Loading...
HomeMy WebLinkAboutROOFING PERMIT INFORMATION SHEETST. LUCIE WORKS ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Low Slope Application Prescriptive BUR-RAS 150 Asphaltic Shingles Concrete or Clay Tile Metal Roofs Wood Shingles and Shakes 1 Other Required Sections of the Permit Application Form A, B, C A, B, C A,B,D A, B, D, E A, B, D A, B, ❑ As Applicable Attachments Required See List Below 1,2,3,4,5,6.7 2,4,5,6,7 1,2,4,5,8,7 1,2,3,45.6.7 V,3,4,50,,7' 1,2,4,5,6,7 1,2,30,5,6,7 ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Form RooflnfoFeb21 Rev Feb 18, 2021 ST. LUCIE'4I/QRKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: Product Approval No.: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': _ Zone 1: _ Zone 2: _Zone 3: _ Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness: Slope: Anchor/Base Sheet & No, df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':_" oc @ Lap, # Rows_ @ _" co Zone 16 oc @ Lap, If Rows— @ _ ec Zone 2:_"oc@ Lap, # Rows _@—"ao Zone 3:_" oc @ Lap, # Rows_ @ _° m Number of Fasteners Per Insulation Board: Zone 1':_Zone 1:_Zone 2_Zone 3 Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, CounterBashing, Coping, Eta Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. ST. LUCIE WORKS - ~ Section D (Steep Slope Roof System) Roof system Manufacturer: JA TAYLOR ROOFING 5V CRIMP & JA TAYLOR EDGE-LOC 1" STANDING SEAM Notice of Acceptance Number: FL#17443.1 & NOW B-1023.17 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1: -54 Zone 2e: -74 Zone 2n:_Zone 2c--7-4 —zone 3er74Zone 3c \1'peOD' Roof Slope:rrt PEEL&STICK-OWENS CORNING POLVGLASS Mrs FL#5258.1 5 12 rier: Ridge Ventilation?tener Type&Spacing; 6"FIELD l4"PERIMETER. eD RMG SHANK NAILS Adheshs Type: Type Cap Sheet:Roof Covering; METAL Type & Sim Drip Fdm- ST. LUCIE'AJORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for M, with the values from Mr. If the Mr values are greater than or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable. Method 1'Momem Based Tile Calculations Per RAS 12T (Zone _Xi__= _)—�_=Mn_ Product Approval M, (Zone 2ea : _xb_- _ I— Mg! _=Mry_ Product Approval Mr. (Zone 2n: '_xl_= ___)_ Mg: _=M._ Product Approval Mr (Zone 2r: _xl_= _�_Mg: _=Mm- Product Approval Mr (Zone 3e: '_X)L_= _j_Mg;_=M._ Product Approval Mr (Zone 3r: _%J._= _)— Mg: _=MQ_ Product Approval M, Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance lM.IFmm Tahle M, required Moment Resistance - Mean Roof HeightRoof Slope is, 20' 2S' 40' 2:12 34.4 36.5 38.2 42.2 3:12 32.2 34.4 36.0 39.8 4:12 30.4 32.2 33.8 :35.1 37.35:12 28.4 30.1 31.6 34.9:12 26.4 28.0 29.4 32.4 7:12 -Mustheused 24.4 25.9 27.1 28.2 30.0 __..,_.._.._........,...,. ,,I uiv1oeua umeu uie sysrems For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, If the F'values are greater than or equal to the F, values, for each area of the roof, then the the attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: _x L=x W:=_J -W; cos r=F,v_ Product Approval F' (Zone 2e: xL_xW:=)-W:_Cos r=F,2= ProductApproval F' (Zone 2n: _zL=xW:=_J-W; cos r_ F,zn Product Approval F' (Zone 2r. _x L= x W:=_W;_Cos r= Fa,_ Product Approval F' (Zone 3e:_x L=xW;=-W: cos r_F:ae Product Approval F' (Zone 3r._xL_=x W:=_____j_W;_ cos r_F:s,_ Product Approval F' Where to Obtain Information Description Symbol I WheretofiM Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on MCC 7 Mean Roof Height H Job Site Roof Slope B Job Site Aerodynamic Multiplier Product Approval Restoring Moment due to Gravity Ms Product Approval Attachment Resistance Mr Product Approval Required Moment Resistance Ms Calculated Minimum Attachment Resistance F' Product Approval Required UPllft Resistance F, Calculated Average Tile Weight W Pr uct Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.