HomeMy WebLinkAbout8 Concrete Placement - North Building (11-18-21)607 NW Commodity Cove, Port St. Lucie, Florida 34986 g U N I V E R S A L Phone:
ENGINEERING SCIENCES
GFA PROJECT#
3310.2100348.0000
PROJECT
Cristelle Cal Condos
4804 N. At
LOCATION
Fort Pierce, FL 34949
PERMIT NO.
North Building - 1908-0214
OWNER
Cardinal Ocean Development, LLC
CONTRACTOR
Cardinal Ocean Development, LLC
ARCHITECT
Frank C Snedaker
ENGINEER
Stirling & Wilbur Engineering
WEATHER
TEMPERATURE
WIND
HUMIDITY
CONCRETE PLACEMENT
INSPECTION REPORT
DATE Thursday, November 18, 2021
S M T W TH F S
DAY x
BRIGHT SUN
CLEAR
OVERCAST
RAIN
x
x
BELOW 60
60-75
75-90
ABOVE 90
x
LOW
MODERATE
HIGH
Report
x
LOW
MODERATE
HIGH
8
x
INSPECTED: Concrete Placement Monitoring North Building (9 Units). Pouring 16 columns C1 and C2. See
sketch on back for approximate location.
THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED
CONTRACT DOCUMENTS AND ACCEPTED PRACTICES.
COMPLIES
YES NO N/A
x
1 SPARE VIBRATOR ON HAND
x
2 FORMS WETTED/OILED
It
3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW)
x
4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW)
x
5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAY'S POUR
x
6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME
x
7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET
It
8 SUFFICIENT VIBRATION PERFORMED
x
9 STEEL REMAINED IN PLACE DURING POUR
x
10 PfT CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS
Disposition of Inspection
x Secton / Area Observed Re -Inspection
Work In Progress BRe-Inspection Required
COMMENTS/ACTION REQUIRED:
Inspection Performed By: Pedro,li l's
Inspection Certified By: _
Padl Danforth P.E.
Registered Professional No: P.E. 44653 .
Certified Special Inspector No: SI 1103
T= t
FBPE Certificate No: 4930
Environmental a Geotechnicel • consaaction Matenals Testing • Special S Threshold Inspections • Plan Review 8 Code Compliancy; • a•
Florida's Leading Engineering Source
www.leamgfa.eont