SCHEDULE ELEMENTS OF ALTERATIONS, DEMOLITION AND RENOVATION WORK BY PROCEDURES AND METHODS TO EXPEDITE COMPLETION OF THE WORK. 72. CUT, MOVE, OR REMOVE ITEMS AS NECESSARY TO PROVIDE ACCESS OR TO ALLOW ALTERATIONS AND NEW WORK TO PROCEED. INCLUDE SUCH ITEMS AS: A - REPAIR OR REMOVAL OF HAZARDOUS OR UNSANITARY CONDITIONS B - CLEANING OF SURFACES AND REMOVAL OF SURFACE FINISHES AS NEED TO INSTALL NEW WORK AND FINISHES. 73. ASSIGN THE WORK OF MOVING, REMOVAL, CUTTING & PATCHING TO TRADES QUALIFIED TO PERFORM THE WORK IN A MANNER TO CAUSE THE LEAST DAMAGE TO EACH TYPE OF WORK, AND PROVIDE MEANS OF RETURNING TO APPEARANCE TO NEW WORK. 74. PERFORM CUTTING AND REMOVAL WORK TO REMOVE MINIMUM NECESSARY AND IN A MANNER TO AVOID DAMAGE TO ADJACENT WORK. 75. CUT FINISH SURFACES SUCH AS MASONRY, GYPSUM WALLBOARD, STUCCO, WALLCOVERING, TILE, PLASTER, OR METALS, BY METHODS TO TERMINATE SURFACES ON A STRAIGHT LINE AT A NATURAL POINT OF DIVISION. 76. CONTRACT DOCUMENTS WILL NOT DEFINE PRODUCTS OR STANDARDS OF WORKMANSHIP. 59. "SIM." SHALL MEAN COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS. 60. ALL ITEMS SHOWN AS FURNISHED BY OWNER REQUIRE BUILDER COORDINATION. 61. DO NOT SUPPORT ANY CONSTRUCTION FROM THE OWNER'S STRUCTURE OR PENETRATE ANY FLOOR SLABS WITHOUT APPROVAL FROM THE GC PRIOR TO CONSTRUCTION. DO NOT SUSPEND ANY ITEMS FROM THE BOTTOM CHORD OF ROOF JOIST AND JOIST GIRDERS WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF THE PROJECT. 62. THE CONTRACTOR SHALL MAINTAIN, FOR THE ENTIRE DURATION OF THE WORK, ALL EXITS,S AND ALARMS IN CONFORMANCE WITH ALL APPLICABLE CODES AND ORDINANCES. 63. DURING ALL PHASES OF WORK, DO NOT DISTURB THE DELIVERIES AND FUNCTIONS OF ADJACENT NEIGHBOR. COORDINATE WITH BUILDER. 64. PROVIDE NON-COMBUSTIBLE BLOCKING AND/OR SUPPORT FRAMING TO ASSURE A COMPLETE INSTALLATION OF FINISHES, TRIM, AND MILLWORK AS INDICATED IN THE DOCUMENTS AND REQUIRED BY THE ARCHITECT, PRODUCT MANUFACTURERS, AND AS REQUIRED FOR INSTALLATION. PROVIDE ADEQUATE BLOCKING AS REQUIRED TO SUPPORT BASE AND UPPER WALL CABINETS, LAVATORIES, TOILET FIXTURES, AND ACCESSORIES, ELECTRIC PANELS, ACCESS LADDERS, ETC. 65. THE BUILDER SHALL CONFIRM ALL LOCATIONS FOR BLOCKING FOR ALL FIXTURES AND CASEWORK AS REQUIRED BY THE FIXTURE MANUFACTURER. 66. NOT USED. 67. THE BUILDER IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL UTILITY COMPANIES AND PERFORMING ALL WORK REQUIRED BY THEM. THE CONTRACTOR IS RESPONSIBLE FOR PROPER COMPACTION OF UTILITY TRENCHES, BOTH INTERIOR AND EXTERIOR. THE CONTRACTOR SHALL PAY FOR AND OBTAIN ALL PERMITS AND CERTIFICATES OF OCCUPANCY. 