Loading...
HomeMy WebLinkAboutFlorida Department of Regulation (FDEP) Permit or Exemption fII� i J r3 } • I r • 1 AC 0 ! qPermit Nanmbeir i, 56405630-0014ft: Fo _ - fir•' ,� k P Southeast ��istrict. � 4* a • t, • -X M w .i wsr9 4 1 I Waterbody: ` Indian River width 10000'± • h Cosculluela Residence Existing • • Plmn AB 10701 S. Ocean Dr., Lot 875 w a♦♦♦fir '.ii - ::yam 3���a�c � ,.��r;•♦��� T,.fit r�E d� UP jf Proposed 1200-6 lb. 4, Boat Lift Ell 1 Indian River width 10000'± ♦♦♦♦♦♦♦♦♦♦♦♦♦♦�O� - _ . j A .1 sq.ft. ♦♦♦�♦♦♦♦;♦♦♦♦♦♦� rjri ♦♦♦♦`♦♦♦♦'fir Totalover 1 ♦♦♦♦'�i 1 riparian by • • increments • out • 1 'frorn proposed dock extension: BARREN I'' ermit Number fit Southeast District s 1 1 1 Scale fr Proposed Cosculluela Residence p Wilco Construction, Inc. Date:6/15/21 10701 S. Ocean Dr., Lot 875 Plan View--------Jensen Beach,FL34957--_.__-- -- --(7-72)4.60.6928;FAX(7.72)460-6929_ _ .-- I I Pilings: TYPICAL DOCK AND ACCESSWAY CROSS SECTION Dock: min.8"O, 2.5 (N.T.S.) i CCA ! max. 10'OC The work specified herein Boat Lift: min. 10"0, ! has been designed and all 2.5 CCA PT wood work shall be in per boat lift accordance with the 2020 Florida Width:4',10' dimensions Building Code(7th Edn.). All codes reference herein REVIEWED FOR o f Z y are per the latest adopted �`' P P f * irE o edition. Te LU IE COUNTY 4 a (G� Permit Number C� r STRINGERS: Decking: 5&405630-001-EE ti 2"x8"0.4 ACQ spaced 1"x6"Composite Decking fastened p Southeast District ° I at max. 18"with min.1/2"SS w/min.2.5"stainless steel composite o lag bolts on each piling(lap decking screws 4141 spliced) ° $Z v i s- �� RD NOTE: =I 6 Design loads to meet Al ov u_ 2020 FBC-7th Edn_ Wind load as per ANSI/ O ASCE 7-16 /(2)/16d Toe r ►- ` Speed = 170 mph Nails Typical > v Exposure D Bloc : m cu i ' Importance Factor= 1.0 To bE added as needed: Joist: bpF� 2"x6" 12"0.4 ACQ strap 2"x8"0.4 ACQ on block @mid stringers each side of piling. tj CM (fast ed w/min. 3 ea. Bolted w/5/8" min. "SS screws/nails) SS cut rods. M.H.W. M.L.W. CANAL BOTTOM 6'min. Lj penetration Cosculluela Wilco Construction, Cross View Residence-Dock { Inc. Structural N ll II ENGINEERING REVIEW.• NOTE TO EXAMINER: BOAT LIFT TOP CARRIER BEAMS AND THIS CERTIFIED ENGINEERED MOUNTING BRACKETS COMPLY WITH WIND DRAWING HAS BEEN PREPARED LOAD REQUIREMENTS OF THE 7TH EDITION �f�® SPECIFICALLY FOR USE ONLY BY: (2020) FLORIDA BUILDING CODE, PER REVIEWED FOR ASCE 7-16, AND PER DESIGN LOAD REQUIREMENTS OF THE 2015 s CODE COMPLIANCE EDITION ALUMINUM ASSOCIATIONS"S ALUMINUM D E S I G N MANUAL. ` °°pp0°°a°°DDDD°u°°000 BEAMS AND MOUNTING BRACKETS . LU IE CR o °ly� M "el� e 9 °ooOoo INSTALLED PER HI-TIDE INSTRUCTIONS WILL 0 o°°° p C E IV 8 4 °o EXCEED ULTIMATE DESIGN WIND SPEED OF 200 MPH (EXPOSURE CATEGORY C OR D) a o P90.43855 BOATS ARE TO BE REMOVED FROM BOAT LIFTS PRIOR TO A MAJOR WIND EVENT. o *� P V Jui 0 7 2 d� ©_ P c O STATE OF PILINGS 9 / o'o°o FS 4 O R I O P o°° 0 PILING PENETRATION TO BE 10" Q 4 • °OOo 3 OOIno.V A D INTO THE SAND BOTTOM OR 5" Goo INTO ROC K S T R A TA SUB-SURFACE CONDITIONS CAN ROGER BABER VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE P.E. CAPACITIES TO COMPLY WITH 2 MCR PROFESSIONAL ENGINEERING O 43855 24JO NE DIXIE HWY FBC 2020. ALL PILINGS TO BE ✓ENSEN BEACH, FL 34957 8" MINIMUM DIAMETER 2.5 C.C.A PRESSURE TREATED WOOD, PRE-STRESSED CONCRETE OR COMPARABLE EQUIVALENT. 9 PILING MOUNTING TABS MINIMUM (2) 3/8" DIA. SS LAG BOLTS FOR WOOD PILING OR SS CONCRETE ANCHORS FOR CONCRETE PILINGS PER PILING ELECTRICAL REUlEW. X2 ELECTRICAL REVIEW. _ _ REQUIRED.MINIMUM (2) 3/8"" ___3/_4_MP__ELECTRIC-MOTOR.-----1=1/2-HP ELECTRIC-MOTOR-- ------- -----a _ - _______-_--____ _ ___- 10.8 AMPS @ 115V EACH -- AMPS @ 115V EACH ATTACHING CARRIAGENG TAB AMPS @ 230V EACH 9.6 AMPS @ 230V EACH ATTACHING MOUNTING TAB TO QUANTITY: 2 QUANTITY: 2 LIFT REQUIRED PER PILING. MOUNTING TAB CONSTRUCTED TOTAL WATTS: 2484 TOTAL WATTS: 4416 FROM 1/4- X 2- ALUMINUM 6 0 6 1 - T 6 F L A T B A R 12 PVT;GUIDE POLES 4 11 DDIDE POLE BRACKETS 4 10 BUNK BRACKETS W1 HARDWARE 4 9 ALUMINUM BUNKS OR CARPETED WOOD BUNKS 2 B LIFTER BEAM ASSEMBLY 2 /--I/-I� ^�D� l P/LING MOUNPNC TABS /f REWIRED B 12,000 LB. GEAR DRIVE & W(l/l/l '7Ur BOA TLIFTS AND MARINE PRODUCTS O LEFT TLW CARR/ER ASSEMBLY T 0 4050 SEL UI TZ ROAD lF 5 R/DHT TOP MMEA ASBEMBLY T GEAR DRIVE X2 BOAT LIFT (2020 FBC) J 5 6 XIJOMSSAC.lYPE304 4 FORT PIERCE, FL 34981 .2 J 4 HP SS NOTOR !-1 2 NP ON X2 MODELS - 2 1-800-544-0735 www.hi-tide.com I DEAR ORiYE GEAR Box 2 R. HYDE SCALE: NTS DATE: 1/4/21 REV. 1 DESCMP RLW OT DEPAR,, FLORIDA DEPARTMENT OF Ron DeS mtis Govor cA i Environmental Protection Jeanette Nunez z " c Lt.Governor Q°�"'�Fa e�° Southeast District Office Shawn Hamilton; rAi 3301 GunClub Road,MSC 7210-1 Interim Secretary, West Palm Beach,FL 33406 561-681-6600 July 19, 2021 IN. SETBA REQ. + FR NT SIDES Juan Cosculluela CNR REAR IDES ` 16331 SW 50th Ter. ZNG. Miami, FL 331-85 TECH. Sent via e-mail: icc,osculluela@,yahoo.com i Re: File No.: 56-0405630-001-EE File Name: r osculluela Single Family Home Dear Juan Cosculluela: I i On June 16,2021, we received your request for verification of exemption to install a 220 sq. ft. L-shaped dock with an associated boatlift. The project is located in South Indian River, within the Jensen Beach to Jupiter Inlet Aquatic Preserve, Outstanding Florida Waters, Class 11 Waters, adjacent to 10701 S Ocean Dr,Lot 857,Jensen Beach(Section 11,Township 37 South,Range 41 East), in Saint Liucie County(Latitude N 27' 16' 21.6482",Longitude W-80' 12' 30.8021"). Your request has been reviewed to determine whether it qualifies for(1)regulatory exemption, (2)proprietary authorization(related to state-owned submerged lands), and(3) federal approval that may be necessary for work in wetlands or waters of the United States. Your project qualifies for all three. However,this letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. I If you change the project from what you submitted,the authorization(s) granted may no longer be valid at the-time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes. If you have any questions regarding this matter,please contact John Tracey at the letterhead address or at 561-681-6717, John.Tracey_@FloridaDEP.gov_ 1. Regulator yi Review—VERIFIED I i www.floridadev.aov ' I t Project No.: 56-0405630-001-EE Project Naive: Cosculluela Single Family Home Page 2 of 7 Based on the information submitted,the Department has verified that the activities as proposed are exempt,under Chapter 62-330.051(5)(b),Florida Administrative Code, from the need to obtain a regulatory permit under Part IV of Chapter 373 of the Florida Statutes. This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification may not be valid if site conditions materially change,the project design is modified, or the statutes or rules governing the exempt-activity are amended. In the event you need to re-verify the exempt status for the activity;a,new request and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. 