Project No. 21-139A Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 4
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. A
5061 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0405
PROJECT NAME: Bryn Mawr Condominiums Concrete
Repairs 2021 – Bldg. A DATE: December 1, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Limited access balconies – Units 301, 401, 701 & 901
OBSERVATIONS:
Unit 301
• The surface spall at the master bedroom door and the ceiling spall at the east balcony have been poured.
• Surface spall has been ground and is ready for waterproofing and top coat.
• Ceiling spall has been ground and is ready for stucco finish.
• New wood buck installed at south jamb as per recommendations from previous report.
• The temporary weather wall has been removed and the sliding glass doors have been reinstalled.
Unit 401
• Edge repair has been poured at the east balcony and is ready for waterproofing and top coat.
• A temporary weather wall has been placed at the north facing living room SGD.
• The SGD panels and top track have been removed at the ceiling spall.
• Corroded bars have been exposed, power tool cleaned, and are coated with approved corrosion inhibitor.
• Concrete has been placed with the approved repair mortar.
Unit 701
• Stucco has been repaired at (3) ceiling locations and is ready for paint.
• Ceiling paint is peeling at other areas, but the concrete is found to be sound.
Unit 901
• Stucco has been placed at the northeast corner column and is ready for paint.
• The surface spall at west facing balcony has been poured and is ready for waterproofing and top coat.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139A Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 2 of 4
RECOMMENDATIONS:
Unit 301
• Apply the approved waterproofing and top coat to the exterior balcony.
• Apply a bead of sealant along the interior and exterior perimeter of door.
Unit 401
• Place new stucco at the ceiling to match the existing surrounding areas.
• Reinstall the SGD with stainless steel Tapcons and provide a bead of sealant around the perimeter of the doors.
• Remove the temporary wall and repair any areas affected by the wall.
Unit 901
• Apply the approved waterproofing and top coat to the repaired surface spall at the west balcony.
• Reinstall hurricane shutters a minimum 24 hours after final top coat applied.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139A Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 3 of 4
Pic 1 – Unit 301
Surface spall at master bedroom SGD.
Pic 2 – Unit 301
SGD reinstalled at master bedroom.
Pic 3 – Unit 401
Ceiling spall at north facing SGD.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139A Report No. 6
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 4 of 4
Pic 4 – Unit 701
Stucco repair at ceiling.
Pic 5 – Unit 901
Surface spall repair.