Loading...
HomeMy WebLinkAboutEngineering ,G0113390 Ft Pierce Tower Close Out LetterDecember 6, 2021 Ms. Jennifer Brown B+T Group Parallel Infrastructure 1717 S. Boulder, Suite 300 2320 Cascade Pointe Blvd., Suite 300 Tulsa, OK 74119 Charlotte, NC 28208 (918) 587-4630 btwo@btgrp.com Subject: Tower Construction Completion Letter Permit Number: SLC 2004-0619 Site Name: Ft Pierce Engineering Firm Designation: B+T Group B+T Project Number: G0113390 Site Data: Monopole Cell Tower & Compound Georgio Rd & Enterprise Rd Ft. Pierce, FL 34982 Latitude 27° 24' 16.17" N, Longitude 80° 20' 21.59" W Dear Ms. Brown, B+T Group is pleased to submit this “Tower Construction Completion Letter” regarding the above-mentioned monopole tower site. We reviewed the as-built survey dated 1/25/2021, as well as photographs of the new tower taken at various stages of construction. Based on review of the as-built survey, site photos, and close-out documentation, the construction of the tower appears to be in compliance with the permitted plans and was properly installed. We at B+T Group appreciate the opportunity of providing our continuing professional services to you and Parallel Infrastructure. If you have any questions or need further assistance on this or any other projects, please give us a call. Construction Control Inspection Letter prepared by: Mike Speedie Respectfully submitted by: B+T Engineering, Inc. Chad Tuttle, P.E. CEO B+T GRP 12 /6 /21