2. Proprietary Review-GRANTED The Department,acts as staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) and issues certain authorizations for the use of sovereign submerged lands. The Department has the authority to review activities on sovereign submerged lands under Chapters 253 and 258 of the Florida Statutes, and Chapters 18-20 and 18-21 of the Florida Administrative Code. The activity appears to be located on sovereign submerged lands owned by the Board of Trustees. The activity is not exempt from the need to obtain the applicable proprietary authorization. As staff to the Board of Trustees,the Department has reviewed the activity described above, and has determined that the activity qualifies for a letter of consent under Section 253.77,Florida Statutes,to construct and use the activity on the specified sovereign submerged lands, as long as the work performed.is located within the boundaries as described. herein-and is consistent with the terms and conditions herein. During the term of this Letter of Consent you shall maintain satisfactory evidence of sufficient upland interest as required by paragraph 18-21.004(3)(b),Florida Administrative Code. If such interest is terminated or the Board of Trustees determines that such interest did not exist on the date of issuance of this Letter of Consent, this Letter of Consent may be terminated by the Board of Trustees at its sole option. If the Board of Trustees terminates this Letter of Consent,you agree not to assert a claim or defense against the Board of Trustees arising out of this Letter of Consent. Special Consent Conditions 1. The applicant agrees to indemnify, defend and hold harmless the Board of Trustees and the State of Florida from all claims, actions, lawsuits and demands in any form arising out of the authorization to use sovereignty submerged lands or the applicant's use and construction of structures on sovereignty submerged lands. This duty to indemnify and hold harmless will include any and all liabilities that are associated with the structure or activity including special assessments or taxes that are now or in the future assessed against the structure or activity during the period of the authorization. 2. Failure by the Board of Trustees to enforce any violation of a provision of the authorization or waiver by the Board of Trustees of any provision of the authorization Project No.:56-0405630-001-EE Project Name:Cosculluela Single Family Home Page 3 of 7 I will not invalidate the provision not enforced or waived,nor will the failure to enforce or a waiver prevent the Board of Trustees from enforcing the unenforced or waived 'I provision in the event of a violation of that provision. 3. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with the provisions and conditions of the authorization,the authorization may be terminated by the Board of Trustees after written notice to the applicant or its successors or assigns. Upon receipt of such notice,the applicant or its successors or assigns will have thirty(30) days in which to correct the violations. Failure to correct the violations within this period will result in the automatic revocation of this authorization. 4. All costs incurred by the Board of Trustees in enforcing the terms and conditions of the authorization will be paid by the applicant. Any notice required by law will be made by certified mail at the address shown on page one of the authorization. The applicant will notify the Board of Trustees in writing of any change of address at least ten days before - the change becomes effective. I 5. This authorization does not allow any activity prohibited in a conservation easement or restrictive covenant that prohibits the activity. .I General Conditions for Authorizations for Activities All authorizations granted by rule or in writing under Rule 18-21.005, F.A.C., except those for I geophysical testing,I shall be subject to the general conditions as set forth in paragraphs(a)through (i) below. The general conditions shall be part of all authorizations under this chapter, shall be binding upon the grantee, and shall be enforceable under Chapter 253 or 258,Part II,F.S. (a)Authorizations are valid only for the specified activity or use. Any unauthorized deviation from the specified activity or use and the conditions for undertaking that activity or use shall constitute a violation. Violation of the authorization shall result in suspension or revocation of j the grantee's use of the sovereignty submerged land unless cured to the satisfaction of the Board. (b)Authorizations convey no title to sovereignty submerged land or water column,nor do they constitute recognition or acknowledgment of any other person's title to such land or water. 9 (c)Authorizations may be modified, suspended.or revoked in accordance with their terms or the remedies provided in Sections 253.04 and 258.46, F.S., or Chapter 18-14,F.A.C. I (d) Structures or activities shall be constructed and used to avoid or minimize adverse impacts to sovereignty submerged lands and resources. (e) Construction,use, or operation of the structure or activity shall not adversely affect any species which is endangered, threatened or of special concern, as listed in Rules 68A-27.003, 68A-27.004, and 68A-27.005,F.A.C. I i I � I Project No.: 56-0405630-001-EE Project Name: Cosculluela Single Family Home Page 4 of 7 (f) Structures or activities shall not unreasonably interfere with riparian rights. When a court of competent jurisdiction determines that riparian rights have been unlawfully affected,the structure or activity shall be modified in accordance with the court's decision. (g) Structures or activities shall not create a navigational hazard. (h) Structures shall be maintained in a functional condition and shall be repaired or removed if they become dilapidated to such an extent that they are no longer functional. This shall not be construed to prohibit the repair or replacement subject to the provisions of Rule 18-21.005, F.A.C.,within one year, of a structure damaged in a discrete event such as a storm, flood, accident, or fire. (i) Structures or activities shall be constructed, operated, and maintained solely for water dependent purposes, or for non-water dependent activities authorized under Paragraph 18- 21.004(1)(f),F.A.C., or any other applicable law. 3. Federal Review-APPROVED Your proposed activity as outlined in your application and attached drawings qualifies for Federal authorization pursuant to the State Programmatic General Permit V-RI, and a SEPARATE permit or authorization will not be required from the Corps. Please note that the Federal authorization expires on July 26, 2021. However,your authorization may remain in effect for up to 1 additional year, if provisions of Special Condition 19 of the SPGP V-R1 pen-nit instrument are met. You, as permittee, are required to adhere to all General Conditions and Special Conditions that may apply to your project. Special conditions required for your project are attached. A copy of the SPGP V-Rl with all terms and conditions and the General Conditions may be found at httys://www.saj.usace.qM.mil/Missions/Re.gulatoEL/Source-Book. Authority for review-an agreement with the USACOE entitled"Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection(or Duly Authorized Designee), State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act. Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to ensure compliance with appropriate statutes and administrative codes. If the activities are not in compliance,you may be subject to penalties under Chapter 373, F.S., and Chapter 18- 14,F.A.C. NOTICE OF RIGHTS This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57,F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition,this action will not be final and effective until a subsequent order of the Department. Because the achninistrative hearing Project No.:56-0405630-001-EE Project Name: Cosculluela Single Family Home Page 5 of 7 process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application. Petition for Administrative Hearing i A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding(hearing)under Sections 120.569 and 120.57,F.S. Pursuant to Rules 28- 106.201 and 28-106.301,F.A.C., a petition for an administrative hearing must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a qualified representative; the name, address, and telephone number of the petitioner's representative, if any,which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests will be i affected by the agency determination; I (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so j indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action,including an explanation of how the alleged facts relate to the specific rules or statutes; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the ; petitioner wishes the agency to take with respect to the agency's proposed action_ The petition must be filed(received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35,Tallahassee,Florida 32399- 3000, or via electronic correspondence at Agency Clerk@dgp.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. 1 Time Period for Filing a Petition In accordance with Rule 62-110.106(3),F.A.C.,petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3),F.S.,must be filed within 14 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3),F.S.,must be filed within 14 days of publication of the notice or within 14 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action,you may elect to do so pursuant Rule 62- 1 110.106(10)(a). The failure to file a'petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination(hearing)under Sections 120.569 and I i I Project No.:56-0405630-001-EE Project Name: Cosculluela Single Family Home Page 6 of 7 120.57,F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention(in a proceeding initiated by another parry)will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205,F.A.C. If you do not publish notice of this action,this waiver will not apply to persons who have not received written notice of this action. Extension of Time Under Rule 62-110.106(4),F.A.C., a person whose substantial interests are affected by the. Department's action may also request an extension of time to file a petition for an administrative hearing.The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35, Tallahassee,Florida 32399- 3000, or via electronic correspondence at Agency Clerk a.dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275,F.S.,may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275,F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department. Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S.,by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station 935, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department. EXECUTION AND CLERKING Executed in West Pahn Beach, Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Project No.:56-0405630-001-EE Project Name: Cosculluela Single Family Home Page 7 of 7 I II Danielle C. Sattelberger Environmental Manager i Southeast District Enclosures: Attachments A- Specific Exemption Rule Special Conditions for Federal Authorization for SPGP V-Rl General Conditions for Federal Authorization for SPGP V-Rl Project drawings, 4 pages I CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons: ! FDEP—Danielle Sattelberger,John Tracey Linda Petz, linenviion@gmail.com I FILING AND ACKNOWLEDGMENT FILED, on this date,pursuant to Section 120.52, F. S.,with the designated Department Clerk, receipt of which is hereby acknowledged. U3"GzfUGvc�c�a U- '1 J July 19,2021 as Clerk Date I i I I i I I I I , I I I i I I i , Attachment A 62-330.051 Exempt ActiAties. The activities meeting the limitations and restrictions below are exempt from permitting. However,if located in,on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258,F.S., as applicable. (5)Dock,Pier,Boat Ramp and Other Boating-related Work— (b)Installation of private docks,piers,and recreational docking facilities,and installation of local governmental piers and recreational docking facilities, in accordance with section 403.813(1)(b), F.S. This includes associated structures such as boat shelters,boat lifts,and roofs,provided: 1.The cumulative square footage of the dock or pier and all associated structures located over wetlands and other surface waters does not exceed the limitations in section 403.813(1)(b),F.S.; 2.No stricture is enclosed on more than three sides with walls and doors; 3. Strictures are not used for residential habitation or commercial purposes, or storage of materials other than those associated with water dependent recreational use;and 4. Any dock and associated structure shall be the sole dock as measured along the shoreline for a minimum distance of 65 feet,unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline, in which case there may be one exempt dock allowed per parcel or lot. o Special Condition's for Federal Authorization for SPGP V-R1 I Note: JAXBO (Jac'ksonville District's Programmatic Biological Opinion),referenced throughout,may be found online in the Jacksonville District Regulatory Division Sourcebook, or at littp://cdml602llcontentdm.ocic.or /g utils/(2etfile/collection/i)16021col13/id/577. I The SPGP V-Rl instrument and all attachments may be found online through the Sourcebook, or at https://www.sai.usace.army.mil/SPGP/ In addition to the conditions specified above,the following Special Conditions apply to all projects reviewed and/or authorized under the SPGP V-Rl. Special Conditions for All Proiects 1. Authorization, design and construction must adhere to the terms of the SPGP V-R1 instrument including the Procedure and Work Authorized sections. 2. Design and construction must adhere to the PDCs for In-Water Activities (Attachment 6, i from PDCs AP.7 tlirough AP11, inclusive, of JAXBO) (Reference: JAXBO PDC AP.1.). 3. All activities performed during daylight hours (Reference: JAXBO PDC AP.6.). i 4. For all projects!involving the installation of piles or sheet piles,the maximum number of piles, sheet piles or concrete slab walls or boatlift I-beams installed by impact hammer per day is i limited to no more than 5 per day. Any installation of metal pipe or metal sheet pile by impact hammer is not authorized(Reference: Categories D and E of JAXBO PDCs for In-Water Noise from Pile and Sheet Pile Installation,page 86.). 5. Projects within ithe boundary of the NOAA Florida Keys National Marine Sanctuary require ! prior approval from the Sanctuary(Reference: JAXBO PDCs AP.14 and A1.6). I 6. Notifications to!the Corps.For all authorizations under this SPGP V-R1, including Self- Certifications,the Permittee shall provide the following notifications to the Corps: a. Commencement Notification. Within 10 days before the date of initiating the work authorized by this permit or for each phase of the authorized project,the Permittee shall provide a written notification of the date of commencement of authorized work to the Corps. jb. Corps Self-Certification Statement of Compliance form. Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the "Self-Certification Statement of Compliance"form(Attachment 32) and submit it to � { the Corps. In the event that the completed work deviates in any manner from the { authorized work,the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the"Self-Certification Statemlent of Compliance" form. The description of any deviations on the"Self- Certification Statement of Compliance"form does not constitute approval of any a deviations by the Corps. c. Permit Transfer. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit Twill continue to be binding on the new owner(s) of the property. To validate i i the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions,have the transferee sign and date the enclosed form (Attachment 2). d. Reporting Address. The Permittee shall submit all reports,notifications, documentation, and correspondence required by the general and special conditions of this permit to the following address. (1) For standard mail: U.S. Army Corps of Engineers,Regulatory Division, Enforcement Section,P.O. Box 4970, Jacksonville,FL, 32232-0019. (2) For electronic mail: SAJ-RD-Enforceiiient@.usace.aiiny.mil (not to exceed 10 MB). The Permittee shall reference this permit number, SAJ- 2015-02575 on all submittals. 7. The District Engineer reserves the right to require that any request for authorization under this SPGP V-R1 be evaluated as an Individual Permit. Conformance with the terms and conditions of the SPGP V-RI does not automatically guarantee Federal authorization. 8. On a case-by-case basis,the Corps may impose additional Special Conditions which are deemed necessary to minimize adverse environmental impacts. 9. Failure to comply with all conditions of the SPGP V-Rl constitutes a violation of the Federal authorization. 10.No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work,the Applicant/Permittee or other party on the Applicant's/Perimittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, and contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (NRIS). Information can be found at http://ti,,,,,vw.er.nps.aov nr/research. a. If, during the initial ground disturbing activities and construction work,there are archaeological/cultural materials unearthed(which shall include,but not be limited.to: pottery, modified shell, flora, fauna,human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement),the Permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245-6333 and the Corps Regulatory Project Manager to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest,the Corps may modify, suspend, or revoke the permit in accordance with 33 C.F.R. § 325.7. b. In the unlikely event that human remains are identified,the remains will be treated in accordance with Section 872.05,Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, and the State Archaeologist(850-245- 6444) and the Corps Regulatory Project Manager shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 11. The Permittee is responsible for obtaining any"take"permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with these laws. The Permittee should j contact the appropriate local office of the U.S. Fish and Wildlife Service to determine if such "take"permits are required for a particular activity. i 12.For Projects auihorized under this SPGP V-R1 in navigable waters of the U.S.,the Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other;alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters,the Permittee will be required,upon due'notice from the Corps of Engineers,to remove,relocate, or alter the structural work or obstructions caused thereby,without expense to the United States. No claim shall be itmade against the United States on account of any such removal or alteration. 13. The SPGP V-RI will be valid through July 26,2021 unless suspended or revoked by issuance of a public notice by the District Engineer. The Corps, in conjunction with the Federal resource agencies,will conduct periodic reviews to ensure that continuation of the permit during the period ending July 26, 2021,is not contrary to the public interest. The SPGP V-Rl will not be extended beyond July 26,2021,but may be replaced by a new SPGP. If revocation occurs, all future applications for activities covered by the SPGP V-RI will be evaluated by the Corps. 14. If the SPGP V-R1 expires, is revoked, or is terminated prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SPGP V-R1 will remain in effect provided the activity is completed within 12 months of the date the SPGP V-R1 expired or was revoked. i j Special Conditions for Docks,Piers,Associated Facilities, and other Minor Pilin- i Supported Structures 1. For temporary structures associated with marine events. Upon completion of the event,.these strictures must be removed and, to the maximum extent practical,the site must be restored to pre-construction elevations. Water depths in the area of marine events must be deep enough to support at least 5 ft!of water depth under the keel of a vessel and between the keel of a vessel and Endangered Species Act listed coral colonies,if present,when transiting to the mooring areas (Reference: JAXBO PDC A2.1.4.). i2. Educational Signs. For commercial,multi-family, or public facilities, and marine events, signs must be posted as described below(Reference: These replicate JAXBO PDCs A.2.2 and A.2.2.1 to A.2.2.3.,1inclusive, within the table PDCs Specific to Activity 2 -Pile Supported Structures and Anchored Buoys, starting on page 112.): a. (A2.2.) For commercial,multi-family, or public facilities, and marine events, signs must be posted in a visible location(s), alerting users of listed species in the area susceptible to i vessel strikes and hook-and-line captures. The most current version of the signs that must be downloaded and sign installation guidance are available at: (http://sero.ninfs.noaa.gov/protected resources;section 7/protected species educational s igis/index.htlnl). The signs required to be posted by area are stated below: (1) (A2.2.1.)�All projects in Florida shall use the Save Sea Turtle, Sawfish, and Dolphin sign. These signs shall include contact information to the sea turtle and marine mammal;stranding networks and smalltooth sawfish encounter database. j (2) (A2.2.2.)Projects within the North Atlantic right whale educational sign zone shall post the Help Protect North Atlantic Right Whales sign. (3) (A2.2.3.) On the east coast of Florida,projects located within the St. Johns River and those occurring north of the St. Johns River to the Florida-Georgia line shall post the Report Sturgeon sign. On the west coast of Florida,projects occurring from the Cedar Key,Florida north to the Florida-Alabama line. 3. Monofilament Recycling Bins. For commercial,multi-family, or public facilities, monofilament recycling bins must be provided as described below (Reference: The below replicates PDC A.2.3 within the table PDCs Specific to Activity 2 -Pile Supported.Structures and Anchored Buoys,the PDC itself on page 113 of the JAXBO.): a. (A2.3.)For commercial, multi-family, or public facilities,monofilament recycling bins must be provided at the docking facility to reduce the risk of turtle or sawfish entanglement in, or ingestion of,marine debris. Monofilament recycling bins must: (1) (A2.3.1.)Be constructed and labeled according to the instructions provided at http://n3rrp.myflvc.com. (2) (A2.3.2.)Be maintained in working order and emptied frequently(according to littp://nu-ip.Myffivc.com standards) so that they do not overflow. 