68. UNLESS OTHERWISE INDICATED, EACH SUBCONTRACTOR IS RESPONSIBLE FOR ADEQUATELY BRACING AND SUPPORTING ALL ITEMS FROM THE ROOF STRUCTURE FOR GRAVITY LOADS AND TO RESIST MOVEMENTS AS REQUIRED BY ALL APPLICABLE CODES. (ANY BRACING W/ A SIGNIFICANT VISUAL IMPACT IS SUBJECT TO ARCHITECTURAL REVIEW AND APPROVAL. THIS INCLUDES BUT IS NOT LIMITED TO ALL ITE MS BRACED TO, SUSPENDED FROM, OR SUPPORTED BY ROOF STRUCTURE. 49. THESE DRAWINGS ARE PREPARED FOR PURPOSES OF CONSTRUCTION ONLY. THESE DRAWINGS ARE NOT TO BE USED FOR MAINTENANCE PURPOSES AS ACTUAL CONDITIONS MAY VARY FROM THOSE SHOWN ON DRAWINGS DUE TO CHANGE ORDERS, ALTERATIONS BY OTHERS, FIELD CONDITIONS, ETC. 50. THESE DRAWINGS AND RELATED DOCUMENTS DETAIL THE WORK FOR THIS SPECIFIC BUILDING & SPACE INDICATED BY JOB NAME AND NUMBER AND LOCATION. THE DOCUMENTS REMAIN THE PROPERTY OF THE ARCHITECT AND MAY NOT BE USED FOR ANY OTHER PROJECT OR PURPOSE WITHOUT WRITTEN AUTHORIZATION OF THE ARCHITECT. 51. DO NOT SCALE DRAWINGS. PROMPTLY CONTACT THE ARCHITECT IMMEDIATELY FOR CLARIFICATION OF ANY ERROR, OMISSION, OR DISCREPANCY. 52. ALL WORK SHALL BE NEW. 53. ALL FRAMING LUMBER, PLYWOOD, AND CONCEALED WOOD SHALL BE FIRE-RETARDANT TREATED (FRT). NO FRT IN CEILING PLENUM 54. PROVIDE FRT WOOD BLOCKING 8" FOR ALL HOOKS, TOILET ROOM ACCESSORIES AND ANY OTHER WALL MOUNTED EQUIPMENT. 55. ANY DRILLING, WELDING, OR OTHER ATTACHMENT TO THE STRUCTURAL SYSTEM SHALL BE SUBJECT TO APPROVAL BY THE BUILDER & STRUCTURAL ENGINEER PRIOR TO THE COMMENCEMENT OF SUCH WORK. 56. THE ARCHITECT HAS MADE NO INVESTIGATION TO DETERMINE IF ASBESTOS OR ANY OTHER MATERIALS IS PRESENT IN THE EXISTING WORK. THE ARCHITECT ASSUMES NO RESPONSIBILITY WITH REGARD TO ASBESTOS OR ANY OTHER HAZARDOUS MATERIAL. NO WARRANTY OR REPRESENTATION, EITHER EXPRESSED OR IMPLIED, IS MADE BY THESE PLANS AS TO THE SUITABILITY OF REMOVING ANY HAZARDOUS MATERIALS INCLUDING ASBESTOS. ALL PERSONS USING THESE PLANS MUST PROCEED AT THEIR OWN RISK WITH REGARD TO ALL MATERIALS INCLUDING ASBESTOS. IF ANY MATERIAL SUSPECTED OF BEING HAZARDOUS IS ENCOUNTERED, LEAVE INTACT AND UNDISTURBED AND NOTIFY THE ARCHITECT IMMEDIATELY. 57. "TYPICAL" MEANS THAT THE SITUATION IS REPRESENTATIVE FOR SIMILAR CONDITIONS THROUGHOUT THE PROJECT. UNLESS OTHERWISE NOTED, DETAILS ARE KEYED AND NOTED AS "TYP" ONLY THE FIRST TIME THEY APPEAR. 