Loading...
HomeMy WebLinkAboutAirport Industrial Code 280 120721.pdfg]UNIVERSALI ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 11N aO aI f `Permit No. �a`� -a r Project: NrW3^r IrJQS�cio•1 i(O( roA yitr-L i( —U(11� V Address: B'2-15D SQ:%n-1- 161Vd. �7A Q,r2.fCQ.tit 3�5� Check one: L Regular Inspection: /❑\ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL I I PLUMBING MECHANICAL Footing Underground N' _ Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical JXJ Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: _2 Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed 7DP-Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: DoI) &I?✓ e AJ Lic.#: BN7301 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamafa.com