4. North Atlantic Right Whale. The attached North Atlantic Right Whale Information Form (Attachment 27) describes the presence of North Atlantic right whales in the area and the Federal regulations governing the approach to North Atlantic right whales. (The FDEP or Designee will attach this document to their authorizations for a dock project(new construction,repair, or replacement) at a private residence located within 11 nautical miles of North Atlantic right whale critical habitat as measured in a radius from the center of the nearest inlet to open ocean described by Attachment 29,the North Atlantic Right Whale Educational Sign Zones (from Section 2.1.1.4 of JAXBO,pages 31 and 32, inclusive) (Reference: JAXBO PDC A2.4.). 5. Aids to Navigation. Aids to navigation must be approved by and installed in accordance with the requirements of the U.S. Coast Guard(i.e., 33 C.F.R., chapter I, subchapter C,part 66, Section 10 of the Rivers and Harbors Act, and any other pertinent requirements) (Reference: JAXBO PDC A2.5.). 6. Lighting for docks installed within visible distance of ocean beaches. If lighting is necessary, then turtle-friendly lighting shall be installed. Turtle-friendly lighting is explained and examples are provided on the Florida Fish and Wildlife Conservation Commission website: http:,/in,vfrvc.coin/wildlifehabitats/managed/sea-turtles/li,,7htin.ip�/(Reference: JAXBO PDC A2.8.). 7. Construction Location. Project construction shall take place from uplands or from floating equipment(e.g.,barge);prop or wheel-washing is prohibited(Reference: JAXBO PDC A2.9.). 8. Regarding submerged and emergent aquatic vegetation,the design and construction of a Project must comply with the following: a. A pile supported structure(i)that is located on a natural waterbody (i.e., outside an artificial waterway that was excavated for boating access and is bordered by residential properties) and(ii) that is within the range of seagrass (estuarine waters within all coastal counties except for Nassau, Duval, St Johns,Flagler and Volusia north of Ponce Inlet), will be constructed to the following standards: (1) Must comply with or provide a higher level of protection than,the protective criteria in the joint U.S.Army Corps of Engineers'/National Marine Fisheries Service's "Construction Guidelines in Florida for Minor Piling-Supported Structures Constructed in or over Submerged Aquatic Vegetation(SAV),Marsh or Mangrove Habitat"updated November 2017 (Attachment 5). (2) In addition to (1), above, IF the project is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida),THEN the design and construction shall comply with, in some cases,the more restrictive requirements within paragraph 8.c., below (Reference: JAXBO PDC A2.17). Jb. For all other Projects,(1) Within the range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida),the presence of submerged aquatic vegetation will be determined utilizing the"Submerged Aquatic Vegetation Survey Guidelines" (Attachment 7). If no survey performed, aquatic vegetation, including Johnson's seagrass,1will be presumed to be present for purposes of this Special Condition. (2) Outside the range of Johnson's seagrass but within the range of seagrass (estuarine waters within all coastal counties except for Nassau,Duval, St Johns,Flagler and Volusia County north of Ponce Inlet)and within tidal waters, the presence of seagrass and tidal 1freshwater submerged aquatic vegetation will be determined using the "Submerged Aquatic Vegetation Survey Guidelines°" (Attachment 7)unless a site visit I or aerial photography observes absence during the growing season(if water depth and clarity allows) or aquatic vegetation has not been found in the vicinity in the past. (3) Pile-supported structures,IF aquatic vegetation is present(including seagrass,tidal freshwater submerged aquatic vegetation and emergent vegetation), THEN must comply with or provide a higher level of protection than,the protective criteria in the joint U.S.Army Corps of Engineers'/National Marine Fisheries Service's "Construction Guidelines in Florida for Minor Piling-Supported. Structures Constructed in or over Submerged Aquatic Vegetation(SAV), Marsh or Mangrove Habitat"updated November 2017 (Attachment 5). (4) In addition to (1)to (3) above,IF the proposed dock or proposed structure is within range of Johnson's seagrass (the range of Johnson's seagrass is defined as Turkey Creek/Palm Bay south to central Biscayne Bay in the lagoon systems on the east coast of Florida), and IF the proposed dock or proposed structure falls within the following scenarios, THEN the design and construction shall comply with, in some cases, the ;j more restrictive requirements within paragraph 8.c.,below. (Reference: The following j jreplicates "Scenario B" as defined within A2.17., PDCs for Docks or Other Minor i Structures of JAXBO.): (i) Dock!replacement in the exact footprint(i.e., same location/configuration/size) as the previous dock and: (a) within Johnson's seagrass critical habitat with No current seagrass survey (completed no earlier than 1 year before subinitting the application); or, Johnson's seagrass under the dock; or,Native seagrass, other than Johnson's jseagrass,under the dock; or, I (b) within the Range of Johnson's seagrass (outside of critical habitat)with.No..._..__ current seagrass survey or,Johnson's seagrass under the dock, (ii)New docks or dock expansions and: (a) within Johnson's seagrass critical habitat; or, (b) within the Range of Johnson's seagrass (outside of critical habitat) with:No current seagrass survey (completed no earlier than 1 year before submitting the application) or, Johnson's seagrass within property limit. c. The following additional restrictions apply when required by paragraphs 8.a.(2)or 8.b.(4), above (Reference: The following replicates the"Dock PDCs for Scenario B"within A2.17. PDCs for Docks or Other Minor Structures of JAXBO.): (1) To avoid and minimize impacts to Johnson's seagrass and native,non-listed seagrasses to the maximum extent practicable: (i) The dock must be positioned to avoid and minimize effects to Johnson's seagrass. (ii) Over any area that contains Johnson's seagrass or native, non- listed seagrasses, the dock shall be oriented in a north-south orientation to the maximum extent that is practicable to allow maximum sunlight under the structure. (iii)If practicable,terminal platforms shall be placed in deep water, waterward of Johnson's seagrass beds or native,non-listed seagrasses beds or in an area devoid of Johnson's seagrass or native,non-listed seagrasses. (iv)Piles must be spaced a minimum of 10 ft apart in any area that contains Johnson's seagrass to minimize direct impacts. (v) Piles shall be installed in a manner that will not result in the formation of sedimentary deposits (e.g., donuts or halos) around the newly installed pilings. (vi)No covered boat lifts are allowed over any Johnson's seagrass. (2) Decking options: Deck surfaces (parallel with the water)that are located waterward of the MHWL must be constructed of grated materials or plank construction or a combination of the both methods (e.g.plank decking on the walkway and grated decking on the terminal platform). These