Loading...
HomeMy WebLinkAbout8 Concrete Placement - North Building (11-18-21)607 NW Commodity Cove, Port St. Lucie, Florida 34986 g U N I V E R S A L Phone: ENGINEERING SCIENCES GFA PROJECT# 3310.2100348.0000 PROJECT Cristelle Cal Condos 4804 N. At LOCATION Fort Pierce, FL 34949 PERMIT NO. North Building - 1908-0214 OWNER Cardinal Ocean Development, LLC CONTRACTOR Cardinal Ocean Development, LLC ARCHITECT Frank C Snedaker ENGINEER Stirling & Wilbur Engineering WEATHER TEMPERATURE WIND HUMIDITY CONCRETE PLACEMENT INSPECTION REPORT DATE Thursday, November 18, 2021 S M T W TH F S DAY x BRIGHT SUN CLEAR OVERCAST RAIN x x BELOW 60 60-75 75-90 ABOVE 90 x LOW MODERATE HIGH Report x LOW MODERATE HIGH 8 x INSPECTED: Concrete Placement Monitoring North Building (9 Units). Pouring 16 columns C1 and C2. See sketch on back for approximate location. THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED CONTRACT DOCUMENTS AND ACCEPTED PRACTICES. COMPLIES YES NO N/A x 1 SPARE VIBRATOR ON HAND x 2 FORMS WETTED/OILED It 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW) x 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW) x 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAY'S POUR x 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME x 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET It 8 SUFFICIENT VIBRATION PERFORMED x 9 STEEL REMAINED IN PLACE DURING POUR x 10 PfT CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS Disposition of Inspection x Secton / Area Observed Re -Inspection Work In Progress BRe-Inspection Required COMMENTS/ACTION REQUIRED: Inspection Performed By: Pedro,li l's Inspection Certified By: _ Padl Danforth P.E. Registered Professional No: P.E. 44653 . Certified Special Inspector No: SI 1103 T= t FBPE Certificate No: 4930 Environmental a Geotechnicel • consaaction Matenals Testing • Special S Threshold Inspections • Plan Review 8 Code Compliancy; • a• Florida's Leading Engineering Source www.leamgfa.eont