58. "HOLD" DIMENSIONS INDICATE THAT PREFABRICATED SYSTEMS ARE TO BE INSTALLED THAT REQUIRE A MINIMUM DIMENSION. MAINTAIN THIS DIMENSION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL SUBCONTRACTORS AND VENDORS TO COORDINATE CONSTRUCTION REQUIREMENTS, DELIVERY SCHEDULE, 40. ANY WORK INVOLVING THE CUTTING, PENETRATION THROUGH, NEW ROOF PENETRATIONS, TRENCHING OR MODIFICATION OF STRUCTURAL ELEMENTS OF THE BUILDING SHELL, OR THE INTERRUPTION OF OWNER/BASE UTILITY SYSTEMS, ETC. SHALL BE COORDINATED WITH THE BUILDER PRIOR TO THE COMMENCEMENT OF WORK. IF SO STIPULATED IN THE BUILDERS CONSTRUCTION CRITERIA, PERMISSION SHALL BE SECURED IN WRITING. IF REQUIRED, THE BUILDERS DESIGNATED CONTRACTOR SHALL BE CONTRACTED TO PERFORM THE WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BE FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE BUILDERS CONSTRUCTION CRITERIA, TO SECURE PERMISSION AS REQUIRED BY THE BUILDER AND TO ONLY OPERATE DURING HOURS DESIGNATED. 41. ALL FINISHES MUST MEET FLAME SPREAD RATINGS. IT SHALL BE THE RESPONSIBILITY OF THE BUILDER TO SUBMIT FLAME SPREAD RATING INFORMATION TO THE LOCAL BUILDING OFFICIAL IF SO REQUESTED. 42. THE BUILDER SHALL PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 3A 40BC WITH A SEVENTY-FIVE FOOT TRAVEL DISTANCE TO ALL PORTIONS OF THE BUILDING OR AS DIRECTED BY THE FIRE DEPARTMENT FIELD INSPECTOR. 43. THE BUILDER SHALL BE RESPONSIBLE FOR CHECKING IN AND VERIFYING ALL SHIPMENTS OF OWNER-SUPPLIED MATERIALS. THIS INCLUDES VERIFYING PACKING LISTS AGAINST ORDER FORMS AND BILLS OF LADING. THE CONTRACTOR WILL BEAR THE COST OF EXPEDITED FREIGHT CHARGES IF MISSING ITEMS ARE NOT IDENTIFIED AT THE TIME OF PACKAGE RECEIPT. THE CONTRACTOR IS RESPONSIBLE FOR FILING DAMAGE REPORTS FOR GOODS RECEIVED DAMAGED. THE CONTRACTOR SHALL MAINTAIN AN ENVELOPE CLEARLY MARKED "PACKING SLIPS" FOR ALL LADING, PACKING SLIPS, USER MANUALS, WARRANTY INFORMATION, AND PAPERWORK. UPON COMPLETION OF THE PROJECT, THIS ENVELOPE SHALL BE GIVEN TO THE OWNER. 44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANUP OF THE PROJECT SITE AS WELL AS THE FINAL CLEANUP JUST PRIOR TO TURNOVER. ALL TOOLS, MACHINERY, EQUIPMENT, AND MATERIALS SHALL BE REMOVED AND THE PREMISES SHALL BE LEFT IN A NEAT AND ORDERLY MANNER. 45. DO NOT SCALE THE DRAWINGS CONSULT THE ARCHITECT OF ANY DISCREPANCY. 46. THE ARCHITECT HAS ENDEAVORED TO SPECIFY AND/OR INDICATE MATERIALS THAT DO NOT CONTAIN HAZARDOUS MATERIALS OR ITEMS IN VIOLATION OF APPLICABLE CODES AND LAWS OR REASONABLE BUILDING PRACTICES. ALL CONTRACTORS, SUBCONTRACTORS, AND VENDORS SHALL LIKEWISE ENDEAVOR TO PROVIDE MATERIALS THAT DO NOT CONTAIN HAZARDOUS COMPONENTS. NOTIFY THE ARCHITECT OF ANY MATERIALS SPECIFIED OR INDICATED FOR USE ON THE PROJECT SITE THAT CONTAIN HAZARDOUS MATERIALS AND/OR ASBESTOS. 47. WORK TO BE PERFORMED UNDER THIS CONTRACT IS DEFINED BY ALL INFORMATION INCLUDED IN THIS SET OF DOCUMENTS. CONTRACTOR SHALL BE FAMILIAR AND FOLLOW ALL CONSTRUCTION DRAWINGS. 