Loading...
HomeMy WebLinkAboutMaverick Boats - PERMIT 2105-0262 - steel connections inspection report - ENGINEER'S REVIEW LETTERWieder Engineering, IncWieder Engineering, IncWieder Engineering, IncWieder Engineering, Inc 11718 SE Federal Hwy.. #373 Hobe Sound, FL 33455 (772) 546-5823 Cell: (772) 618-3437 Fax: (772) 545-3734 E-mail: awieder@wiederengineering.com E:\Work\#1 K Drive copy\Maverick Boat Group\Construction Administration\Bolt Letter - Maverick Boad Group.wpd December 14, 2021 Mr Roger A Priest Richard K Davis Construction Corp. P.O. Box 186 Fort Pierce, FL 34954 Re: Maverick Boat Group Phase II Expansion Fort Pierce, St Lucie County, FL Subject: Bolted Connections To whom it may concern: As stated in the letter dated December 6, 2021 prepared by Andersen Andre Consulting Engineers, Inc. (AACE File No. 21-152); it is our opinion the inspected field-bolted connections are in general accordance with the project structural plans and specifications. Please contact Wieder Engineering, Inc. If you have any questions regarding this letter. Wieder Engineering, Inc. Allen Wieder, PE, SECB FL 43444