Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 94 Code 148 120121.pdf
OUNIVERSAL ENGINEERING SCIENCES cw�( INSPECTION RESULTS Inspection Date: 2 1 k Z4 Permit No Project: M� Address: 3=i / 2 ti4 c�r)E 5 ti'-z Check one: 4 Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBINGMMECHANICAL Footing Underground UndergrounDuct Rough -In Slab Floor Rough -In Rough-InSteam Piping & Test Masonry Wall Rough -In Stack PipingHW Piping &Test Wall/Ceiling Ceiling Rough -in Water PipinCHW Piping &Test Framing Panel/Feeder Gas Piping&Cond.Piping &TeStructural Service/Ground Storm PipinInsulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type:) L U (0 t2 447- 0 �A Area Inspected/Code: Inspection Results"d AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 6. 7. Inspector's Name " OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com