48. ALL LABOR, MATERIALS, FINISHED EQUIPMENT AND THE FINAL FINISHED PRODUCT AS INDICATED BY THE PLANS, SPECIFICATIONS, AND OTHER CONTRACT DOCUMENTS SHALL BE SUPPLIED BY THE CONTRACTOR AS PER GOVERNING STATE AND LOCAL CODES AND ANY AND ALL OTHER REGULATIONS AND CODES HAVING LOCAL JURISDICTION, AND ALL WORK AS REQUIRED BY INSPECTION AGENCIES HAVING JURISDICTION. 1. CONTRACTOR TO VERIFY ALL DIMENSIONS, STUB-UPS, AND OTHER INFORMATION CONTAINED HEREIN BEFORE BEGINNING ANY WORK. CONTACT ARCHITECT IF ANY DISCREPANCIES OCCUR. 2. IF ANY SUBSTITUTIONS ARE PROPOSED AND APPROVED FOR SPECIFIC EQUIPMENT, THE BUILDER WILL BE RESPONSIBLE FOR ALL COORDINATION INCLUDING HVAC, PLUMBING, AND ELECTRICAL. 3. WORK SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES IN THE BUILDING AND ZONING CODE FOR LOCAL AND THE FLORIDA BUILDING CODE. 4. CONTRACTOR SHALL INCLUDE ALL PERMITS, LABOR, MATERIALS, & EQUIPMENT TO PROVIDE FIRST CLASS AND COMPLETE INSTALLATIONS. ALL MATERIALS AND EQUIPMENT SHALL BE NEW. 5. CONTRACTOR SHALL COORDINATE ROUGH-IN REQUIREMENTS AND FINAL CONNECTIONS TO EQUIPMENT. INSTALLATION SHALL MEET ALL CODES AND BE IN ACCORDANCE WITH EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. VERIFY AND PROVIDE AS REQUIRED, ALL DISCONNECTING MEANS, OVERLOAD PROTECTION, GROUNDING, ETC. TO ASSURE PROPER INSTALLATION. 6. HAULING DEBRIS, JACK-HAMMERING OR WORK PRODUCING LOUD VIBRATING NOISES, IS TO BE DONE ONLY DURING HOURS COORDINATED WITH GENERAL CONTRACTOR. 7. ACCEPTANCE OF WORK SHALL BE SUBJECT TO GC, APPROVAL OF WORK IN PLACE AS WELL AS SHOP DRAWINGS AND SAMPLES OF MATERIALS AND EQUIPMENT. ALL SUBMITTALS SHALL BE CHECKED & DIMENSIONS VERIFIED BY CONTRACTOR BEFORE SUBMITTAL TO ARCHITECT. 8. HAZARDOUS MATERIALS: IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. IF MATERIALS, SUSPECTED OF CONTAINING HAZARDOUS MATERIALS, ARE ENCOUNTERED, DO NOT DISTURB AND IMMEDIATELY NOTIFY GENERAL CONTRACTOR. 9. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND EXTENT OF CONFLICT AND PROMPTLY SUBMIT TO THE ARCHITECT IN WRITING. 10. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT AND DEBRIS-REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROAD, STREETS, WALKS, WALKWAYS AND OTHER ADJACENT OCCUPIED FACILITIES. CONTRACT TO COMPLY WITH ALL CODES AND OBTAINED PERMITS REQUIRED FOR TEMPORARY BARRIERS, ETC. A: ERECT TEMPORARY PROTECTION, SUCH AS WALKS, FENCES, RAILINGS, CANOPIES AND COVERED PASSAGEWAYS, WHERE REQUIRED. B: PROTECT EXISTING SITE IMPROVEMENTS AND LANDSCAPING THAT ARE TO REMAIN. 