HomeMy WebLinkAboutPILE MONITORING133 MATERIAL TESTING ENGINEERING 3111 E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 November 2, 2021 Project No. 21-0555 Bodax Foundations, Inc. 1101 NW 55th Street Ft Lauderdale, FL 33309 Re. Auger Cast Pile monitoring for Private Residence located at: 8208 S.Ocean Drive Jensen Beach , 34957 Dear Sir, Pursuant to your request, BIII MATERIAL TESTING ENGINEERING, LLC. conducted Auger Cast Pile monitoring for the above -referenced location on October 27th-29th 2021. The work involved the installation of Sixty -Nine (69) 14" diameter cast in place pile, 60 piles for house, 9 piles for the pool. The approximately grout volume used was 2416.05 c.f. (89.4833 yards), and the load capacity of 30 tons as per Allterra Engineering report. attached monitoring logs as well as the sketch showing the location of piles are enclosed along with this letter. We appreciate the opportunity to have been of service to your company. Please feel free to contact us if there is any question or comments pertaining to this letter. HER Ile Respectfully submitted, = * : No. 67796 �0••• STATE OF •Va r i o A Digitally signed by ;<\ • �c p:.• Dario A Herrero Dario A. Herrero, P.E. %FS •'4oRIo' (:� �� Date:2021.12.03 Florida Reg. #67796 /'i /O A ; ; � Herrero 12:48:45-05'00' BIII Material Testing Engineering, LLC. Page 114 III B3 MATERIAL TESTING ENGINEERING E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 27-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 12:00 PM TIME JOB FINISHED 5:40 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 1 2 3 4 5 6 7 8 9 10 2 Pile No. 6 7 31 32 34 35 36 38 22 23 3 Augured 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23,5 23.5 23.5 23.5 6 Number of pump strokes 31 31 32 31 33 35 31 31 31 31 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 32.6 32.6 33.6 32.6 34.7 36.8 32.6 32.6 32.6 32.6 9 Volume Ratio (ct), (815) 1.3 1.2 1.2 1.2 1.2 1.6 1.6 1.4 1.4 1.4 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 439 439 439 439 439 439 439 631 631 631 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Field Rep.: D.0 Dario A Digitally signed by ��0 N.RH�i� Dario A Herrero \NNE \,� /,� Date: 2121.12.03 % Q� �� 1 F 1 C •. F Herrero 12:49:04-05'00' c,Q,• ��•?'p Dario A. Herrero _ yt No. 67796 �•: y� Fla. Reg. #67796 ;-o As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for public5i Staten s, �:/ conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior �f t$} Pr40RQP' •�\� lk Material Testing Engineering, LLC /ONA�- ��\\ Dui B3 MATERIAL TESTING ENGINEERING E s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 27-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 12:00 PM TIME JOB FINISHED 5:40 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 11 12 13 14 15 16 17 18 1 19 20 2 Pile No. 25 29 24 30 5 4 3 2 19 18 3 Augured 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 35 31 33 32 31 31 35 35 36 31 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 36.8 32.6 34.7 33.6 32.6 32.6 36.8 36.8 37.8 32.6 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 1.4 1.6 1.6 1.6 1.4 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 631 631 631 631 662 662 662 662 662 662 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Digitally signed by ��\ Dario A Dario A Herrero �p P HER, Date:2021.12.03 \ Q�.