decking options are,described below: (i) For grated decking: (a) Height requirement: The surface of the structure,including the dock walkway (the over-water narrow portion connecting the terminal platform to the shore and any over-water ramp required for access) and the dock,must be a miminum of 3 ft above MHW when constructed with grated decking. (b) Size limitations: The dock walkway is lunited to a width of 4 ft. The terminal platform is limited to a total area of 160 ft2. Marginal docks are limited to a width of 5 ft. The 5 ft width restriction is measured from wet side of the seawall. For example, if a seawall cap is 3 feet overwater then the dock would be limited to 2 feet. (c) Material description: Decking materials shaped in the form of grids, grates, lattices, etc.,to allow the passage of light through the open spaces. These materials must provide a minimum of 43% open space. (ii)For plank decking: (a) Height requirement: The surface of the structure, including the dock walkway (the over-water narrow portion connecting the terminal platform to the shore and any over-water ramp required for access) and the dock,must be a minimum of 5 ft above MHW when constructed of plank decking. I ' I ' I I (b) Siize limitations: The dock walkway is limited to a width of 4 ft. The terminal platform is limited to a total area of 120 fe. Marginal docks are limited to a width of 5 ft. (c) Material description: Deck boards may be constructed of any material. Deck Boards must be installed to provide a minimum of a 0.5-in gap between individual deck boards. d. Aids to Navigation in Acropora critical habitat. The distance from Aids to Navigation (ATONs)to ESA-listed corals and Acropora critical habitat shall ensure there are no impacts to the corals or the essential feature of Acropora critical habitat from the movement of buoys and tackle. The appropriate distance shall be based on the size of the anchor chain or other tackle to be installed to secure the buoy to its anchor,particularly when the design of the ATON does not prohibit the contact of tackle with the marine bottom. In alIl cases,buoy tackle will include flotation to ensure there is no contact between the anchor chain or line and the marine bottom(Reference: JAXBO PDC A2.10.). I I ,I I I I I I I 1 I i I i I a I { I I I I I General Conditions for Federal Authorization for SPGP V-Rl 1. The time limit for completing the work authorized ends on July 26,2021. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the.terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer,you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit,you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit,you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project,you must comply with the conditions specified in the certification as special conditions to this permit. 6. You.must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, orlocal authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This pen-nit does not authorize interference with any existing orproposed Federal projects. 2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted projector uses thereof as a result of other permitted or unpernitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. I I c. Damages to persons,property, or to other permitted or unpennitted activities or structures I baused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension,or revocation of this permit. a 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to,the following: i a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). j c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension,modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced I enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate! You will be required to pay for any corrective measures ordered by this office,and if you fail to comply with such directive,this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred,the terms and conditions of this permit will continue to be binding on the new owner(s)of the property.To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions,have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that, if future operations by the United States require the removal,relocation, or other alteration, of the structures or work herein authorized, or if, m the opinion of the Secretary of the Anny or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters,the Permittee will be required,upon due notice from the U.S. Army Corps of Engineers,to remove, relocate, or alter the structural work or i obstructions caused thereby,without expense to the United States.No claim shall be made against the United!States on account of any such removal,relocation or alteration. I i I I j � Department of the Army Permit Transfer for SPGP V-R1 PERMITEE: PERMIT NUMBER: DATE: ADDRESS/LOCATION OF PROJECT: (Subdivision) (Lot) (Block) When the structures or work authorized by this permit are still in existence at the time the property is transferred,the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Arny permits is finite,the permit itself,with its limitations, does not expire. To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions,have the transferee sign and date below and mail to the U.S. Army Corps of Engineers,Enforcement Branch, Post Office Box 4970, Jacksonville,FL 32232-0019. (Transferee Signature) (Date) (Name Printed) (Street address) (Mailing address) (City, State, Zip Code) STANDARD MANATEE CONDITIONS FOR IN-WATER WORK I 2011 The permittee shall;comply with the following conditions intended to protect manatees from direct project effects: i a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones,and the need to avoid collisions with and injury to manatees.The permittee shall advise all construction personnel that there are civil and criminal penalties for harming,harassing,or killing manatees which are protected under the Marine Mammal Protection Act,the Endangered Species Act, and the Florida•Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times:while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom.All vessels will follow routes of I deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. d. All on-site,project personnel are responsible for observing water-related activities for the presence ofimanatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities wil'1 not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals mist not be herded away or harassed into leaving. I e. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville(1-904-731-3336)for north Florida or Vero Beach(1-772- 562-3909) for south Florida, and to FWC at IMperiledSpecies@inyFWC.com i f Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission(FWC)must be used(see MyFWC.com/manatee). ! One sign which reads Caution:Boaters must be posted. A second sign measuring at least 81/2"by I V explaining the requirements for"Idle Speed/No Wake" and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. Questions concerning these signs can be sent to the email address listed above. A I I I i i i CAUTION ,-, MANATEE HABITAT All project vessels IDLE SPEED / NO WAKE When a manatee is within 50 feet of work all in-water activities must SHUT DOWN Report any collision with or injury to a manatee: Wildlife 1-888-404-FWCC(3 J22) cell *FWC or #FWC { UNITED STATES DEPARTMENT OF COMMERCE �6yT OF�.