77. PRESENCE OF A PRODUCT, FINISH, OR TYPE OF CONSTRUCTION, REQUIRES THAT PATCHING, EXTENDING OR MATCHING BE PERFORMED AS NECESSARY TO MAKE WORK COMPLETE AND CONSISTENT TO IDENTICAL STANDARDS OF QUALITY. 78. WHERE NEW WORK ABUTS OR FINISHES FLUSH WITH EXISTING WORK, MAKE A SMOOTH AND FLAWLESS TRANSITION. PATCHED WORK SHALL MATCH EXISTING AND ADJACENT WORK IN TEXTURE AND APPEARANCE SO THAT THE PATCH OR TRANSITION IS INVISIBLE AT A DISTANCE OF 5 (FIVE) FEET. 79. WHEN FINISHED SURFACES ARE CUT IN SUCH A WAY THAT A SMOOTH TRANSITION WITH NEW WORK IS NOT POSSIBLE, TERMINATE EXISTING SURFACE IN A NEAT MANNER ALONG A STRAIGHT LINE AT A NEUTRAL LINE OF DIVISION AND PROVIDE TRIM APPROPRIATE TO FINISHED SURFACE. 80. GYPSUM WALLBOARD: PAINT LEVEL FINISH 4 27. EXTERIOR CAULKING SHALL BE VINLOX SEALANT (GUN-GRADE) OR AN APPROVED EQUAL. 28. PROVIDE A MINIMUM OF 1/2" CEMENTITIOUS BACKER BOARD AT PARTITIONS SLATED TO RECEIVE CERAMIC TILE / STONE AND ALL WET AREAS. 29. FLOORS AND WALLS: PROVIDE AN EVEN SURFACE OF UNIFORM FINISH COLOR, TEXTURE AND APPEARANCE. 30. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SCOPE OF WORK AS DEFINED IN THE CONTRACT DOCUMENTS, INCLUDING, BUT NOT LIMITED TO THESE CONSTRUCTION DOCUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROPERLY NOTIFY THE ARCHITECT AND CONSTRUCTION MANAGER OF ANY CONFLICTS, ERRORS OR OMISSIONS IN THESE DRAWINGS. 31. THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION BETWEEN SUBCONTRACTOR, VENDORS, ETC. AS NECESSARY TO COMPLETE THE WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS. IN THE CASE OF INCONSISTENCIES OR DISCREPANCIES BETWEEN THE DRAWINGS, THE MOST STRINGENT NOTE OR CONDITION SHALL APPLY. 32. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING SITE CONDITIONS PRIOR TO THE START OF. ANY CONSTRUCTION WORK THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE BUILDER OF ANY UNCOVERED CONDITIONS EFFECTING THE CONSTRUCTION, FIXTURING, ETC. 33. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COSTS INCURRED IF HE/SHE DOES NOT NOTIFY THE CONSTRUCTION MANAGER OR ARCHITECT IN A TIMELY MANNER. 34. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO MAINTAIN COMPLIANCE WITH INSURANCE REQUIREMENTS OF THE OWNER AS STIPULATED IN THE CONTRACT DOCUMENTS. 35. THE CONTRACTOR SHALL MAINTAIN A CONSTRUCTION SET ON-SITE AT ALL TIMES. AT THE COMPLETION OF THE PROJECT THE CONTRACTOR SHALL PROVIDE THE AS-BUILT SET TO THE BUILDER. 36. SUBSTITUTIONS WILL NOT BE ALLOWED UNLESS REQUESTED IN WRITING TO THE CONSTRUCTION MANAGER. APPROVAL MUST BE IN WRITING. 