•'�IFIC • F Herrero 12.49.14-05'00' Q`•�� ��•� Field Rep.: D.0 Dario A. Herrero : * o. 67796 Fla. Reg. #67796 =-a %-)3- • E v: As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publicaii� o ,ate nts, : �� conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior w�/f e�9pFQ . • •�� \\\ Material Testing Engineering, ILC, ///v �/O j i B3 MATERIAL TESTING ENGINEERING E s s c- n c e o f P e r If e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 27-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 12:00 PM TIME JOB FINISHED 5:40 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 21 22 23 24 25 26 27 2 Pile No, 25 29 24 30 5 4 3 3 Augured 0 (inches) 1 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 32 37 35 37 38 38 35 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 .Actual Grout Volume (cf), (6*7) 33.6 38.9 36.8 38.9 39.9 39.9 36.8 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 1.7 1.6 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 12 Grout Truck Number 662 631 1 631 631 631 631 631 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Field Rep.: D.0 Dario A Digitally signed by \�\\\� Dario A Herrero � �0 P HER Date: 2021.12.03,E Q� �•'� i F 1 •. F Herrero 12:49:26-05'00',%, Q�•l�,�` C�] •?'� Dario A. Herrero _ * : • o. 67796 �•: * Fla. Reg. #67796 --a : * : CC- F . 4U 1%' As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publical to nts, P : conclusions or extracts from our reports is reserved, In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior wr�t��pQre•'`�� Material Testing Engineering, LLC. /���k '' ..L ���\\ B3 MATERIAL TESTING ENGINEERING F s s e n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615,5801 REPORT OF AUGERED CAST IN PLACE PILES 133 PROJECT NO. 21-0555 DATE 28-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 11:00 AM TIME JOB FINISHED 5:00 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 28 29 30 31 32 33 34 35 36 37 2 Pile No. 16 60 57 17 56 27 59 8 14 11 3 Augured O (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 31 31 31 32 33 35 35 31 32 33 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 32.6 32.6 32.6 33.6 X. 36.8 36.8 32.6 33.6 34.7 9 Volume Ratio (co, (815) 1.3 1.2 1.2 1.2 1.2 1.6 1.6 1.4 1.4 1.5 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 655 655 655 655 655 1 655 655 693 r693 693 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" ox, Full Respectfully Submitted; Field Rep.: D.0 Dario A Digitally signed by \��111111/ Dario A Herrero \�\� 0 P. HER Date: 2021.12.0k\ 0\- •' I F I C �F Herrero 12:49:37-05'0�40� �i� ��•�� Dario A. Herrero _ * : No. 67796 �•: y� Fla. Reg. #67796 =-v : _ F As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for public-- to nts, P : �� conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior v.Rjx�4„!rd,ZA�•��j� \\\ Material Testing Engineering, L-C, -1v1b'/ONAL �� ��//llllll�N\\\ B3 MATERIAL TESTING ENGINEERING E3 III E s s c n c e o f P e r f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 28-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 11:00 AM TIME JOB FINISHED 5:00 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 38 39 40 41 42 43 44 45 1 46 47 2 Pile No, 50 49 45 44 40 42 43 41 39 37 3 Augured 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 32 35 31 35 33 31 32 31 32 31 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 1 Actual Grout Volume (cf), (6*7) 33.6 36.8 32.6 36.8 34.7 32.6 33.6 32.6 33.6 32.6 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 1.4 1.6 1.4 1.4 1.4 10 1 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 693 693 693 693 611 611 611 611 611 611 Pump calibration date. Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Field Rep.; D.0 Dario A Digitally signed b\\�\\\IIIH1/ Dario A Herrero�� �0N. • ERA ., Herrero Date: 2021.12`@-•JtF/C,, 12:49:47-05'0'Q : •• O Dario A. Herrero : * : No. 67796 �•: y� Fla. Reg. #67796 =-p 441� As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for public-3 p S%1t 0, nts, conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior �efyrt ,�i • ro?b�Q• • •�� �� Material Testing Engineering, LLG /�i/ONAL ��\\ B3 MATERIAL TESTING ENGINEERING E3 III E s s e n c e o f P e 1 f e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 28-Oct-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 11:00 AM ITIME JOB FINISHED 5:00 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 48 49 50 51 52 53 54 55 2 Pile No. 48 46 47 51 65 62 66 67 3 Augured 0 (inches) 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 35 31 32 35 33 31 32 31 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 36.8 32.6 33.6 36.8 34.7 32.6 33.6 32.6 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 1.4 1.6 1.4 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 5#7 5#7 5#7 11 12 Reinforcing Length (ft) Grout Truck Number 22 611 22 693 22 693 22 693 22 693 22 693 22 693 22 693 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Digitally signed *%%I Dario A Dario A Herra��� � �p N. H ER ,/ Herrero Date:2021.