� National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office = Q 263 13th Avenue South fOstnTnefP`�� St. Petersburg,FL 33701 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS 'I The penmittee shall comply with the following protected species construction conditions: i a. The permittee shall instruct all personnel associated with the project of the potential presence of.these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species. I b. The permittee shall advise all construction personnel that there are civil and criminal penalties four harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected u i der the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid I protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg,Florida. i d. All vessels associated with the construction project shall operate at"no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes(e.g.,marked channels)whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be I implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. I i I i g. Any special construction conditions,required of your specific project,outside these general conditions, if applicable, will be addressed in the primary consultation. h. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division(PRD)at(727-824-5312). i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereport.nmfsserknoaa.gov. j. Sea turtle and marine stranding/rescue organizations' contact information is available by region at http://www.mnfs.noaa.gov/pr/liealth/networks.htin. k. Smalltooth sawfish encounters shall be reported to littp://,a ww.flmnh.ufl.edu/fish/sharks/sawfish/sawfishencounters.htiul. - 1. All work must occur during daylight hours. Jv�,TlO P1Mp.Sgk.�ic` X G 4 a< 'S 4�CNT Of GOy'F i f i i I i i ,i � 1 k1' $ F vr i iEXlstin Cosculluela Residence i 9 Wilco Construction, Inc. Date:6115/21 Plan View Jens S. Ocean L Lot 875 (772)460-6928;FAX(772)460-6929 Jensen Beach, FL 34957 i i i I i i j pleat.w, ar J i Proposed Cosculluela Residence P 10701 S.Ocean Dr., Lot 875 Wilco Construction, Inc. Date:6/15/21 Plan View Jensen Beach, FL 34957 (772)460-6928;FAX(772)460-6929 f Pilings: TYPICAL DOCK AND ACCESSWAY CROSS SECTION Dock: min. 8"O, 2.5 (N.T.S.) CCA max. 10'OC i The work specified herein Boat Lift: min. 10"0, i has been designed and all 2.5 CCA PT wood work shall be in accordance per boat lift j with the 2020 Florida Width:4',10' dimensions i Building Code(7th Edn.). All codes reference herein ,T o are per the latest adopted \ edition. j i / � �1 j // Permit Number rt t i i STRINGERS: Decking: 56-405630-001-Fr 2 x8 0.4 ACQ spaced o; 1 x6 Composite Decking r 9 at max. 18"with min. 1/2"SS p g fastened t d 1 ¢ Southeast vistriet , J lag bolts on each piling(lap w/min.2.5"stainless steel compositeotiy spliced) decking screws a��--- ,I azvis i NOTE: VX N H— Design loads to meet 2020 FBC-7th Edn.! Wind load as per ANSI/ ASCE 7-16 Speed= 170 mph 2 16d Toe } I m Nails Typical Exposure D Block : Importance Factor=i1.0 M To bE added as needed: Joist: " � 2x6" 12 0.4 ACQ strap j" p 2 x8"0.4 ACQ on blocks @mid stringers each side of piling. I (fastened whin.3 ea. Bolted w/5/8" 1 min. "SS screws/nails) SS cut rods. i i I I I M.H.W. I I M.L.W. I i CANAL BOTTOM 6'min. penetration Lj I i Cosculluela a g Cross View Residence-Dock Wilco Construction, m ' � ' Structural Inc. N ' k i r GINEERING REVIEAT LIFT TOP CARRIER BEAMS AND IFIED ENGINEERED UNTING BRACKETS COMPLY WITH WIND DRAVWNG HAS BEEN PREPARED AD REQUIREMENTS OF THE 7TH EDITION SPECIFICALLY FOR USE ONLY BY., 020) FLORIDA BUILDING CODE, PER WILCO CONST. CE 7-16. AND PER DESIGN LOAD EQUIREMENTS OF THE 2 0 1 5 ----------------- LN .4LUMINUMA CIATIONS'S ALUMINUM UdifNUM DESIGN MANUAL. °°°p°°0°°°°0 BEAMS AND MOUNTING BRACKETS ° P M INSTALLED PER HI—TIDE INSTRUCTIONS WELL n" EXCEED ULTIMATE DESIGN WIND SPEED OF 'o p 200 MPH(EXPOSURE CATEGORY C OR D) N0.43655 o0 60ATS ARE TO BE REMOVc'D FROM BOAT LIFTS PRIOR TO A MAJOR WND EVENT. A � ©� vo'P SPATE OF 4� o PILINGS Ss Z 000�F 4 ORI OP 2 PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO ROCK STRATA, SUB—SURFACE CONDITIONS CAN ROGER BABER VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE P.E.NO. 43655 CAPACITIES TO COMPLY WITH MCR P2430 NE DIXVAL ENGINEERING 2430 NE DIXI£H FBC 2020. ALL PILINGS TO BE JENSEIN BEACH,FL 34957 8" MINIMUM DIAMETER 2.5 C.C.A PRESSURE TREATED WOOD, PRE—STRESSED CONCRETE OR COMPARABLE EQUIVALENT. Q �2 oK p,Vf4 \` PILING MOUNTING TABS MINIMUM (2) 3/8" DIA. SS LAG BOLTS FOR WOOD PILING OR ,�I Permii♦umber a`• SS CONCRETE ANCHORS FOR ! t ri i CONCRETE PILINGS PER PILING ELECTRICAL RENEW X2 ELECTRICAL REVIEW -6-40-630-001-Er•. I REQUIRED.MINIMUM (2) 3/B" 3/4 HP ELECTRIC MOTOR 1-1/2 HP ELECTRIC MOTOR ATTACHING MOUNTING TAB 70 10.6 AMPS®115V EACH --AMPS 0 115V EACH 1 xI DIA. SS CARRIAGE BOLT FOR J °' 5.4 AMPS®2JOV EACH 9.6 AMPSSnutht—tllistritl 230V EACH P i v,•' QUANTITY.' 2 OUANTITY.• 2 \ LIFT REQUIRED PER TOTAL WATTS 2484 TOTAL WATTS: 4416 0\ --_ J/ MOUNTING TABB CONSTRUCTED PILING. FROM 1/4" X 2" ALUMINUM `r SCY 6061— T6 FLAT BAR. T �vfF'wfl�is ' 1° BIM MONIPf S 12,000 LB. GEAR DRIVE & n BOATLIFTS AND MARINE PRODUCTS GEAR DRIVE X2 BOAT LIFT (2020 FBC) C Ll FORRTT PlE.RC�RCE✓TZ ROAD FL 34981 '�---- 1-800-544-0735 www.hi—lide.com ur R. HYDE SCALE. NIS DATE. 1/4/21 REV.• T —�� I 1 d � I 8 US fumy eorpa Protect Design Criteria Checklist for the U.S.Armv Corps of Enaimmn Jncksonsi0e District's Programmntic Biolooical Opinion of En9lrcers. Summary Checklist(bfust be submitted with all protects! Permitting Agency!s Internal Use Only: Date checklist sent to N&1FS Application 4 07/12/21 (b NVDD!YY) Tracey Reviewer Las1Nmue 56-405630-001-EE (epr Corps:sAJ-XIGe\-Xxxxe) Checklist Version' FDEP 1 Indicate the agency issuing the permitlauthorization Yes No Is this a re-verification,edit,or modification to a consultation previously submitted under JaxBO? I If yes to above,eater date of previous Tier II consultation ' If anotherNhlFS programmatic BO was used for the proposed project,please select name ofproruamrnatic BO used. I The Corps Project Manager or Delegated Authority has reviewed and confirmed that the proposed project meets all PDCs.It is the responsibility ofthe reviewer to ensure the proposed project complies with all the applicable PDCs.Please enter initials of reviewer. 10701 S.Ocean Dr.,Lot 875 Project Street Address 127.272 Latitude(decimal degrees,centroid of the project) Jensen Beach lCity -80.209 Longitude(decimal degrees,centroid of the project.Please include the negative symbol) St.Lucie County I Municipality(Puerto Rico&USVI) i Select all activities used for the entire proposed project: 1 [Z]2 3 4 E]5 6 7 8 9 10Superseding Process I Is the project located in Select DCH Are Essential Features Geoora phic Area I the peographic area? Unit Present? If Essential Features are present,enter area of im act I Smalltoolth Sawfish DCH Limited Exclusion Zones(APA) i 0 Yes GNo NIA N!A N/A GulfStjgeon DCH Migratory RestrictionZones(APA) ( Yes ONo NIA N/A NIA Atlantic Shur eon DCH Exclusion Zone APA I ) Yes %No NIA N/A No activities allowed here! North-4111 I antic Right Whales Educational Sign Zones APA eyes No NIA N/A N/A I i U.S.Caribbean Sea Turtle Critical Habitat Restriction Zones(APA) 0yes ONo NIA N!A N/A I Bnde's whole Exchrston Zone(APA) (0 Yes eNo WA NU No activities allowed here! Smalltooth sawfish DCH Yes f�.No _ 'Yes �No LF of Red Mangroves SF of shallow etuyiraline water I Gulfsmr¢eon DCH .