37. ALL WORK COMPLETED UNDER THIS CONTRACT SHALL COMPLY WITH THE PROVISIONS OF THE CONSTRUCTION DOCUMENTS, THE CONSTRUCTION CRITERIA OF THE OWNER, AND SHALL SATISFY ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS HAVING JURISDICTION. ANY MODIFICATIONS TO THE WORK REQUIRED BY SUCH AUTHORITIES SHALL BE PERFORMED BY THE CONTRACTORS FOLLOWING WRITTEN NOTIFICATION TO THE ARCHITECT. CHANGES IN THE SCOPE OF WORK REQUIRED BY SUCH AUTHORITIES SHALL ONLY BE CONSIDERED FOR CHANGE ORDERS IF SUBMITTED IN WRITING PRIOR TO ANY PERFORMANCE OF THE WORK. 38. OSHA REQUIREMENTS SHALL BE INCORPORATED INTO THE SCOPE OF WORK EVEN THOUGH THEY ARE NOT LISTED SEPARATELY. 39. THESE NOTES SHALL APPLY TO ALL DRAWINGS AND GOVERN UNLESS OTHERWISE NOTED. THE GENERAL CONTRACTOR SHALL ALSO REFERENCE THE NOTES ON EACH DRAWING SHEET INCLUDING MECHANICAL, ELECTRICAL, PLUMBING, INTERIOR DESIGN, ETC. AND INCORPORATE SUCH INTO THE SCOPE OF THE WORK. 11. TEMPORARY FACILITIES: PROVIDE TEMPORARY BARRICADES AND PROTECTION REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO FACILITIES THAT ARE TO REMAIN. A: PROVIDE PROTECTION TO ENSURE SAFE PASSAGE OF PEOPLE AROUND DEMOLITION ARE . 12. TEMPORARY PARTITIONS: ERECT AND MAINTAIN DUST PROOF PARTITIONS AND TEMPORARY ENCLOSURES TO LIMIT DUST AND DIRT MIGRATION AND TO SEPARATE AREAS FROM FUMES AND NOISE. 13. ALL EXISTING REQUIRED MEANS OF EGRESS SHALL BE KEPT CLEAR & CLEAR OF DEBRIS OBSTRUCTIONS. 14. ALL NEW INTERIOR & EXTERIOR SURFACES, FINISHES, EQUIPMENT, AND FLOORS WILL BE APPROVED BY ARCHITECT / OWNER / OWNER'S REP. 15. ALL LIFE SAFETY, ENERGY MANAGEMENT, AND COMMUNICATIONS DEVICES & SYSTEMS ARE TO BE SUPPLIED BY THE CONTRACTOR. ALL SYSTEMS MUST MEET APPLICABLE GOVERNING CODES. 16. CONTRACTOR SHALL SUBMIT MARKED-UP CLEAN PRINTS OF AS-BUILT CONDITIONS SHOWING CONCEALED DEVIATIONS FROM DESIGN. ON-SITE JOB COPY SHALL BE KEPT CURRENT W/ REVISIONS AS THEY TAKE PLACE. 17. CONTRACTOR SHALL KEEP PREMISES OF WORK AREA CLEAN DAILY, BROOM CLEAN AT PROJECT COMPLETION, AND SHALL REMOVE ALL REFUSE FROM SITE AND DISPOSE OF ACCORDING TO LAW. 18. CONTRACTOR SHALL WARRANTY ALL NEW WORK FOR A PERIOD OF TWO YEARS (MINIMUM) FROM DATE OF ACCEPTANCE AND SHALL REPAIR OR REPLACE ANY DEFECTIVE WORK INCLUDING MATERIALS, LABOR, AND EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. 19. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE TO FACE OF STUD ON CENTER. 20. PROVIDE ADEQUATE CONCEALED BLOCKING AND ANCHORING FOR CEILING AND WALL MOUNTED EQUIPMENT AND ACCESSORIES (i.e. TOWEL BARS, SOFFITS, FANS, HANDRAILS, 21. CONTRACTOR SHALL PREPARE ALL WORK AS PER THESE SHEETS AND SHALL ALSO EXAMINE ALL SITE CONDITIONS AND VERIFY ALL DIMENSIONS. IN THE EVENT THAT FURTHER CLARIFICATIONS OR INTERPRETATIONS NEEDED, CONTRACTOR 22. CONTRACTOR SHALL VERIFY AND SET IN ALL CAST-IN INSERTS, ANCHORS, BOLTS, PLATES, ETC. AS MAY BE REQUIRED FOR ATTACHMENT OF THE VARIOUS BUILDING COMPONENTS PRIOR TO PLACE OF CONCRETE. 