Loading...
HomeMy WebLinkAboutAPPROVED VEG PERMIT - 5371 S 25th St - 2108-0880 NOTICE OF AFTER-THE-FACT VEGETATION REMOVAL PERMIT THE APPLICANT SHALL KEEP THIS PERMIT POSTED ON-SITE AT ALL TIMES DURING LAND CLEARING. Permit#: 20210819 Fee: $200.00 Building Permit#: 2108-0880 Date Issued: 11/30/2021 Property Owner: Finn, Jason & Lisa Contractor: Gulfstream Building Group, Inc. – 772-332-8140 Parcel ID#: 3405-443-0002-000-7 Project Location: 5371 S. 25th Street, Port St. Lucie, FL Property Size: 3.62 acres Project Description: Applicant requests a After the Fact permit for removal of vegetation associated with the construction of a single-family residence (Building Permit #2108-0880). During a site visit on 9/23/2021 staff observed that the proposed construction was already underway. Staff did observe evidence twenty (20) native 12” DBH slash pine trees had been removed; the trees removed require mitigation at a ratio of 4:1. Therefore, an after-the-fact permit is hereby granted. Silt fencing shall be installed and maintained in good condition throughout the duration of the construction to prevent runoff into the wetland onsite. No further native vegetation is permitted to be Field Notes: 1. HABITAT: a. Uplands: Residential b. Wetlands: A wetland has been identified on the property; silt fencing shall be installed to prevent impacts to the wetland. Please note this does not constitute a state or federal jurisdictional determination and all formal wetland delineations must be obtained from appropriate state and/or federal agencies. 2. WILDLIFE: None observed. Gopher tortoise survey conducted by FWC certified agent. 3. SIGNIFICANT ARCHAEOLOGICAL OR HISTORIC FINDINGS: None Identified.. Mitigation: Mitigation shall be met through onsite preservation of 960” DBH of native slash pines. Any mitigated trees removed shall be mitigated at a ratio of 8:1. Conditions of Issuance: The following minimum standards for vegetation protection shall be applied to areas of vegetation designated to be preserved (Land Development Code Section 6.00.05.C). A barrier shall be placed and maintained around the tree’s perimeter to form a continuous boundary as specified below. • Vegetation protection barricades shall be placed at a minimum distance of either ten (10) fe et from the edge of groups of protected vegetation or from the radius of the dripline from all protected trees, whichever is greater; in the event that a full 10-foot buffer cannot be provided, the applicant shall provide the maximum buffer feasible; • Protective barriers or protective designations shall remain in place until completion of site construction and clearing activities. • In the event that any protective barriers are removed or altered and clearing activities are conducted within an area identified for preservation, SLC ERD is authorized to direct that all land clearing and site alteration work at the site be stopped until the barriers are restored and any necessary corrective actions taken to repair or replant any vegetation removed or damaged as a result of these encroachments; • A National Pollutant Discharge Elimination (NPDES) Permit, separate from this permit, may be req uired for construction activities disturbing 1 acre or more. Please visit www.dep.state.fl.us/water/stormwater/npdes or contact Jose Vega, St. Lucie County Stormwater Program Coordinator at 772-462-1668 for more information. • Preservation areas shall be maintained in their natural state, so as not to alter the water and oxygen content of the soil and impair its function. • No grade changes or excavation of any sort may be made within the barricaded areas. • No signs, permits, wires, or other attachments shall be affixed or attached to protected vegetation; and • No equipment, including passenger vehicles, shall be driven, parked, or stored or repaired within designated vegetation preservation areas. Post Clearing Requirements: 1. Landscaping: The landscape requirements of one native tree per 2,500 square feet of property, up to a maximum of 17 trees, must be met. As this property is 3.62 acres (acres X 43,560 = square feet of this property) 157,687 square feet, (square feet/2,500 = trees), 17 tree(s) (measuring 2.5” diameter at breast height (DBH) & 12’ HT), or a total of 42.5” DBH of trees are required. Since this property contains well over this amount of inches of native trees, this requirement can be met by preserving remaining trees onsite. Please note that landscaping requirements are separate from, and in addition to, tree mitigation requirements. PLEASE BE ADVISED THAT ANY NATIVE VEGETATION DESTROYED OR DAMAGED OUTSIDE OF THE LIMITS OF CLEARING DUE TO CONSTRUCTION ACTIVITIES OR FILL PLACEMENT SHALL BE MITIGATED AT A RATIO OF 4:1 (4 INCHES OF REPLANTING FOR EACH INCH DESTROYED OR DAMAGED). PLEASE NOTE: • THIS IS NOT AN AUTHORIZATION TO PLACE FILL ON OR RE-GRADE PROPERTY. • CONTACT A PROFESSIONAL SURVEYOR TO DETERMINE IF YOUR PROPERTY IS AFFECTED BY OR LIES WITHIN A FLOODPLAIN. • THE APPLICANT SHALL KEEP THIS EXEMPTION POSTED ON-SITE AT ALL TIMES DURING LAND CLEARING. • THE PROPERTY OWNER AND/OR AGENT SHALL BE RESPONSIBLE FOR OBTAINING ALL APPLICABLE STATE/FEDERAL PERMITS. ____________________________________________ Lynn Swartzel Environmental Permitting & Zoning Coordinator