-Yes i�.No Yes `No SF ofesseutial features Lo rheaId sea turtle(1sRVA DPS)DCH'- I .�Yes �.'No �' Yes J No SF of essential features Green sea turtle(NA DPS DCH I Yes ONo N/A J Yes No SF of essential features Hawksbill sea male DCH Yes �r No MIA ' Yes No SF of essential features Leatherba'ck sea tattle DCH I Yes eNo NIA 0 Yes No SF of essential feahves '• No impacts to essential features alloxved. Staehoro and elkhom Acro ora)coral DCH Y-es No - Yes �. No r'nPa Johnson's isen sDCH ' Yes •)No D Yes •-No 0.00 SFofessentialfeahves North Atlantic light whale DCH Is ��;No .+ Yes No SF of essential features I Atlantic stur eon DCH I , Yes �;No NIA No activities allowed lucre! I I 0 Is the Project in or near areas with mangroves,seagrasses,corals,or hard bottom habitat?Does it comply with PDCs for Mangroves,Seagrasses.Corals.and Hard Bottom for All Proj ets(AP.3) Resourcel Present in the project footprint? Square Feet of Impact btangmvel -' Yes C.; No 0.00 Nonlisted Sea , ^ Yes ! No 0.00 I I Johnson's Sea s Yes No 0.00 I Listed Corals 0 Yes No 1 0.00 rN Nonlisted Corals Yes �' No 0.00 Hardbortom 0 Yes No 0.00 I I I ; i SF of Overwater Impacts(area of structure over/above the water surface,e.g..docks or canopies) POOSF of Total fit-water Impacts(area of substrate that is1pentumautly changed below MRIV,e.g.,by seawall,ripmp,or cross-sectional area of piles) 17-71 Yes I Applicant agrees to adhere to PDCs fort'br-Waterdctivtlrfes(APA)as described in AP.7 through AP.11 MYes I applicant agrees to perform all acti— during daylight hours(AP.6). 0 Yes I E) No Is the project within the boundary ofth I4Florida Keys National Marine Sanctuary(FKNIv1S)? Yes I If within the boundaries ofFKNb1S,received NOA A authorization? I i To be completed by applicant or agent ifpernit is issued by a delegated authority(FDEP,Miami-Dade,etc.)Please enter full name of applicant or applicran's representative: I J.Coseul luela The applicant or applicant's representative eusums the project complies with the PDCs and all information in this form and individual checklist(s)is correct Comments:1 Install 1 ea. 4 piling boat lift and approx. 220 sq.ft. dock over mean high water. Existing seawall to remain,. i r Checklist Version:Select 1 if it is the first time you are submitting the consultation.Select 3 if you made an error or the project bas changed and you need to resuubtarit the checklist. Version(4) 1 1/24/2618 '-The project may be located in two different Loggerhead DCH Units.Select all that apply.If there are more than two,please add to the Comments section 1 .1 R M US Army Corps of Engineers. Project Design Criteria Checklist for the U.S.Army Corns of Engineers.Tacksonville District's Programmatic Biological Opinion(JAXBO) Activity 2:Pile Supported enc tnIt use: 07/12/21 ate checklist sent to NMFS Tracey 56-405630-001-EE Checklist Version (MMIDD.,' Y) PM Last Name Application it Proposed Activity(Select all that apply): 0 Dock New =MooringDolplun piles =Chickees =Temporary structuresibuoys =Dock Repair =Mooring buoys =ATONSJPATONS =Other(Provide description in Comments box at bottom) =Dock Replacement =Mooring fields QBoatlift Select the typeluse of the strucure Enter information about the proposed activity: =Total number of existing dry slips =Total number of existing wet slips =Total number ofproposed dry slips =Total number ofproposed wet slips Piling Installation Data: Enter data as appropriate for different pile types used. JAXBO does not cover installation of metal piles or sheet piles with impact hammer(AP 2;Section 2.2). Pae Pile Type 1 0 Pile Type 2 Pile Type 3 Pile Type 4 13 Number of Piles Number of Piles Number of Piles Number of Piles t Size of each Pile(sq.ft.) Size of each Pile(sq.ft.) 0 Size of each Pile(sq.ft.) Size of each Pile(sq.ft.) wood Pile Material Pile Material Pile Material Pile Material Drop Fund Installation Method Installation Method Installation Method Installation Method coonoeasoace Project in Open-Rrater or Confined-Space Environment(AP.2;Section 2.2)? 0 Select Noise PDC Category(AP.2.)as detailed in(Section 2.2). For commercial/multi-family.-public facilities and marine events which of the following signs will be posted(A2.2.)Select all that apply: = Save Sea Turtle/Sawfish/and Dolphin Sign = Help Protect North American Right Whale =Report Sturgeon = U.S.Caribbean For coinmerciallinulti-familylpublic docking facilities/monofilamem recycling bins will be installed.(A2.3) North Atlantic Right Whale Educational Sign Zone:Is the North Atlantic right whales handout included as special condition of permit(A2A.)9 Does the project include a municipal or commercial fishing pier? Is dock within visible distance of an ocean beach? 01f yes;is nude-friendly fighting installed as required by JAXBO(A2.8)? Will project construction take place from uplands or from floating equipment(e.g.barge)as required(A2.9)? QDock Construction Scenario included as a special condition(A2.17)? For projects located in Designated Critical Habitat:please complete applicable section below: P-0-1 Is the project located in the geographic area of Smalltooth Sawfish Critical Habitat? ' =Is project located in smalltooth sawfish limited exclusion zone? No Is the project located in the geographic area of Gulf Sturgeon Critical Habitat? Enter width of the area(e.g.chacmel/bay)if in a the Gulf sturgeon critical habitat migratory restriction zone(Section 2.1.1.2) Select additional noise restrictions required as special condition in Gulf sturgeon critical habitat migratory restriction zones(A2.11). No Is the project located in the geographic area of Acropora Critical Habitat? = Are essential features present? =Is hardbottom present in project footprint? (AP.14). yes Is the roject located in the geographic area of Johnson's Seagrass Critical Habitat? Rater depths(insert range of water depths where project will occur as minus ML NN,� No Project includes a new marina or multifamily facility(A2.14)? No Does the project include repair/replacement and reconfiguration o£existing marinas or multi-family facilities? Ifproject is repainieplacement and reconfiguration of existing marinas or multi-fancily facilities then select all that apply under JA3030(A2.14): = Occurs within same overall footprint(out to the perimeter of the facility including the outer limits of the structure and permitted mooring locations). = Does not increase the total aerial extent(i.e.area of coverage from the dock structures)of the existing facility. = Does not affect Johnson's seagrass. No Is the project located in the geographic area of Nearshore Reproductive Habitat of NWA DPS of Loggerhead Sea Turtle Critical Habitat? = Does the project include the installation of a structure other than ATONs(A2.15)? No Is the project located near sea turtle nesting beaches in the geographic area of U.S.Caribbean Sea Turtle Critical Habitat? =Does the project include the installation of a structure other than ATONs near sea turtle nesting beaches(A2.16)? Comments: NOTE: 6/15/21 seagrass survey, barren bottom. Please note this checklist does not contain all of the PDCs.Please refer to the Biological Opinion to confirm the project meets all TDCs prior to completing this checklist. Notes in parenthesis refer to corresponding section of JAXBO. Version(4) 11/24/2018