23. CONTRACTOR SHALL VERIFY ALL FIXTURE LOCATIONS AND CLEARANCES. 24. CONTRACTOR SHALL VERIFY AND COORDINATE ALL ROUGH OPENINGS FOR SCHEDULED DOORS, WINDOWS, AND DOOR HARDWARE 25. ALL ROUGH-IN NAILS, BOLTS, AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED. 26. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE-TREATED. CHANDELIERS, ETC.) IN BATHROOMS PROVIDE 8" BLOCKING AROUND WALLS AT TOILETS, SHOWERS FOR FUTURE HANDICAPED HANRAILS. SEE FLOOR PLANS. CALL THE ARCHITECT AS NECESSARY TO COMPLETE THE JOB. 81. CORNER BEAD SHALL BE METAL, TO BE PROVIDED AT ALL CORNERS. ALL EXTERIOR TRIM SHALL BE OF PVC MATERIAL CONFORMING TO ASTM STANDARDS D1784, D1063 & D4216-99. PVC PRODUCTS SHALL BE USED FOR ALL EXTERIOR EXPOSURES. CAULK ALL BUTT JOINTS, INTERSECTIONS & ENDS. NARROW FLANGE CASING BEAD MUST BE USED AROUND OPENING OR WHERE STUCCO TERMINATES AT A DISSIMILAR SURFACE. NARROW FLANGE CASING BEAD SHALL BE METAL. ALL EXTERIOR ACCESSORIES SHALL BE OF PVC MATERIALS CONFORMING TO ASTM STANDARDS D1784, C1063 & D4216-99. CAULK ALL BUTT JOINTS, INTERSECTIONS & ENDS. 82. "V" CONTROL JOINT, CONTROL JOINTS SHALL BE PLASTIC COMPONENTS, INC. #2058. ALL EXTERIOR ACCESSORIES SHALL BE OF PVC MATERIAL CONFORMING TO ASTM STANDARDS D1784, C1063 & D4216-99. SHOULD BE USED IN ANY APPLICATION WHERE A SURFACE AREA IS MORE THAN 144 SQUARE FEET. CAULK ALL BUTT JOINTS, INTERSECTIONS & ENDS. REFER TO DETAIL 7/A600. GENERAL NOTES SHEET NUMBER REVISIONS This drawing is property of GMK, PALM BEACH, FLORIDA. Any use of this drawing or the design information hereon without written authorization of GMK is strictly prohibited. c 2021 GMK PALM BEACH, FLORIDA GMK PLANNING - ZONING - DESIGN G M KAGAN FAIA 205 WORTH AVENUE 201-111 PALM BEACH FL 33480 CELL: 203 988 1838 GMK@GMKPZD.COM SOSNOWSKI RESIDENCE Project Location: 3902 DUNESIDE DRIVE FT PIERCE, FL 34949 CONSULTANTS Project #: 2002 Architect: GERALD M. KAGAN DATE : 08-25-2021 SHEET NAME: SCALE: AS NOTED PERMIT SET INTERNATIONAL CONSULTING ENGINEERS & DESIGN, LLC 4310 WEST BROWARD BLVD. PLANTATION, FL 33317 T 561.707.6795 F 954.797.2847 CONTACT: JOE SPASOVSKI, P.E. UNISONSTRUCTURALDESIGN 7522 WILES RD, SUITE B204 CORAL SPRINGS, FL 33067 PHONE: (954) 323-3746 MOBIL: (305) 298-0467 EMAIL: UNISONSTRUCTURALDESIGN@GMAIL.COM WEB: UNISONSTRUCTURALDESIGN.COM DATE : 10-06-2021 GENERAL NOTES A0.0 2 10/05/21 BDC COMMENTS 2 3 10/21/21 BDC COMMENTS 3