�.�*.; tFfC9 ��jO� 12:49:56-;-, Dario A. Herrero _ * : No. 67796 Field Rep.: D.0 Fla. Reg. #67796 --v : * : Q�: As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publica45� totem/nts, P ��� conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior 'o�N: Material Testing Engineering, U.C. /�i ��ONAL ��\\ B3 MATERIAL TESTING ENGINEERING E3 III E s s e n c e o f P e r f c,, c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES 133 PROJECT NO. 21-0555 DATE 29-Oct-21 CLIENT Bodax Foundations WEATHER Sunny ADDRESS 1101 NW 55th Street. Fort Lauderdale, FL 33309 TIME JOB STARTED 12:00 PM CONTACT TIME JOB FINISHED 5:50 PM PROJECT Private Residence. ADDRESS 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 Columns No. 56 1 57 58 59 60 61 1 62 63 64 65 2 Pile No. 52 55 58 53 54 61 63 13 12 69 3 Augured 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 22 22 22 22 22 5 Theoretical Pile Volume (cf) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 31 32 31 32 33 32 35 35 32 35 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 32.6 33.6 32.6 33.6 34.7 33.6 36.8 36.8 33.6 36.8 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 1.4 1.6 1.6 1.4 1.6 10 Reinforcing Size 5#7 5#7 5#7 5#7F5#7 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 22 22 22 22 22 12 Grout Truck Number 655 655 655 655 655 655 655 1506 1506 1506 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Respectfully Submitted; Field Rep.: D.0 Digitally signed by Dario A \���111I Dario A Herrero\�\ D.N.,HER Date:2021.12.G1 Herrero � 12:50:08 -05'Q* i Dario A. Herrero : * ; No. 67796 Fla. Reg. #67796 =-a : * :CC_ '7- -)3.. QTAT .4�U` As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publicat� Nte nts, conclusions or extracts from our reports is reserved, In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior vAf�fprL Rl ��. • •r�� \\\ Material Testing Engineering, LLC:. /vv'/ONAL ��\\\ B3 MATERIAL TESTING ENGINEERING E % s e n c e o f P e r If e c t i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0555 DATE 29-Oct-21 CLIENT ADDRESS -CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 WEATHER Sunny TIME JOB STARTED 12:00 PM TIME JOB FINISHED 5:50 PM PROJECT ADDRESS Private Residence. 8208 S. Ocean Drive , Jensen Beach , 34957 AUGERCAST PILES LOG 1 2 Columns No. Pile No_ 66 9 67 68 B/O 64 68 10 69 64 3 Augured 0 (inches) 14 14 14 14 14 4 Pile Length (feet) 22 22 22 22 22 5 Theoretical Pile Volume (co 23.5 23.5 23.5 23.5 23.5 6 Number of pump strokes 35 29 35 29 35 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 36.8 30.5 36.8 30.5 36.8 9 Volume Ratio (cf), (815) 1.3 1.2 1.2 1.2 1.2 10 Reinforcing Size 5#7 5#7 5#7 5#7 5#7 11 Reinforcing Length (ft) 22 22 22 22 22 12 Grout Truck Number 1506 1506 1506 1506 1506 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) Remarks: *Total of piles 69; 60 House Piles & 9 Pool Piles installed w/ 5#7 w/ # 3 ties @ 12" o.c. Full Field Rep.: D.0 Respectfully Submitted; Da Dario A Digitally signed by ��\\� H Dario A Herrero \X N. E Herrero Date: 2021.120**JIFIC?. _ I-Ij • � : = Dario A. Herrero = * : o. 67796 • y� _ Fla. Reg. #67796 --0 �= As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publicatfy eAAmtejnts, P conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior v0JAK ' a, \ I • • •(J'� \ Material Testing Engineering, LLC ///�0/0 j i 1 ; ; \�\